"The
original dream for nuclear power was that it would create a world free
from deprivation and suffering; instead, with its need for a
rigorous security system, it is
opening up the prospect of a repressive
society in which dissent can no longer be tolerated."
Peter Bunyard, "Nuclear Britain", 1981, New English Library.
ISBN 0-450-05108-0
|
|
Last up-dated: 1/10/19

The beach bungalows at Braystones, Cumbria.
Visible in the background is St. Bees Head. The proposed RWE
power station, which was rejected by the government in 2012 as unacceptable1, 2, would have been on the fields to the right.
In August, 2012, a landslip derailed a train at the top of the
picture, a further one stranded the rescue train. The limestone patch on the right of the picture is the scene of a further landslip in 2014.
(The
railway serves Sellafield's nuclear flask trains and is little
changed from when it was completed in 1850. Residents have
complained for years about what they see as an unsafe line.)
1/10/19
Adrift with Électricité de France
We note press reports that stating that there is growing scepticism even
in France, home of Électricité de France, (who prefer to be known as EdF
in the U.K., as it perpetuates their myth that they are somehow an indigenous
U.K. company), that nuclear industry is stretching gullibility to new levels. The French Finance Minister, Bruno Le Maire, has been reported this week as saying that the French
nuclear sector was like “a state within a state” as he
denounced the recently announced cost overruns and delays in the
construction of the Hinkley Point C nuclear reactor in Somerset, pointing to similar difficulties with projects in
Flamanville in Normandy and Olkiluoto in Finland. “We will not
accept this drift month after month, year after year,” Mr Le
Maire said.
Source: Various, including https://www.thetimes.co.uk/article/hinkley-point-builder-accused-by-france-of-unacceptable-failings-r0plxjdvb
The latest fad to hit the nuclear stage is SNMs or Small Nuclear
Modules in plain parlance. The idea is that, as centralised
generation by nuclear plants as almost impossible to finance - let
alone justify - companies can set up their own
nuclear power station on a small scale. Derived from the
nuclear submarine motors, one of the main protagonists is, guess:
Electricite de France.
Pete Roche, a respected veteran fighter against nuclear power, has
submitted a report to Lancaster Council which argues cogently against
accepting nuclear proposals as part of efforts to end climate
change. The report is said to be, "In
response to the climate emergency Lancaster City Council should embrace
the local energy revolution, not old, dangerous, centralised, redundant
nuclear technology".
A copy can be found at http://www.no2nuclearpower.org.uk/wp/wp-content/uploads/2019/07/Lancaster_embrace_Energy_Revolution.pdf
The arguments put forward should help anyone not already in thrall to the
nuclear club to form a considered opinion and realise that the myth
of nuclear being in any way green cannot be substantiated.
An interesting development in the matter of marine concerns, has Sir
David Attenborough asking that areas of southern England be protected
from fishing in order to protect the kelp forests that provide a
nursery to small fry and are home to
sea horses. Of course the local fishermen, represented by
South East Fishermen’s Protection Association, denied they were
responsible, suggesting that the rising sea water temperatures were the
cause. Given the proximity to several
nuclear
power stations, in the U.K. and France, this seems highly feasible to
us. Last year we calculated that the proposed Moorside
development - now thankfully shelved - would have pumped 2½
billion gallons of sea water a day
through its pipes. That water would have been treated with
biocides and ultimately returned to the sea having been heated to
14½° above ambient temperature. Given the
inherent physical damage to marine life, as well as sterilisation of
sea water, the huge volume and temperature rise involved, one might
indeed think that - especially in the immediate
vicinity of the discharges - there would be a devastating impact on
marine species. We produced our own figures for the various
existing and proposed nuclear power stations around our area in a
document which we titled "Heatsinking Nuclear Power Stations".
The myth continues to be promoted by the nuclear society that
the oceans are infinitely capable of being polluted - whether by
chemicals or by heat.
Researchers have already published papers in relation to the rise of 0.6° which has affected the Irish Sea:
Seabed Habitats of the Southern Irish Sea:
Karen A. Robinson, Andrew S.Y. Mackie, Charles Lindenbaum, Teresa
Darbyshire, Katrien J.J. van Landeghem, William G. Sanderson
The Hinkley C power station will produce similar amounts of hot
water. We would remind people that for every watt of
electricity produced, the thermal equivalent of twice as much energy is
produced. Even the government accept that
nuclear is only at best around 30% efficient. An interesting
Environment Agency paper on the effects of the various power stations
around the U.K., entitled "Cooling Water Options for the New Generation of Nuclear Power Stations
in the U.K." can be found at:
https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/291077/scho0610bsot-e-e.pdf
27/7/19
Old Friends Never Die
Our old friends, Électricité
de France, now aggravatingly a primary sponsor of Classic FM - with
their adverts suggesting they somehow produce clean and green British
electricity - are having a few problems with their Flamanville site,
yes, again. They really don't want to repair faulty welds;
really, really, really don't want to, but those nasty people at
the nuclear safety department are insisting that they should actually
go back and do the job properly. This is a decision that will
cost many millions of euros and further delay the project by at least
another three years. The initial cost was supposed to be around
€3½ billion which was supposedly also due to cover any
initial problems which may be encountered with a major new design.
The cost has already reached more than three times that.
The idea is that any other projects using the same technology will
enjoy economy of scale. Perhaps by that they mean that each one
will encounter even more problems and cost even more?
We were entertained and a little amused by the article in today's Times, by Alistair Osborne, on the matter.
Ref.: Flamanville points to nuclear fiasco, The Times, 27th July, 2019.
1/7/19
Chernobyl Fall-out
In the wake of the unexpectedly popular mini-series
on Sky Atlantic about Chernobyl's effects, and the publication of
several books on the subject, the pro-nuclear lobby are hard at work
pretending that any adverse effects are being exaggerated. After
all, the radiation to which locals around Chernobyl are exposed is
(according to them) only the same as that endured by anyone on cross
Atlantic flights. One does have to wonder how many of the 30,000
children with nodules on their thyroid glands have had that particular pleasure.
Surely there is also some difference between flying across the
Atlantic for eight hours or so and being permanently exposed to the
material from Chernobyl.
Three books have offered further enlightment: Chernobyl Prayer,
by Svetlana Alexievich (winner of the Nobel Prize in Literature, ISBN
978-0-241-27053-0) is a collection of personal accounts of people's
experiences and recollections of the event; whilst the
oddly-named Manual for Survival, by Kate Brown (ISBN 978-0-241-35206-9)
is an extremely well researched account of the way in which those
national and international bodies charged with guarding people's health
and well-being have deliberately distorted facts, figures and medical
information in order to avoid telling the public what is really going
on and the consequences of an incident at any nuclear power station or
processing site.
The third book "The Legacy of Nuclear Power" (ISBN 978-0-415-86999-7)
is by Professor Andy Blowers. Despite being the chair of
the Blackwater Against New Nuclear Group, opposing new nuclear
development in his area, Professor Blowers seems happy to support the
notion that the majority of Cumbrians are pro-nuclear and thus would
support most nuclear development in Cumbria, whether the dump or the Moorside project. To us this seems to
be a typical NIMBY attitude. We don't want it near us, so foist
it on someone at the other end of the country, they've already got the
worst of it, so they might as well have the rest of it.
There is quite a long section about Sellafield,
about which Prof. Blowers is obviously well-informed, but he is quite
assertive that the plans for the dump and the now-defunct Moorside
power station would be supported by locals. Presumably if one
mixes mainly with the nuclear people, this attitude is the prevailing
one. On the other hand, we, because of our views, have mixed
with non-supporters and have the opposite impression. This, to
our minds
demonstrates the effectiveness of nuclear propaganda machine.
Along with many, many others, we fought against the other two major
developments: RWE's at Braystones and Kirksanton, and figured
(incorrectly) that the dangers of building anything within the existing
safety zone of Sellafield would automatically be refused. Large
numbers of real people - not those engaged in the industry, or in some
way beholden to it - supported the opposition. The only ones in
favour of the project were the usuals with their tunnel vision, unable
to see any other future for Cumbrians than working in a dying nuclear
industry. When the nuclear dump was rejected by the County
Council it was partially because so many of the local parishes had
voiced their opposition. These are local people engaged directly
with local residents and are acting on their behalf. The vast
majority
of them see the nuclear industry for what it is: a polluting,
scheming, secrretive, bullying group headed by people with no
allegiance to Cumbria and whose influence is far in excess of that
which it should be permitted to have by any fair-minded non-corrupt
government.
Although the book was obviously written before Moorside was abandoned
by NuGen, following local opposition and an inability to attract
funding
(one doesn't wonder why), Blowers still writes that the dump
should in Cumbria because of local support. As there has
been no independent enquiry or referendum - apart from one designed by
a locally prominent nuclear lobbyist with the specific aim, via
"clever" questions of "proving" that locals would support expansion of
the nuclear industry, we consider Blowers' views a trifle skewed.
Amusingly, the nuclear industry have fought back against the bad
publicity of the Chernobyl series by publishing pictures of tourist
enjoying the decayed town of Chernobyl, ostensibly demonstrating how
safe it now is to be there on holiday. Meanwhile a Russian
producer is making a version of the events that is more to the liking
of the Russian government. The manner in which the various
disparate nuclear support bodies ganged together to minimise the bad
news emanating from the Chernobyl disaster is illustrated very well in
Manual for Survival mentioned above.
Also of note: The toxic cloud of lies over Chernobyl, Ben Macintyre, The Times, 1st June, 2019
29/5/19
Missing From The Tourist Map
On
a trip today to visit some of the attractions of the Western and
Northern fells, we stopped for afternoon tea at a place in Buttermere,
where we chanced upon a visitor guide to Lakeland. We were
greatly amused to note that Sellafield and its housing estate, Seascale
- once a budding holiday destination in its own right, had been
completely expunged. Any innocent visitor would never guess that
they were so close to the most dangerous chemical plant in Europe,
despite it being clearly visible (conditions permitting, of course),
from most of the western fells.
Published
by Welcome Guides Limited, it is obviously aimed at the yoof who have
little interest in just visiting the natural lakes, but who need to be
entertained at all times with zip wires, mountain biking, etc., and
those who are complete strangers to the other side of Cumbria -
literally and figuratively.
The guide is downloadable from Welcome Guides Limited. via http://www.wel2.com/brochures/

A new version of Where's Walley. Sellafield is where the rivers Ehan and Calder meet the sea at 120/D0 and
the site covers 6 sq. km., with some structures attaining over 200' in height, so is not easily overlooked.
Wonder how that could happen?
29/5/19
Political Independence and Getting Out While the Going is Good
In
the current edition of the Whitehaven News, the local M.P., Trudy
Harrison, demonstrates just how committed the local politicians are to
perpetuating Sellafield and nuclear power - despite the constant
analyses pointing out the fallacy of perpertuating an industry that is
now out-moded, an incredible danger to the public, is far too expensive
to ever be sustainable, cannot attract private investment, is
uninsurable, and has no method of disposing of its wastes.
However, it continues, the local vested interests (insert all the usual
names here) are banding together to promote nuclear as the way forward,
using its influential friends in Westminster to do so. Let
us hope that lessons might at last have been learned and the new
proposals ignored by the so-called decision-makers.
Ms.
Harrison is happy to promote large and small reactors, seemingly
oblivious that others are against the industry altogether.
The same week we have seen headlines about Centrica (British Gas in
days of yore) wanting to get rid of its 20% share in the remaining
nuclear power stations. Surely that might indicate
something? Those guardians of safe nuclear, old
friends Électricité
de France,
own the other 80%. Articles in The Times suggest that the
remaining nuclear generators have cracks in them and will require huge
amounts of money to keep them going and/or de-commissioning
them. In the meantime, as we mourn the loss of yet another
ex-Sellafield worker friend from cancer, your prayers are asked for
those living within range of the remaining potentially unsafe nuclear
power stations.
"Centrica is moving away from large, centralised power generation while increasing its services offerings." Might one add, "before anything truly horrendous and expensive goes wrong"?
Ref.: https://uk.reuters.com/article/uk-britain-centrica/centrica-aims-to-sell-uk-nuclear-stake-by-end-of-2020-idUKKBN1JA19C
Share
values in Centrica rose 2.1% following the announcement.
That, too, must surely mean something? Presumably the news was
accompanied by a huge collective sigh of relief. Presumably
the U.K. taxpayer will still be at risk as the insurer.
Another
article in the same edition of the Whitehaven News extols the happy
prospects of the under-sea coalmine, and further expansion of the
nuclear industry in Copeland. The promoters are happy that
natural assets be permanently damaged merely for the sake of remote
beneficiaries. As we said some time ago, what will be left
when the outsiders have concluded their operations?
Whatever they leave it seems unlikely that it will attract further
inward investment or tourism. To us, it seems that the sole
future for nuclear is at Sellafield, where they will be involved in
treating nuclear waste until well into the 22nd
century. Of course, this means, too, that the inventory of toxic
waste will continue to rise and discharges into the Irish Sea will
continue, much to the aggravation of Irish and Manx governments, as
radioactive materials are shuffled around in the pretence that they are
being "cleaned". As one Russian politician commented following
Chernobyl, "Well, the polluted areas are becoming less radioactive every day".
Last
July the Guardian, attributing the news to SparkSpread, announced that
three banks were seeking buyers for 49% stake in UK nuclear power
stations. Électricité
de France is understood to have piggybacked on the sale after the British Gas-owner, Centrica, announced its plans.
The report continues, "State-owned
China General Nuclear Power Group (CGN), which has a third stake in
Hinkley Point C and wants to build its own reactors in Essex, has been
named as a potential buyer."
When
mobile phone company Huawei are considered by the knowledgeable to be
dangerous because of their direct links to the Chinese government, is
it not, as we have often said, even dafter to be considering trusting a
foreign entity, whether Chinese or other, with our nuclear industry?
The Guardian observes that private investors "have generally steered clear of nuclear".
Russia is another major nuclear power player, but ownership of UK
plants would be politically unacceptable. Where is the
difference? Aside from the fact that the Russians, or at
least, the Belarusians and Ukranians, have experienced the
after-effects of a nuclear power plant exploding.
19/5/19
At Last, Some Honest Facts
A
chance observation of a book recommendation in an edition of The Times
led to the purchase of a copy of "Manual for Survival", a Chernobyl
Guide to the Future, by Kate Brown. (ISBN:
978-0-241-35206-9). Despite feelings that the title is
somewhat misleading, we appreciate the long hard look at the effects of
the 1986 Chernobyl explosion and its impact on the regions where the
fall-out landed. We have pondered in the past over the
discrepancy in fatalities listed by the various "expert" bodies
involved. The book explains how the figures have been
manipulated and why they range from the WHO's 54 through to over a
million according to Greenpeace, although some official bodies have stuck with a mere 31. For anyone who wants to know
how and why, this book is a must. Brown concurs with our
statements over the years that radioactivity cannot be "cleaned up" as
those knowledgeable and competent scientists and politicians would have
us naiively believe. All that can be done is to move it to
somewhere where it does less harm and then left to decay naturally.
Human intervention does nothing to speed this process up.
The original concept of "infinite dilution", such as dumping the
material into the sea, has been demonstrated to be wrong, too.
Ms. Brown explains why, unlike previous studies after the bombs at
Nagasaki and Hiroshima, proximity to the source of the ejected material
from "domestic" power stations is no guide to the dose of radiation
received, the principle being subject to a vagary of the climate and
the way in which the material is blown and what happens to it after it
lands.
The inevitable failure of the government to deal with the situation is
extant globally. The image of soldiers with Kalishinkovs turning
up to deal with a nuclear explosion would be laughable were it not for
the seriousness of the consequences. Actually, there were
suggestions that an attack similar to that on the twin towers, using an
aircraft (bearing in mind that over 70 aircraft a week fly over
Sellafield - or within a few minutes flying time away -leaving little
chance of them being intercepted) could be countered by placement on
the site of an anti-aircraft gun to shoot the plane down. One
can imagine the scenario, but at what point and by whom is the decision
taken - assuming that there would be just 1.8 minutes warning.
As we noted in an earlier article, it took the RAF 20 minutes to
scramble and get to Sellafield when a light aircraft over-flew the
site.
However, just what would other governments
do in the event of a major leak at Sellafield, or any of the other
nuclear sites ? Given the state of some the waste storage
containers, not a
far-fetched scenario, and how far would the effects of highly
radioactive
material travel. How many people would be affected no matter
which way the wind was blowing at the time, or immediately after?
The conclusion has to be that a "domestic" power station
contains all the destructive power of a nuclear bomb, but with the
added problem of long-term exposures with their medical consequences.
Is this,
then, a sensible option when there are alternatives?
See Facts (1) for further comments derived from the book.
7/1/19
Hi! Surprise! We're back Again! Only The Rules Have Changed
Some
years back local residents were presented with not only the NuGen
project, but also the ridiculous idea of an underground
dump. We were promised that if any one or more of the three
local government bodies, Allerdale, Copeland, and Cumbria County
Council, rejected the proposed dump, the whole idea of locating it in
Cumbria would be concluded - permanently. Yes, we were
sceptical when Cumbria County Council did reject it and the proposal
had come to an end. Especially when it was also -
apparently to the astonishment of central government - that not a
single other council had expressed an interest. Seemingly
not a single body wished to assist in the disposal of the most
dangerous chemicals produced by man, of which a even microgram would
prove fatal if ingested, and the entire stock would remain highly toxic
for millennia. After all, we were assured, the material
would be safely encased and the dump designed by experts.
Like those who designed the twin piles - which would, but for the
intervention of Cockroft, have been built without even the basic
filters, corroding ponds and the Thorp plant, presumably.
These people knew what they were doing and we could trust them.
There is no way that anyone is at risk from the industry and nothing
will ever leak from the site. See our article on 26/11/18, in Facts (2), entitled, "Dealing With the Waste"
Hmm, tell that to the 1596 people put foreward for compensation under
the Compensation Scheme for Radiation-linked Diseases. Still,
they have only cost a mere eight and a quarter million pounds. Peanuts on the scale of the industry.
When the early plans were
rejected, cynics (yes, like us,) suggested that all that would happen
would be that the rules would be changed. The presumption
from the outset had been that Sellafield's propaganda and infiltration
machine would have done its job. Representatives were
ensconced in all the local councils and decision-making bodies and the
clever people who designed questionnaires had come up with a suitable
referendum that would produce the support required. As with
the flawed contract award mentioned below, the whole exercise was a
forgone conclusion. Wasn't it?
Sure enough. A
couple of years on, NuGen have left the scene, suitably peppered with
boreholes, and Sellafield are looking for somewhere to store the high
level waste. (Of course, they still manage to convince
themselves and government ministers that there is support for the
industry in Cumbria!) So central government have indeed changed
the rules. Now only one council need agree to hosting the
dump. Guess what! Copeland are supporting the
quest. All those years of stuffing committees and financing
schemes that should have been in the province of central government may
yet pay off.
Plans for a 140'
high storage area on the Sellafield site has already been
approved. Strangely, bungalows on Braystones beach are not
allowed to go above the height of the railway line behind them.
According to a Times article on 4/1/19, "a
million tonnes of nuclear waste could be buried under the Lake District
after the government removed the right of county councils to veto plans
for a vast underground dump.
Helpfully, the article carries a suitable graphic to simplify the project for those of limited intelligence, before continuing:
"The
£19 billion “geological disposal facility” will have
an underground area of up to 20 square kilometres, with radioactive
waste stored in vaults at depths of between 200m and 1km.
Copeland
borough council in Cumbria — the home of Sellafield, where most
of Britain’s nuclear waste is stored — had wanted to be
considered for the dump because it would create thousands of highly
paid jobs and require local investment."
It explains the new rules:
"Now
the Department for Business, Energy and Industrial Strategy has
published a plan for “the long-term management of higher activity
radioactive waste” that prevents any one council in areas with
two tiers of local government from pulling out of discussions on
hosting the dump. Both councils can choose to withdraw but “no
single principal local authority will be able to unilaterally invoke
the right”.
Cumbria county council may
also be forced to join a “community partnership” set up to
consider hosting the dump. The plan says councils must be part of one
to have a say.
There are, fortunately, still some naysayers:
"Stewart
Young, the county council leader, said: “If you get into the
process you then become locked into it. They are trying to force our
hand.” He said the Lake District’s geology was unsuitable
for the dump and that waste that would remain radioactive for 100,000
years could leak into water supplies."
However, the article explains:
"Richard
Harrington, the nuclear energy minister, last year refused to exclude
national parks from the search for a site for the dump. While it could
be under the Lake District, the entrance to the network of tunnels and
vaults could be outside the national park, possibly close to Sellafield
to minimise the risk and cost of transporting the waste."
Eddie
Martin, the former leader of Cumbria county council and director of the
Cumbria Trust, which opposes a nuclear dump in the Lake District, said
seismic surveys needed to assess the geology would require large areas
to be closed to the public while thousands of boreholes were drilled
and charged with dynamite. He said: “It will be enormously
disruptive to Cumbria. Are you going to come to the Lake District as a
tourist if you know you are walking on a radioactive pile?”
Mike
Starkie, the mayor of Copeland, said the council was considering the
plan but his area might offer again to be a location for the dump.
“We agree with the idea of a geological disposal facility because
it’s a safer way of storing it,” he said. “At the
moment we have 80 per cent of the country’s nuclear waste and
it’s all stored on the ground.”
The
government has offered communities up to £1 million a year for
about five years to take part in discussions about hosting the dump,
rising to £2.5 million a year for up to 15 years while test
boreholes are drilled. Construction is not expected to start until
after 2040.
There
will be a “test of public support”, which could be a
referendum, before a final decision is made. However, only a small
proportion of the local population may get a vote as “only
residents in the area that will be directly impacted by the development
should have a final say”.
Ref.: https://www.thetimes.co.uk/article/radioactive-waste-could-be-buried-under-lake-district-rqxpm9pjw
Well, we have seen the way
that the likes of Clarke, NuGen, and co., work. The local
population will only be given a vote under the conditions deemed by the
powers that be will provde the answer they want. Any
refusal will merely be ignored, or the rules will be changed yet again,
and again, until the "right" answer has been given. When
there is no alternative site on the cards, desperation if very likely
to set in.
NuGen was quite happy to
quote job numbers for the area, but couldn't justify their
figures. Most of the NuGen jobs, as with this underground
dump, would be solely for the duration of the excation and
construction. Thereafter redundancies will render the
entire area highly contaminated wasteland with extremely high
unemployment..
Yet again we are reminded of
the quote we used some time back from the experiences of Romanian gold
mining. They were lucky, their toxins, in comparison to the
nuclear industry's, are pretty tame.
26/11/18
No Animals were Hurt and There Was No Risk To the Public
(To be Repeated After Each Incident.)
On the third of May, last year, the BBC broadcast a television
programme entitled, “Britain’s Nuclear Bomb: the
Inside Story”. It was repeated last week.
The overwhelming characteristic of the people
depicted – all of whom were respected scientists and thus, one
presumes, clever people – was the total lack of concern at the
monster they had developed. They were all far too egotistic
and extremely proud of the fact that they had managed to achieve
something new, despite all the odds being against them.
Neither the
huge numbers of people who would be damaged or die, nor the
pollution that would be imposed indiscriminately on the entire planet
as a result of their experiments
were of the slightest concern to them. Their ability to
divorce
themselves from the consequences of their actions was frightening.
In the programme, Ken Johnston,
former Chief Scientist at the Atomic Weapons Establishment,
Aldermaston, in talking about the qualities of plutonium says, “It’s
an extremely dangerous metal. It is
radioactive. It is very toxic, so, if you ingested it, it
will go into various parts of your body and irradiate it.
“You
really don’t want more than a microgram ever to
escape. A millionth of a gram is bad news, so it is that
toxic, and if you assemble too much of it in one place you will have a
chain reaction which will throw it apart and produce a flash of
radiation which will kill most of the people within a fair distance of
it. Not immediately, but over a few days. So it
is extremely dangerous stuff and has to be treated with extreme care.”
There are 140 tonnes of the stuff stored at Sellafield.
There have been frequent accidental escapes (some
very convenient to Sellafield) and deliberate discharges of radioactive
materials. For example:
Following the
discovery of a huge leak in 2005, there was an investigation by the
Nuclear Installations Inspectorate - now the Office for Nuclear
Regulation (ONR). Their report on the incident, later that year, said that 160kg of plutonium was leaked. The report concluded that the company had been in breach of nuclear site licence conditions at Sellafield.
Dr. David Lowry, writing in the Ecologist notes,
"The most extraordinary conclusion of the report reads: 'Given the
history of such events so far, it seems likely there will remain a
significant chance of further plant failures in the future, even with
the comprehensive implementation of the recommendations of this
report.'"
Ref.: https://theecologist.org/2015/aug/12/inside-sellafield-and-military-plutonium-bbcs-nuclear-lies-omission
Cumbrians were advised that the site was being built
to generate electricity, which was a lie. The generating
capacity was merely a by-product of the industry built to produce
plutonium. The generating plant was closed in 2003 and since
that time the site has been a consumer of electricity from its own
power plant at Fellside.
There seems to be an innate lack of ability amongst scientists to
recognise the dangers they are imposing, or indeed, to provide for the
future decommissioning of the plants and objects that they produce.
Virtually all the structures at Sellafield are corroding at a
faster rate than was expected and yet, truly intelligent people would
have recognised that the combination of heat, chemicals and a strongly
salt atmosphere, combined with a region with an annual rainfall of over
80" (more than 2000mm) might just lead to a high corrosion rate.
If they had thought to ask the locals, I'm sure they would have been
informed. Anyone who has bought ferrous-based tools in the
locality will know that they will be rusty within a year - even
stainless steel fails to survive.
The nuclear industry was founded on lies and the Cumbrian residents
believed what the government told them, as that was the obedient
mentalilty in that era. However, times have moved on and there
is now a requirement for openness and honesty from politicians and
industry leaders. Neither scientists nor government
representatives know enough about the disposal of nuclear waste to
genruinely be able to dispose of it, so the production thereof should
also be terminated - at least until such time as firm guarantees, not
scientific pipe-dreams can come up with a proper solution which does
not entail shoving it down a hole and forgetting it.
12/11/18
Toshiba's Happy Decision
The announcement last week that Toshiba is now
pulling out of the Moorside project is good news to those who love the
Cumbrian countryside. Even after the announcement, those with
their vested interests are scurrying round trying to find alternative
means of funding the ludicrous plan. Interestingly, virtually
every one of the stories - and it was covered in every newspaper and
regional news reports - have focused on the financial side of the
matter. Even if funding were to be found to enable the project
to go ahead, it does not alter the fact that there can be a less
suitable site on which to put it. Who in their right mind would
put another nuclear plant alongside the huge white elephant that is
Sellafield? As we have said from the beginning, one incident at
either plant will inevitably affect the other, compounding any risks
and extent of damage. No amount of money will change this fact.
Currently the government are stuggling to justify becoming involved in
the Wylfa project on Anglesey. Their policies prohibit such
investment, yet still they determine to find a way.
Sellafield's unions are said to be deeply unhappy about Toshiba's
decision, but what union would support an industry that has afflicted
1,596 of their members and families* with serious industry-related
illnesses? Surely the unions should be promoting the health and
well-being of its members, not toeing the management line?
* Source: CSRLD website, Annual Report (http://www.csrld.org.uk/html/annual_statement.php)
This evening's North West Tonight news on BBC reported that John
Woodcock, MP, likened the decision to "throwing Cumbrians under a bus".
Surely the Cumbrian residents will welcome Toshiba's decision
which has reduced the risks of being affected by nuclear-related
illnesses and potential disasters? In the best Sellafield
tradition, the local MP is an ex-employee, thereby ensuring that they
get the best deals. Logic is not a requisite for extolling the
nuclear industry, which is patently non-viable even on financial
grounds. So, Trudie Harrison, Copeland MP, is said to be
"meeting ministers to discuss the future for the industry" after the
demise of the Moorside project. We are sure she will be well
rewarded when the time comes.
Accuracy is, typically, not required for politicians. In a case
of perhaps over-egging the mix, Harrison's web page informs us that
21,000 jobs are involved at Sellafield. Strange, when
Sellafield's own page says only 10,000 . . . How many are
held by local residents or indigenous Cumbrians is unknown.
Moorside had several different, conflicting, numbers for employment.
The smaller print, buried deep, made it clear that the numbers
stated were peak levels during the construction phase only. The
number of permanent jobs was far smaller than the permanent fixed
force.
Still, small numbers are not at all impressive - unless being used to
express damaging processes, like the 2½ billion gallons of water
per day that would have been used to cool the plant, which could be
expressed as 45 cumecs per second. This seemingly small amount
of water was to have been heated by 14° above intake temperature
before being returned to the Irish Sea contaminated with biocides.
Worth fighting for - or against?
6/11/18
The Times They Are A-Changin'
For many years now we have been explaining just why it is not a good
idea to give control of our vital services to foreign companies.
The recent events on the world stage illustrate our point more
eloquently than our pleadings. Virtually every major power has
been posturing and, without doubt, committing serious crimes.
Corruption is evident in so many states. It seems that owning
major companies and being granted huge rewards is not enough - just how
much will be enough for these people?
As we have suggested, there is no way that any respectable government
would be encouraging such traits by allowing them control of such
things as our power networks - yet for reasons which are not yet
apparent, those in charge in our government seem willing to gamble,
despite the over-whelming evidence that they (and thus, we) will lose.
What due diligence should have revealed is only now becoming a
hazy illusion to them. The French government are apparently now
unlikely to progress with further nuclear development, and many
knowledgeable Frenchmen have expressed serious doubts over whether the
EPR will work safely - if at all. The burgeoning cost of
maintenance and replacement of the aging French reactors is
beginning to make people question the future viablility of nuclear.
Bloomberg reports (https://www.bloomberg.com/news/articles/2018-08-28/france-s-nuclear-future-in-play),
"France produces almost three-quarters of its electricity from nuclear
power. That didn't sit well with Ecology Minister, Nicolas
Hulot, who abruptly quit his post after he failed to convince the
government in questioning the use of atomic energy.
President Emmanuel Macron, aiming to boost renewables as he prepares an
energy policy road map for the next decade, has pledged to cut the
share of nuclear in the country's power output to 50%, though state
controlled Électricité
de France
SA has lobbied him to agree to new reactors as its fleet ages.
The Christmas turkeys are still uncooked and voting against being
killed.
At home a committee has expressed grave concerns about the lack of
progress being made by the NDA in the decommissioning of Sellafield,
where apparently the steel barrels being used for temporary storage of
the waste are rotting rather quicker than the usual tribe of experts
predicted. Yet a glance at the relevant sites reveals the usual
guff about marvellous events and propaganda exercises. On the
23rd of October, 2018, the government announced that a record 1,700
visitors enjoyed a day of exhibitions and informal networking.
All well and good, cosy, even. What of the main event?
There is, of course, still nowhere for the waste to be stored for
eternity. Given that these people cannot even accurately guess
how long a steel barrel will last, what hope is there that their chosen
method for "final" disposal of the waste will work, or even be safe for
any reasonable time? Not that there is anything to worry about,
it is all perfectly safe and the experts get it wrong yet again - at
which point it won't be very nice. Still, everyone can make
mistakes. Sometimes, though, the consequences are more serious.
The Select committee reported:
- NDA has not systematically reviewed why major projects keep running into difficulties
- Despite some progress, expected cost overruns stand at nearly £1 billion
- BEIS still to make decision on future plutonium stockpile
The Nuclear
Decommissioning Authority (NDA) and Sellafield Limited have recently
met significant milestones with reducing risk at the high hazard
facilities at Sellafield, the NDA’s largest and most hazardous
site.
The NDA and Sellafield Limited have also made
progress with reducing delays and expected cost overruns with 14 major
projects at Sellafield, which have a combined lifetime cost estimate of
£6 billion.
While we recognise that there has been progress
since this Committee last reported, there is still a long way to go and
the NDA cannot afford to be complacent.
Most major projects at Sellafield are still
significantly delayed, with expected combined cost overruns of
£913 million. The NDA has not systematically reviewed why these
projects keep running into difficulties, or analysed properly the
constraints it says prevent them from making faster progress.
Until this work is completed, we remain sceptical about its long-term strategy to decommission Sellafield.
Also, despite this Committee’s recommendation
nearly five years ago, the Department for Business, Energy &
Industrial Strategy has still not decided what to do with the plutonium
stockpile currently stored at Sellafield.
Given the scale and unique challenges at Sellafield, the NDA must have a firm grip of the work that takes place on the site.
We saw that this was not the case with the
NDA’s recently failed contract to decommission its Magnox sites,
and we are no more convinced of its current ability to monitor and
challenge progress at Sellafield.
At the same time, the Department for Business,
Energy & Industrial Strategy must be more streamlined and effective
in its oversight of the NDA’s performance if it is to hold it
properly to account.
There was a comment from the Deputy Chair, Sir Geoffrey Clifton-Brown MP:
“This
report is critical of the Nuclear Decommissioning Authority’s
performance. The Government’s oversight of the NDA’s
performance could and should be much better, particularly on projects
at Sellafield that cost a considerable amount of public money.
This
report follows the Committee’s earlier report into the
NDA’s Magnox contract. The NDA failed in both the procurement and
management of this contract and cost the taxpayer £122 million.
In short, BEIS needs to seriously get a grip on its oversight of nuclear decommissioning in this country.”
Ref.: https://www.parliament.uk/business/committees/committees-a-z/commons-select/public-accounts-committee/news-parliament-2017/nuclear-decommissioning-authority-17-19/
How many more such reports can there be before the gravy train hits the
buffers? It is not too reassuring to be in receipt of documents
and a booklet telling local residents what to do in the event of an
incident at Sellafield. This material is circulated to everyone
within the immediate area of the plant and explains such things as
sirens sounding. Two miles from the plant it is rather unlikely
that any siren or other audible warning would be heard over the wind
and wave noises. So . . . tough.
14/8/18
'"Come into my parlour", said the spider to the fly . . .'
It is with some wry amusement that we observe that two of the world's
largest powers, Russia and China, are being accused of "ignoring the
niceties of convention and, on occasion, even the legalities of their
actions", yet the powers that be are still willing to do business with them.
Russia, supplies gas to a large number of EU countries:
Estonia,Finland, Latvia, Lithuania, and Slovakia are totally reliant on
Russian supplies, whilst Bulgaria (97%), Hungary (83%), Slovenia (72%)
are also under insurmountable obligations to Russia. Even
the likes of Greece (66%), the Czech Republic (63%), Austria (62%), and
Poland (57%) are highly dependent on Russian goodwill and thus
susceptible to Russian influence. Since their decision to
abandon nuclear power completely, Germany has been using
Russian-supplied gas for 46% of its needs, while Italy (34%), and
France (18%) would still struggle without Russia's gas.
In 2012 the European Commission opened formal proceedings to
investigate whether Gazprom is hindering competition in Central and
Eastern European gas markets, in breach of EU competition law. The
Commission is looking into Gazprom's use of ‘no resale’
clauses in supply contracts, alleged prevention of diversification of
gas supplies, and imposition of unfair pricing by linking oil and gas
prices in long-term contracts. To combat this, Russia responded by
issuing blocking legislation which introduced a rule prohibiting
Russian energy firms, including Gazprom, acceding to any foreign
measures or requests. The Russian government decides on
whether any company should comply with European rules or requests.
Ref.: Jones, Dave; Dufour, Manon; Gaventa, Jonathan (June 2015). https://www.e3g.org/docs/E3G_Trends_EU_Gas_Demand_June2015_Final_110615.pdf
It has been alleged to the EU commissioners that 'Gazprom manipulated,
blackmailed and threatened the Central European Member States in order
to maintain its monopoly of gas supplies. Unfair pricing, territorial
restrictions, making the gas supplies conditional upon granting control
of transmission infrastructure – these are just examples of the
grim picture reveales by the Commission in its Statement of Objections.'
The Nord Stream 2 project will render the extant Baltic pipeline
virtually obsolete in terms of European supplies. A major
worry should be that, once the Europeans are being supplied via the
Nord Stream 2 pipeline, the Russians can control more easily the amount
of gas supplied to the likes of Belarus and the Ukraine, making them
very vulnerable.
On 13/9/18, the American Energy Secretary is reported as having told
his Russian counterpart the Russian should stop using its resources for
"influence and disruption". Stating the obvious weakness of
having a single pipeline supplying energy to a huge part of Europe,
controlled by Russia, the Americans are threatening to impose yet more
sanctions on the Russians.
Ref.: https://www.bloomberg.com/news/articles/2018-09-13/u-s-warns-russia-it-may-sanction-new-gas-pipeline-to-germany
Currently engaged in military "manoeuvres" with
Russia, China is following a similar method of gaining control of other
countries' economics. The extent to which an ever-growing
number of countries are beholden to China for their development has
been noted in Australia and New Zealand in particular. In
the U.K. our politicians seem to be oblivious to any potential threat
and continue to welcome China's money and are willing to accept handing
control of the most important part of our infra-structure to
them. Just as Germany is under threat from its dependence
on Russian gas supplies, so the U.K. is vulnerable to control by
external countries of its electrical supplies. Although
ostensibly engaging in dialogues with leaders around the world, there
are those who believe that, far from broadening its views, the Chinese
government is intent on expanding its socialist status.
The methods used are very familiar to those who have
studied the methods of promoting the nuclear industry in the
U.K. The Head of the National Security College at the
Australian National University is reported to have said of China's
United Front Work Department, “It uses a tapestry of methods to
achieve its goals: political donations, control of Chinese language
media, mobilising community and student groups; and engaging in
coercive activities that involve CCP proxies and even consular
officials.”
A Chinese company, Landbridge, owns the lease on the
port of Darwin, a military base for U.S. marines! The deal,
in 2015, was hailed by politicians at the time as "a fantastic
outcome for taxpayers" (familiar?). However, there is
growing antagonism to the perceived Chinese interference in Australian
and New Zealand political and economic affairs.Development in China has
led to it becoming a major threat to western markets. As
with Russia, it was once trailing behind in developing such things as
electric cars and the so-called "intelligent machinery". By
copying - something the Chinese have always been acknowledged as being
masters at - successful models, they have now become a threat to the
originals.
Once seen as a major marketing opportunity, China
has changed the logic which stated that they needed outside help to
improve, so that now many countries are heavily reliant on China.
A report in Der Spiegel says that, "China is growing
stronger, America has become unreliable and Germany has to figure out
what its new rôle will look like". The report asks
what will happen when China begins exporting its own electric vehicles
or building its own high-tech machines, and points out that a
considerable stake in Daimler is under Chinese control. A
global leader in industrial robotics, KUKA, was taken over by the
Chinese company, Midea. Whilst they have not changed
anything much - the company headquarters remains the same, the number
of jobs has been preserved - there seems to be little appreciation that
the management now have access to all the company's industrial
secrets. Similarly with other specialist companies such as Krauss
Maffei (hi-tech injection moulding equipment) and Putzmeister (pumps
for a wide range of different materials, for example slurries, fly ash,
sewage, compost and water). These companies have branches,
and thus influence, in multiple countries. China,
obviously, now has access to all their research and development
plans. Strangely, many people only see the potential market
in China, rather than the detrimental aspects. Yet there is
an asymentrical balance in play, with the bias being in favour of
China.
America has accused the Chinese of unfair trade
practices and "massive theft of intellectual property". The
consequent threats loom large and will put EU countries in the middle,
which may well increase their dependence on Chinese
resources. Should the U.K. be inviting any foreign country
to handle control of their electrical supplies? What will
happen when the major companies around the globe are owned by China?
According Bloomberg (https://www.bloomberg.com/graphics/2018-china-business-in-europe/)
more than 670 China-related entities have invested in Europe over the
last ten years. At least a hundred of these were
state-backed and invested in almost £125 billion of transactions.
Has western Europe become a branch of China - helping them to become the global manufacturing super-power it has set out to be?
It may, then, be of little wonder that the likes of Électricité
de France
wish to build
new nuclear reactors as an alternative. Even better is that
gullible people in the U.K. will allow this. An international
grid could see the reactors situated remotely whilst the waste would
have to be treated and disposed of in the country of origin, not that
of the electricity consumer.
An amusing aside to the Hinkley debacle is the comment reported in the
press this week by France's Energy Minister, who seemingly has doubts
that the design will ever work. The Times report says
that "Électricité
de France needs to show that a new generation nuclear reactors work
well, which is not presently the case, new environment minister
François de Rugy said in remarks published on Monday". He went on to say that any decision on whether to build more plants
using the European pressurised reactor (EPR) design would be based on
economic factors. In the face of growing labour unrest, the
French government is expected to outline in late October a plan to cut
the share of nuclear energy in its electricity production by 25%.
Having the nuclear builder as a state asset, this may be
difficult to implement. Whether the proposed cut includes the
construction of new nuclear reactors is politically
sensitive for President Macron, who is already unpopular following his fights with the unions.
De Rugy reportedly told Le Monde newspaper in
an interview that 'his gut feeling was that nuclear power was not an
energy source for the future, but added that there should be no "war of
religions" on the issue'. Quite how that can be reconciled with
the continuing salesmanship abroad is difficult to imagine.
The Energy Minister continued, "The important thing is to know the
economic data for both nuclear and renewable energies." Yet the
construction of the first plant in France to use an EPWR reactor has
run billions of euros over budget and is years behind schedule.
Reports of quality failures in castings and weldings have been
circulating for many years. Strangely, none of these
difficulties will attend the Hinkley construction - allegedly.
Asked whether Électricité
de France should build another such plant after it completes
the station in Normandy, De Rugy said, "Électricité
de France should demonstrate that the
EPWR works, which is not the case yet. Nobody is able to
guarantee a date for its connection to the grid. It also needs to
demonstrate the Électricité
de France is competitive in terms of costs."
The previous environment minister, Nicolas Hulot, who was
widely viewed as an impediment to the nuclear industry's drive to
remain as France's main power supplier, resigned abruptly in August.
Blame the Investigator, not the Polluter
In an article in The Times, 14/9/18, a reporter notes that Dr. Chris
Busby, well known for his outspoken views, had been arrested.
Police searching his home complained of feeling unwell and it was noted
that in his laboratory were mysterious samples, including (apparently
written with shocked tones) mud samples from round Sellafield.
We've written to enquire whether the residents of Ravenglass and
Seascale will also be investigated for having Sellafield's radioactive
materials in their homes. We do not expect an answer. The BBC report states that Dr. Busby
was released with apparently no further action to be taken, although
Sky News suggests that he was released pending enquiries.
Amongst the indignant report was the observation that Dr. Busby had
appeared on RT (Russia Today), but, for all its faults, that channel
has not yet been proscribed by the powers-that-be, and it seems
unlikely to us that he would ever be invited to air his views on either
the BBC or Sky News.
NuGen Retreat
NuGen has announced it is to cut its workforce by around 60% due to
delays in the sale of the business. An employee consultation
process has been completed, and a "phased reduction" in the number of
employees will follow. The developer said: “This
consultation served to identify the posts that will be required to
finalise and complete a transaction for the sale of NuGen and as a
result, the team of over 100 will reduce to fewer than 40.”
A sale of the business to south Korean company, Kepco, stalled,
resulting in that company being stripped of its preferred bidder status
in last month after negotiations failed to reach a conclusion.
NuGen said, “For over a year, Toshiba has pursued a sale of NuGen
to Kepco. Due to the prolonged time it has taken to reach a
conclusion, NuGen has undertaken a review of its size and scale.”
Doubt was first cast on the project last year when Toshiba
posted an $8.4bn loss, largely due to a $6.3bn writedown of CB&I
Stone & Webster, which was owned by Toshiba’s US subsidiary
Westinghouse Electric. Westinghouse, was due to manufacture
the AP1000 reactor intended to be used at the Moorside plant, but
filed for bankruptcy in March, 2017. This prompted
Toshiba’s partner Engie to exit the scheme by triggering a
get-out clause in the contract, enabling it to sell its 40% stake to
Toshiba. After that it was a dismal task trying to sell the
concept to others.
The National Infrastructure Commission called on government to withhold
financial support for all but one of the planned new nuclear projects
until at least 2025.
Ref. https://www.constructionnews.co.uk/markets/sectors/nuclear/moorside-developer-nugen-halves-headcount/10035055.article
12/8/18
Up Up and Huawei
Around
ten years ago when our politicians were in thrall to RWE's executive,
were pointed out that it would be folly to become dependent on a
foreign power to provide electricity; at the same time we
suggested that merely using the hardware, firmware and software from
foreign users - whether in computers or, more seriously, in control
circuits - was putting the country at an unacceptable risk.
Over the years, and in every one of the responses we have made to the
various consultations, we have pointed out the vulnerability
potentially inherent even in such comparatively simple devices such as
routers and network cards. It seems that our forecasts were
correct:
Huawei is the world's biggest producer of telecoms equipment and is a
major supplier of broadband and mobile network gear in Britain.
The latest report was written by the Huawei Cyber Security Evaluation
Centre (HCSEC), which was set up in 2010 in response to concerns that
BT and others' use of the firm's equipment could pose a threat. It
reports to the National Cyber Security Centre which is part of GCHQ,
the Government's listening post.
In its latest report, the HCSEC's oversight board warned that
“identification of shortcomings in Huawei’s engineering
processes have exposed new risks in the UK telecommunication networks
and long-term challenges in mitigation and management”.
In America, where there have already been attacks on power distribution networks and nuclear power stations, FBI Director Wray said last Tuesday:
"We're deeply concerned
about the risks of allowing any company or entity that is beholden to
foreign governments that don't share our values to gain positions of
power inside our telecommunications networks that provides the capacity
to exert pressure or control over our telecommunications
infrastructure." He went on to say, "It provides the capacity to maliciously
modify or steal information, and it provides capacity to conduct
undetected espionage."
Source: https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/626110/20170413_HCSEC_Oversight_Board_Report_2017_-_FINAL.pdf
Because of the deep concerns regarding Huawei's products, the HCSEC
(Huawei cyber security evaluation centre) Oversight Board was set up to
assess security of the Chinese mobile phones made by the
company. The deputy chairperson is a senior executive from
Huawei.
Our government is seriously considering allowing China to build its own nuclear power stations, despite the obvious risks.
How many millions of other lines of code, on which the country (and, of
course, the nuclear industry,) relies have been assessed for latent
malware? We rest our case.
10/8/18
Losing One's Cool, or Wastwater Becomes Waste Water
One of the many deficits of nuclear power is that it needs lots of water to operate, and we are constantly told about the alleged role of CO2 in the global warming scenario. According to supporters of the theory we are already beyond redemption.
What then is the future for nuclear power stations
that need constant supplies of cold water to cool them
down? There have been droughts in Greece and Sweden, and in
central and northern parts of Europe, whilst the normally-green UK looks brown.
The heatwave and the consequent drought is forcing nuclear plants either to shut down or curtail the amount of power they produce. French utility Électricité de Franc
was obliged to shut four reactors at three power plants on
Saturday; Earlier in the week Swedish utility Vattenfall shut one
of two reactors at a power plant, and nuclear plants in Finland, Germany, and Switzerland have been obliged to cut back the amount of power they produce.
Yet this particular problem is not mentioned,
although we are often told that the wind won't blow, causing problems
for wind-farms, and the sun doesn't always shine, causing problems for
solar generation. Hence we need the good old nuclear power to see us through. Yes, well . . .
One of Private Eye's "Number Crunching" panels a
couple of weeks back seemed to have missed a few of United Utilities
problems. Basically about the lack of water, it failed to
give a complete picture. Ever helpful, we
wrote pointing out the ommissions. The current edition
includes most of our information, under the title of Mussel
Strain. It tells of the scarcity of water
for West Cumbrians, despite them living in an area of very high
rainfall, and sounds a bit cynical that Sellafield's needs come first
over the needs of the 67,000 people affected by the new
supplies being provided to replace the Ennerdale water that has been
the staple for 150 years. The supply is now comprised of
20% borehole water and 80% Ennerdale water.
People have complained in the local press about the
alleged effects of the change, suggesting that they are suffering from
rashes and upset stomachs as a result.
Sellafield is licensed to draw over 24½
billion litres of water a year from the area's resources:
6½ billion litres from the River Ehen, the rest from the River
Calder and Wastwater. They pay nothing for the water in the
way that normal customers do, but they do pay for the extraction
licences. We don't know who mon itors that the extraction
quantities are comensurate with the terms of their licence..
One of the tenets of the base load model is that nuclear can
fulfill any short-fall virtually instantaneously. Although this model
is now old hat, the industry has done a good job of keeping it alive,
promoting the disadvantages of windfarms (the wind doesn't always blow)
and solar (the sun doesn't always shine) whilst failing to note
detrimental conditions that would cause a nuclear reactor to go off
line. However, during the most recent heat wave four French reactors
had to go off line to avoid overheating their cooling sources - which
would have killed native wildlife in the respective sources. A while
back, we noted several incidences of reactors having to be shut down
due to the jellyfish, appreciating the nuclear industry's contribution
to global warming, congregating in huge swarms, thus blocking the water
intake for the cooling systems. Why doesn't anyone remind the
decision-makers of these flaws?
10/8/18
The Nuclear Industry Improve Whitehaven
The
peculiar relationship between Sellafield and west Cumbria has escalated
with the announcement by ex-M.P. Jamie Reed, now head of corporate
affairs at the Sellafield site, that £2.6 million to convert the old
bus station in Whitehaven to a “hub for start-up businesses”. It will
be called, somewhat unimaginatively, The Buzz Station. The building
is currently a Witherspoons.
Sellafield has a long history of
what some see as undue interference in the local community, following
on from the decision to 'capture the minds, if not the hearts of the
young children', as mentioned in the book “Inside Sellafield”, by
(ex-Sellafield PR manager) Harold Bolter. The plan has seen the
company infiltrating virtually every aspect of community life in the
area, especially those which will influence young minds.
The
problem for some is that the majority of the donations and initiatives
emanating from Sellafield, are those which should be coming directly
from the government – local and national. Instead, pitiful amounts
are fed into those areas which will most benefit the nuclear industry
image, having been filtered through Sellafield’s £2 billion (and
rising) annual budget.
Another beneficiary of this type of
largesse is the “Whitehaven Campus”; a £30 million investment for which
comes from partners including the Nuclear Decommissioning Authority
(£14.5 million), Sellafield Ltd. (£10.6 million), and the county
council. Copeland Community Fund is investing money for the provision
of new, accessible, community sports facilities.
Small surprise
then that most young people, who have been subjected to this kind of
education see little harm in Sellafield’s other, less savoury
activities. One does wonder, though, why the NDA and Sellafield are
permitted to distribute taxpayer’s money in this manner. Surely the
NDA and Sellafield are both funded to deal with cleaning up the
Sellafield site, not to perpetuate the nuclear industry in this manner,
by brainwashing youngsters?
With the industry in decline, there
is a need for future industry in the area and it looks like the
“Moorside” development of 500 acres of farmland is faltering and may
not go ahead. The emphasis seems now to have changed from new nuclear
to the underground nuclear dump, following the announcement that even
National Parks will not be immune from hosting them or having them
imposed by the National Infrastructure . No prizes for guessing which
National Park is the most susceptible.
10/8/18
A Game of Bluff - or is Moorside Really Doomed?
NuGen seem to be
taking their bat and ball home, having announced that if funding and
better terms are forthcoming within a few months, they will have to end
the Moorside project and sack all their staff, who seem mainly to be
office-based nearly 100 miles away, in Manchester. No doubt
those staff would have moved to Cumbria in due course, continuing the
illusion that NuGen have provided local jobs.
Or was it all just a ruse to enable more boreholes to be drilled with a
view to imposing the underground dump on Cumbria, burying the stuff
under the lakes and mountains of the National Park. Sellafield
representatives have certainly been inserted into the relevant
committees and financial assistance suitably benfitted the amenable.
20/7/18
The Power Behind the Power
Throughout
our meanderings we have often (too often for comfort?) drawn attention
to the coming of age of the plans laid down decades ago by the managers
and, especially, the PR men from Sellafield in respect of damage
limitation and insertion of nuclear industry personnel into government
- whether as "special advisors", or, indeed, MPs. The current
crop of promoters, ably assisted in Cumbria by local press, is no
exception. We will draw again from that august journal, Private
Eye. In an article headed "Nuclear Families", (Issue 1474,) it
says:
Business
secretary Greg Clark's department has all but dropped any pretence that
UK nuclear policy is determined objectively and more or less handed the
task to industry itself.
Among
measures announced last week in what it calls a special "nuclear sector
deal" were £200m of taxpayer cash for research and technology
facilities, plus commitments to the latest forms of nuclear build such
as approving smaller "modular" reactors now in vogue in the business.
Industry, meanwhile, merely agreed to some vague targets to
reduce building and decommissioning costs.
The
small print of the plan reveals that the deal "has been developed by
the Nuclear Industry Council . . . in partnership with the government."
But who exactly is the Nuclear Industry Council? It is
chaired by former New Labour minister John Hutton, who kicked off the
nuclear renaissance as business secretary in 2008 (declaring falsely
that "there will be no public subsidies) before heading into the
industry himself. Members include EdF (behind the £20
billion Hinley Point C power station), Horizon (owned by Hitachi and
pencilled in for a new plant on Anglesey), as well as builders like
Laing O'Rourke, Babcock's Cavendish nuclear group and the consultancy
Arup. Hutton himself is well placed to boost the nuclear
companies' prospects. He also chairs Energy UK, which brings
together energy producers and the suppliers that have to decide where
to buy their power.
When
it comes to cleaning up the nuclear mess, the sector deal sets out what
it calls "a long-term vision of innovation-led growth that delivers
successively lower generation costs and a 20 percent reduction in
decommissioning costs to the taxpayer".
Just a
couple of days earlier, the government's Nuclear Decommissioning
Authority (NDA) said it was taking back in-house the job of cleaning up
12 Magnox sites from a consortium of Babcock and Fluor, after the NDA
botched the contract. The price had risen from £3.8
billion to £6 billion over the two-year procurement. As
ever, condessions, subsidies, bail-outs and unmeetable promises keep
the nuclear family together.'
Not sure whether the author has been reading our
web-site, but most of that has already been said here. How long will
it be before the industry convinces those at Westminster that it should
be allowed to fulfill the forecast by Mike Weightman, former CEO of the
Office for Nuclear Regulation, back in 2009, when he suggested that
ultimately the industry would ba allowed to regulate itself. We all
know how well that system works. Still,
observing the changes occuring around the Whitehaven and Egremont
areas, especially with interference in educational fields, along with
the constant barrage of pro-nuclear propaganda published by the local
press, it seems the industry is well on its way to achieving the
objectives set out in Harold Bolter's book, "Inside Sellafield".
One has to wonder what kind of conscience these people have.
28/6/18
How Close is Permissible?
Chester University has
been ordered to dismantle its £120 million cutting-edge science
and engineering park after the local authority said that the site was
too hazardous for students.
Thornton Science Park, a
66-acre site, has been home to Chester’s engineering and science
faculty since 2014 and incorporates a range of state-of-the-art
laboratories, workshops and lecture theatres for 700 students.
The computer facilities
are among the best in the country and the site is also home to a
three-floor centre to create and test new forms of energy. George
Osborne opened Thornton when he was chancellor of the exchequer and it
has hosted a stream of ministers who have hailed it as a cornerstone of
the northern powerhouse project.
Last week, however,
Cheshire West and Chester council rejected a retrospective planning
application by seven votes to four after the Health and Safety
Executive (HSE) condemned Thornton as not fit for purpose.
The site is too close to
Stanlow Oil Refinery, classified as a “hazardous
institution”, and is therefore covered by the stringent control
of major accident hazards regulations, the HSE said. It can be used as
a site for industry and employment but it cannot be used for education.
The university has denied that it was guilty of a serious oversight in
constructing the centre without first seeking planning permission. It
said that senior council planning officials had assured the university
that it did not need to submit a “change of use”
application when it acquired the site as a gift from the oil giant
Shell.
This was because under
Shell’s ownership the site had unusual sui generis status, which
meant that it was not in any particular category for planning purposes
and could be used for anything.
The problem came to light
only last year when the university applied for planning permission for
a number of new smaller developments at Thornton. Chester decided to
apply to change the status of the site from sui generis to category D1,
“a non-residential institution” and the category usually
used for educational buildings. At that point the council was required
to consult the HSE. Senior university figures were horrified when they
were then told by the HSE that it was too dangerous for students.
Professor Tim Wheeler,
the Chester vice-chancellor, said that it was too important to the
country and the region to close. “The university is surprised and
disappointed that the planning committee has endorsed the
officer’s recommendation to refuse planning permission for change
of use of six buildings at Thornton Science Park,” he said.
“Thornton Science Park is a unique site, bringing an additional
£60 million into Cheshire West and Chester each year in
employment and educational and economic benefits. It is too important
for the university, the wider region and national commercial interests
to accept this decision without challenging it.”
He said that he believed
there were compelling grounds for an appeal and the facility would
remain open while the appeal was heard. It is thought that the
university will argue that as all the students are aged over 18 and are
trained in health and safety procedures before entering the site they
are more like employees than school children.
If the appeal is dismissed the university said it will relocate the science park to one of its other campuses.
This would be a huge
embarrassment, however, for the university, which has received funding
from sources including the Higher Education Funding Council for
England, regional development boards and a host of industrial sources.
Ref. The Times, Tuesday, June 12th, 2018. "Chester told to demolish £120 million science park"
Which begs the question of how close any development could be to
Sellafiield. Especially a development involving three nuclear
reactors literally just across the road from the site described
as the most dangerous chemical factory in Europe. Sadly, despite
making this very point (albeit without any knowledge of the relevant
legislation) in every response to each of the many many consultation
processes, it appears that there are none so deaf as those who don't
want to hear.
28/6/18
Qualified Success
Can it be that there
are dubious practises at Sellafield? Surely not! Yet Old
Sparky tells us (Private Eye, 1472) that the strictly regulated
environment at Sellafield proved no barrier to Costain. The
article tells that when Costains needed to justify engaging another
person on site, they made a case for Sellafield that the job needed to
be done by an engineer. Once on site, however, these employees
could be used for any purpose the management dictated. The
article continues, "The people were only called engineers to justify
the rate charged to Sellafield." Costain's claim that quality is
paramount seems a little ambitious in the light of this.
Whilst on the subject of personnel employed at Sellafield, it might be
interesting to query whether employees are regularly tested for drug-
taking, which seems to be particularly prevalent in the area.
Leastways according to the local headlines:
Drugs leave 12 dead since December in a Cumbrian town
Ref.: https://www.bbc.co.uk/news/uk-43816717
Police chief: Big city drug gangs are carrying out turf wars in Cumbria
Ref.: http://www.newsandstar.co.uk/news/Police-chief-Big-city-drug-gangs-are-carrying-out-turf-wars-in-Cumbria-e2516577-ff7d-44fb-a934-e259a820524d-ds
Gangs in Cumbria running drug deliveries like a takeaway service
Ref.: http://www.timesandstar.co.uk/news/Gangs-in-Cumbria-running-drug-deliveries-like-a-takeaway-service-a8568225-9bbe-48b8-b87a-5bc3f92da134-ds
Still, fortunately, the nuclear industry has high standards.
28/6/18
Under The Stone
As
an interesting follow-up to the article below, Private Eye, 1472,
contains explanatory notes. The decision seems to have been
taken to commit £12 billion of public money to the Wylfa project
which is a considerable fillip to Hitachi, one of whose directors is
named as Tim Stone. Working for the government, Stone was
chair of the Office for Nuclear Development. According to
the report in the Eye, Stone was simultaneously running KPMG's global
infrastructure group.
KPMG subsequently gained contracts worth millions of pounds advising on
financial aspects of the Hinkley project. Despite the
involvement of these supposed experts, the National Audit Office has
heavily criticised the decision to press ahead with Hinkley, saying the
government had not sufficiently considered the costs and risks of its
deal for consumers. According to the NAO, the only reason the
figures added up the way they did was because they had been presented
in the most favourable way. It is tempting to think that this is
the way the nuclear industry has been allowed to develop for decades.
Either plant supporters or "encourage" belief in the science and
provide expert advice to the decision-makers as independent assessments.
The Business Secretary at the time was John Hutton (Baron Hutton of
Barrow-in-Furness). In June 2010, it was announced that Hutton
had joined the board of US nuclear power company Hyperion Power
Generation. Hutton became Chairman of the Nuclear Industry
Association in June 2011.
10/5/18
Having Cake and Eating It
We received an
e-mail last week inviting us to write to the Prime Minister to object
to government funding being provided for the Horizon project at Wylfa,
Anglesey. A meeting between the Prime MInister and
representatives of the Japanese company, Hitachi, was held on 3/5/18 to
discuss an interesting new tack as the consortium struggle to obtain
funding for an unviable and expesive proposal. Horizon are
reported to have asked for direct funding and loan guarantees, on top
of the current commercially unavailable insurance provided by
taxpayers. (Fukushima updates to the total cost now suggest
clean-up costs of £138 billion - a similar event here would cost
at least as much and much of that would be the responsiblility of the
U.K. taxpayer.) The Wylfa site
is now expected to cost more than £20 billion, making it even
more than the current estimate for Hinkley's white elephant - which has
already gone up in mind-boggling leaps from the original £3
billion. Needless to say, Horizon continue to imply that the
cost will be below that estimate.
There appears to be some confusion as to what the
outcome of the meeting with the Prime Minister was. Japanese
press reports suggest that the Prime Minister told the consortium to go
ahead, whilst the government spokesperson declared that, "We don't
recognise these reports."
Perhaps an attempt to force the
situation? After all, if they were in any way doubtful about the
project going ahead, wouldn't the politicians have put a stop to it now
- it was a good opportunity to do so, surely? Perhaps that
omission signalled something different to the Horizon people to the
effect that was intended? That Horizon is struggling to obtain
financing is
apparent from the statement last year by its chief executive, Duncan
Hawthorne, that loan guarantees alone would not make the plant viable
and the company had been seeking direct government investment as well
as a subsidy contract.
Quite how much money is available for investment is debatable.
The current estimate for Hinkley puts it around £17 billion.
Horizon and "Moorside" are both likely to require at least the
same level of investment and on the same terms, with the cost of
electricity produced being guaranteed for the duration of the
agreement, which will probably be at least thirty years. Index
linked, naturally. The basic concept seems to be that the U.K.
taxpayer provides the money and opportunity, the foreign company takes
no risk, provides scant investment, yet all the profit goes abroad.
To normal people this may seem like a poor investment of
£60 billion, especially when the clean-up costs are taken into
consideration. One of our perpetual (but unanswered) questions
has always been, "What will be left for locals when production comes to
an end?" If the newish chief executive of the NDA has his way,
it won't be land restored to its original state, but a collection of
derelict buildings and other industrial works and equipment. Actually, the unstated
response should be huge bills and untreatable waste together with a
collection of decaying ramshackle industrial complexes in place of the
beautiful wild countryside that we were bequeathed by our forebears.
Despite the rush to get going before any further adverse
criticism can be levied, a decision is not expected to be made before
next year. Even that seems to be disputed, as Hitachi have said
that they will pull out altogether by the middle of this year should
they not get their way. Or did the Prime Minister offer support
but is too embarassed to tell the world? Should anything go awry
at this stage Hitachi could end up £2 billion out of pocket, that
being the amount they have already spent.
Politicians in Wales have a bit of a problem, having promoted their
green agenda - which, of course, precludes nuclear development - they
have to balance that stance against the number of jobs promised by
Wylfa. However, it does seem unlikely that any great number of
nuclear or other necessary specialist engineeers are currently
unemployed and living on Anglesey. How many can there be in
Wales? Especially when the potential number of vacancies should
all the proposed developments take place. Perhaps there is a
case for motorway connections between "Moorside", Wylfa, Hinkley,
Dungeness, and
Source: https://www3.nhk.or.jp/nhkworld/en/news/20180504_07/ and
https://www.thetimes.co.uk/article/confusion-over-financial-backing-for-nuclear-project-xqjltp0h3
8/5/18
What Do They Know?
(As opposed to what they think they know)
Once again, computer modelling, that nefarious
get-out trick that predicts how things might work - provided that the
software developer covers every base, which is, of course, impossible -
has been show to be over-optimistic.
The predicted rate of cracking in a key part of the reactor Hunterston
reactor number 3 is being exceeded, resulting in a prolonged shut-down
by Électricité de France.
It is difficult to imagine that any repair can be made to the vital
temperature-controlling mechanism, as the graphite blocks are
inaccessible. Some experts are suggesting that other
reactors on the site will be suffering from similar problems and that
it is unlikely that they will reach their planned-for life.
Unexpectedly high rates of cracking in vital parts seem to be par for
the course, as reactors at both Heysham and Hartlepool were taken
off-line following discovery of cracks in the boiler spine, and two
reactors in Belgium also suffered cracking in core tanks.
Ever on the edge, an Irish MLA has said that Kilroot power station in
Antrim - due to close in 2024 for environmental reasons (it is a coal
burner) - should be kept open for longer to compensate for the
reduction in electricity from Hunterston.
Source: http://www.no2nuclearpower.org.uk/news/hunterston-8-5-18/ and
https://www.newsletter.co.uk/news/environment/power-supply-fears-prompt-call-to-keep-kilroot-open-1-8489681
8/5/18
The Propaganda Machine Rolls On
As noted in the
comment "The Experts Must Try Harder", below, The Times really does
seem to be losing its grasp. Today's article by an Energy
Editor, Sellafield, perpetuates the illusion that you can vacuum up
radioactive material and just dispose of it, without consequence.
Almost touchingly gullible, the writer expounds the PR tale that
the B30 building is being cleaned up and that the "Good Guys" have it
all in hand. Provided the concrete walls of the ponds holds up a
bit longer all will be well.
We wrote to the Editor to put our
view, but it is very difficult to get anything mildly critical
published, so we paste it below:
Sir,
It is sad to see that those in charge of Sellafield continue the PR
campaign so long associated with the nuclear industry. In
the article "Nuclear waste dustbin is cleaning up its act", your energy
editor seems to imply that vacuuming up radioactive waste means that it
is thus rendered safe and can ultimately be disposed of.
This is to ignore
the true situation: the radioactive material, together with the
seagulls noticed floating on the ponds, the disposed of fuel rods, et
al, retain their radioactivity until the natural processes of decay
have been accomplished. Even the equipment in use to
"vacuum" the pond will have to be disposed of, together with the
mentioned corroded crane, as high level waste. The seagulls
that die as a result of floating on the pond become radioactive,
meaning that any seagull found dead on the shoreline should be treated
as radioactive waste. It is not the simple process implied
to retrieve the radioactive material and dispose of it.
That is why the pile of waste is building up at Sellafield.
Their "reprocessing" merely concentrates the waste, ultimately
producing, I understand, around seven times as much radioactive
material as that brought in to be reprocessed.
The loss of
coolant water from the pond means rather more than just the pollution
ensuing from that radioactive water. If/when that happens
there will be much more serious complications from the overheating
deposits. An escape of this material would potentially
affect a great deal of western Europe and - depending on the wind
direction - the cities of Carlisle and Newcastle-upon-Tyne.
In the event of such an incident during an easterly wind-flow, there
would be disastrous effects on the Isle of Man and Ireland, hence their
long-standing objections to further operations at Sellafield and the
proposed adjacent site nominated for NuGen's "Moorside"
fiasco. (If they can find anyone gullible enough to
shoulder the risk and provide the finance.)
There is no
ultimate safe solution for the disposal of radioactive waste and it is
surely unwise to proliferate the production thereof. New
waste from the likes of Hinkley will be even more concentrated, be more
difficult to handle, and will require even longer periods for decay.
Given the costs
involved in the decommissioning processes for nuclear plants, surely it
is readily apparent that electricity generated this way is far too
expensive to ever be viable?
PR information can
be very misleading, often deliberately so. We would have
hoped that The Times would have recognised that.
This article coincides with a proposal by the
chief
executive of the NDA that the £90 billion (at today's reckoning,
but elsewhere put at £162 billion over 100 years) cost of
decommissioning Sellafield and other nuclear installations could be
reduced slightly if they didn't have to do the whole job, but were
allowed to leave some parts (very safe - naturally! Nobody needs
to be alarmed. No animals will be harmed, etc.) for someone else
to deal with, perhaps. The thin end of a very big wedge.
Who will determine what parts of a site can be left intact?
Guess which "experts" will be called on to opine about safety of such
residue. There are over 1,000 diffferent nuclear facilities on
its 1500 acre site. Next door, a further 500 acres is to be
obliterated by the proposed NuGen "Moorside" site. 2,000 acres
of once green moorland buried under toxic materials and buildings.
A more representative view of the situation at Sellafield can be found at:
8/5/18
Électricité
de France Security
It would be funny if it were not so serious. In a variation of
the "no animals were harmed and there was never any risk" mantra,
our old friends at
Électricité
de France have now reassure us that "No padlocks were missing from the
cabinets housing the computer equipment for the reactor protection I
& C system". This follows the discovery that 150 padlocks
were missing, presumed stolen. There is no mention as to how
long the padlocks might have been missing, or who might have gained
access as a result. Still, an
Électricité
de France statement tells us that "This event did not have any impact
on site safety." Now, where have we heard that one before?
How do they know the impact as yet? If they can't even
see that padlocks have gone missing and, as yet, don't know the motives
of the culprits, how can they know whether anything else was done which
might affect safety?
Source: https://www.reuters.com/article/us-edf-flamanville/padlocks-stolen-from-edfs-flamanville-nuclear-site-edf-says-no-impact-on-safety-idUSKBN1I80HK
30/4/18
The "Experts" Must Try Harder
That
paragon of impartial journalism, The Times, seems to be losing its
grip. Over the last few weeks we have had occasion to draw their
attention to incorrect assertions that Hinkley is to produce 7% of the
U.K.'s energy requirements and to criticise their use of stock
photographs to depict, for example, Sellafield. In the latter
case, the energy editor must have been panicking a bit to use one
depicting the Sellafield site complete with the cooling towers that
were demolished in 2007. Hardly relevant to today's site, which
has sprouted many new buildings and very tall chimneys. Despite
our attempts to draw attention to the need to use contemporary
photographs, another article, entitled "Alarm rings over rising nuclear
bills" on Sunday, 29/4/18, uses three cooling towers to illustrate "the
nuclear option". Amusingly, the Alamy stock photograph used is labelled: "White smoke coming from the cooling towers of the nuclear power plant in Temelin, Czech Republic, Europe."
How very strange! How very irrelevant and inaccurate.
Quite why anyone would choose to use a Czechoslovakian site to
illustrate problems in the U.K. is not the only problem. The
discharge visible against the Czechoslovakian skyline is not smoke -
leastways unless something has gone very wrong. If our
assumptions are correct, then it will be steam vapour and will be laced
with the likes of tritium. (You may recall that Sellafield were
warned about the potential for the spread of legionnaires disease from
one of its cooling towers back in 2016 1.)
That
the story is newsworthy is also a bit of a mystery; as well as
the out-of-date and irrelevant photographs, nothing new is
contained in the text either. Leastways, nothing that should
merit so much space. It boils down to the difficulties being
experienced by Électricité
de France, Hitachi, et al, in raising money for their unsustainable
schemes. Potential backers for new nuclear are patently in short
supply, presumably they have seen the arguments and accepted that these
new builds are pie-in-the-sky projects which are now out-moded.
The Times article, by John Collingridge (presumably an alias of Private
Eye's Phil Space), attempts to engender some interest by saying that, "Experts are warning that new nuclear power plants are likely to blow their budgets and arrive late [i.e. follow the norm] unless their designs are completed before construction starts." Anyone who doesn't already know that is hardly likely to be a Times reader or have any interest in nuclear new build!
After
noting that Hitachi are trying to persuade politicians to waste (sorry,
inject) money by the public funding of their Wylfa project - thus
putting the entire onus on the U.K. taxpayer to enable the company to
make huge profits to take back to Japan - we are advised of a report by
the researchers (predictable) at the Energy Technologies Institute.
Being astute experts, these people have noted that projects
started before the final designs have been completed tend to exceed
their budgets and take longer to complete. One can see why they
have been accorded their status. The solution to this problem
is, amazingly, not to start building until they actually know what it
is they are supposed to be building.
Other
suggestions are that multiple reactors are built on each site.
Neat. Once the local residents have been ignored and their
amenity destroyed we can expect huge industrial sites to appear where
there was once green-field land. Er, just like NuGen's plans for
"Moorside" then, with their three-reactor designs and suggestions for
turning the natural environment into an industrial theme park.
We are reminded of our complaint to the erstwhile M.P. for Copeland, J.
Reed, about plans for development along the Cumbrian coast from the
planned RWE site at Braystones, on to the "Moorside" site adjacent to
Sellafield, Sellafield itself and, passing the already-despoiled land
that is the nuclear waste tip at Drigg, down to Kirksanton, jumping the
contaminated estuary at Ravenglass in the process. As well as
the surface development, there is a proposed coalmine
at St. Bees, and the hope that eventually Copeland residents will be
defeated and the underground waste dump will be built.
In all, over 28 miles of beautiful coastline to be destroyed.
Then of course, there is the seascape which will be destroyed by
the ever-increasing number of huge wind turbines that litter the area
off Walney Island. How long before they meet up with those at
Robin Rigg wind farm in the Solway, off the Scottish coast
some sixty miles away, we asked. The idea was dismissed,
naturally. The flaw in the argument may just be that those
involved in the construction a) don't know what design they are aiming
for, and b) why do the public have to fund private companies without
getting a share in any eventual profits? Nevertheless, a
spokesperson for DECC is reported as saying that, "This independent report is helpful in looking at cost reduction in the nuclear section" .
Oh, by the way, the grand-sounding institute of Energy Technologies is not an independent body of real experts, but "a collaboration between the government and industrial giants such as BP, Électricité
de France, and Rolls Royce".
Good to see that the industry can still directly access "the
government" (surely not those with financial interests in nuclear
development). The document is, therefore, in no sense independent. Basically, then a propaganda exercise.
If only more impartial, less introspective views could be listened to
so assiduously. Or at least some sort of acknowledgement be made
that the public are being seriously misled by the nuclear industry and
its supporters in government.
1 A nuclear watchdog has slapped an
'improvement notice' on Sellafield Ltd over the condition of a cooling
tower on site. The Office for Nuclear Regulation says that
improvements must be made in the management and control of the
legionella bacteria in the tower at its Highly Active Liquid Effluent
and Storage facility.
No mention of the tritium and other daily discharges, however.
Source: http://www.newsandstar.co.uk/news/Sellafield-rapped-for-legionella-control-ea6269e3-cbcf-4311-85b6-fe1e0a73c356-ds
26/4/18
Are We Nearly There Yet?
SSE's
profit margin rises by 3%, producing profits up by 2.1% to
£1,545.9m. The group is to merge with Npower over the next
18 months or so. Despite forecasting lower than expected
profits as recently as last November, the increase in consumption due
to the recent cold spell has nonetheless resulted in record profits for
the company.
SSE
is owned by Iberdrola, a Spanish company. Old friends Électricité
de France
managed to produce a small loss. One might wonder, is this
solely to do with financial advantages?
The
gross profit margin on electric and gas power is around 20.7% to 22.6%
which is considerable when dealing with semi-monopolies with
overwhelming control over the nation's supply.
The
usual justification has been put forward for the most recent price
rises: cost of wholesale supplies. Sounds plausible
on the surface, until you consider who controls the wholesale
prices. When an internal market is setting prices the
justification struggles. Gas supplier British Gas is
obliged to put up prices because their supplier, a British Gas company,
has increased their charges. Justifiable? Or just a
con-trick? We stand by our earlier suggestion that only by
increasing the cost of energy produced by non-nuclear sources to levels
nearer to those agreed with Électricité
de France for the Hinkley site can nuclear energy
become anything like justifiable. Alternatively, if Électricité
de France can
screw the U.K. for sky-high prices, then why can't everyone
else? Either way it is the consumer who pays and the chief
executives get multi-million pound pay and bonus deals and profits go abroad.
What's not to like?
Source: http://sse.com/newsandviews/allarticles/2017/05/preliminary-results-for-the-year-to-31-march-2017/, and
https://www.telegraph.co.uk/business/2017/08/31/sse-revealed-profit-hungry-big-six-margins-climb-third-year/,
and
https://www.constructionproducts.org.uk/news-media-events/blog/2017/june/a-comparison-of-electricity-prices-between-the-uk-and-eu/,
and
https://www.theguardian.com/money/2017/aug/31/profit-margins-at-big-six-energy-firms-hit-highest-level-on-record, and
The International Energy Agency
27/4/18
The Heads of FBI, CIA, and NSA Advise Against Using Huawei Phones
Further to our items on the lack of computer security and vulnerability
to external interference, we note that the second biggest mobile phone
manufacturer, Huawei, are unofficially banned in the U.S.A. because of
security concerns. A report from NBC, says:
FBI
Director Chris Wray said the government was “deeply concerned
about the risks of allowing any company or entity that is beholden to
foreign governments that don’t share our values to gain positions
of power inside our telecommunications networks.” He added
that this would provide “the capacity to maliciously modify or
steal information. And it provides the capacity to conduct undetected
espionage.”
Source: https://www.cnbc.com/2018/02/13/chinas-hauwei-top-us-intelligence-chiefs-caution-americans-away.html
https://www.theverge.com/2018/2/14/17011246/huawei-phones-safe-us-intelligence-chief-fears
Er, do they not know who manuactures their computer communications PCBs? Used in modems, network controllers, routers,and data
centres, with general unchecked acceptance of their integrity, these
cards are used in a wide variety of sensitive settings on trust.
Still, the love-in with China continues, despite the evidence.
They are, after all, spending lots of money world-wide. It is
not just David Cameron dipping his noodles in the sweet and sour sauce, of course, although it seems that his
referral to the Advisory Committee on Business Appointments is unlikely
to prevent him achieving a high (and lucrative) position in the $96 billion plans for
Chinese expansion. Whether the best interests of the U.K. are
being served in this type of scheme is debatable.
One Harvard professor has already suggested that the Chinese economic
situation is unsustainable and the country poses one of the biggest
risks to the economy over the next five years. The borrowing ($7
trillion) has now reached 237% of China's GDP. If the
politicians' plans for Chinese involvement in nuclear development
continue, then it may not only be the Chinese economy that faces
problems. When facing financial difficulties, it is often the
case that corners are cut to save a few bob. Would that really
be a good thing for new nuclear development? Who in the U.K.
will be left to clean up after any collapse? When the Wall
Street Journal carries articles like, "‘China’s Great Wall of Debt’ Review. The Chinese Growth Charade -
Ghost
cities, shadow banks, white-elephant state projects: The
country’s pursuit of growth at all costs may come at a high price",
surely there should be a pause for serious contemplation of whether
this is a nation to whom we should offer control of nuclear power
plants?
27/4/18
BBC Countryfile Does the Cumbria Coastal Way - Sort of
On
Sunday, 15th April, 2018, the long-awaited Countryfile visit to the
west Cumbrian coast was screeened by the BBC. With keen
anticipaction we tuned in to watch, fully expecting at least some
mention of the proposed "Moorside" development and its impact on the
amenity of this beautiful area. Nope.
Of
the 182 mile path from Silverdale to Carlisle via Grange, Barrow,
Ravenglass, Sellafield (strangely missing from the list of
way-stations) St. Bees, Whitehaven, Silloth and round to Carlisle, the
programme managed to complete just a couple of miles, out to Peel
Island to look at seals and short sections from Whitehaven and St. Bees
Head.
There
was just a passing mention of "industrial legacy" as the panoramic view
from St. Bees to the south couldn't avoid the huge Sellafield
complex. In every other sequence the camera was angled away
from the eyesore.
Despite
having shown the sites of now-defunct coal mines around Whitehaven,
whilst standing on the top of St. Bees Head, there was no mention of
the proposed sub-marine coalmine proposed, together with ancillary
development.
Were
we wrong to expect at least some comment on the proposed development of
over 500 acres of green land? What is the rôle of the
BBC - is it just to present the easy non-contentious itemns or should
it look at the bigger picture? They had time for an interesting
article on how one artisan used seaweed to develop camera film, which,
despite its novelty was not particularly relevant to the unique bit of
English coastline, but not for huge industrial complexes and their
impact on the environment and amenity.
12/4/18
Moving With The Times - or, We Told You So (Many Years Ago)
A
recent communication from the Stop Hinkley group pointed to the
excellent work they are doing. One of the most notable being the
discovery of a report by the regulators criticising the safety systems
in place with Électricité
de France's development at Hinkley Point. Subsequently there has
been a number of instances of it being picked up by the national press.
The most enlightened being the business commentary by Alistair
Osborne in The Times, 11/4/18. This illustrates the hype that
passes for fact by the company. We all knew about the 1,650 MW
Flamanvillle being three times over budget and six years late, but it
is tempting to extrapolate those facts and suggest that Hinkley, being
twice the size, will be six times over budget and 12 years late.
In the interim, Électricité
de France's can spend the time sorting out the "significant event relating to the detection of
deviations in the performance checks" of the welded joints. The
regulators also require further improvements to its manufacturing and
supply chain. These requirements for improvement are
likely, despite what the senior Électricité
de France managers try to tell us,
to further delay the completion date. Not that this should
bother us, as we are not scheduled to start paying through the nose for
the project until the costs plus substantial recompense can be added to
our bills. Until the plant starts generating the onus is on the
French, with certain exceptions, of course. This has started the
suggestion that there may be a need for us to start paying, perhaps in
stages, so that the company doesn't run out of funds, as predicted by
the last Chief Financial Officer as he resigned.
Source: Re. Stop Hinkley, http://stophinkley.org/StopPress.htm
Re. Osborne's article, https://www.thetimes.co.uk/past-six-days/2018-04-11/business/one-flamanville-is-quite-enough-d0xbq5l9d
Additionally, of course, there is the potential that
the untried plant may never work, which, without a U.K. contribution
would leave the French with a huge amount of debt and us with a huge
industrial complex with no future and no way of putting the land back
to its original state.
Osborne concludes, "As the latest farrago highlights, one mega
Flamanville for Britain is already quite enough. Overpriced
nukes can't be the way of the weld". Yet Électricité
de France is still pressing a case for further development at Sizewell,
and the Chinese are still hoping to develop a site at Bradwell, using
their own designs. NuGen are insisting, without much tangible
evidence, that their plans for "Moorside" are going ahead. Maybe.
Sadly, despite our objections, the other reporters for The Times
persist in suggesting that Hinkley will be responsible for producing 7%
of the U.K.'s energy needs. As we said in our
(unpublished) letter of complaint, there is a substantial difference
between the U.K.'s energy requirements and their electricity demand.
Hinkley will definitely not meet 7% of the U.K.'s total
energy/power needs.
The Head of Energy at Greenpeace, Hannah Martin, is reported to have
commented, "The reactor designed for Hinkley Point was supposed to be
cooking turkeys for Christmas, 2017. As yet more construction
flaws are revealed at its sister plant under construction in France
[Flamanville] it's starting to look like the only turkey the EPR
reactor design is going to cook is Électricité
de France".
Patently the U.K. government, having made so many enemies with their
so-called BREXIT shenanigans, will not wish to upset the French by
doing what is so obviously the right thing - cancelling the whole
project. Leastways until after the BREXIT arrnagements are
completed. Quite what effect President Trumps ridiculous tweets
will have in relations between America, and by proxy, the U.K., remains
to be seen. With any amount of luck they will take their bat and
ball home with them, along with their stuffed wallets.
One final comment has to be on the Russian provocations and their
impact on European countries. How many of our one-time allies
will feel able to support actions and sanctions against the country
supplying their gas needs? It gives a new slant to George
Orwell's, "Power tends to corrupt and absolute power corrupts
absolutely". Maybe it is not a Good Idea [apologies to A.
A. Milne] to deal with dishonest, corrupt, dictatorial regimes,
after all?
22/3/18
Friendly Jousting - Nothing Serious
Ever since we first became involved in fighting to preserve what
we believe to be a wonderful part of England, we have pointed out the
potential vulnerability of a country who farms out its energy
programmes to foreign powers. It seemed so much like commonsense
that we were almost embarrassed saying it. Yet, those given the
power to make decisions about such matters seem impervious to such
logic. Even in the latest consultation document we pointed out
that:
"There
should be a limit to the extent foreign companies and financiers can be
involved in providing electricity, energy and infra-structure services,
in order to prevent the obvious susceptibility to security and to
prevent an over-dependence on foreign largesse - which may not be quite
as altruistic as the government seems to imagine. It is
obvious that, although the U.K. currently has polite relationships with
the likes of France, South Korea, Japan, and China, we have nonetheless
been at war with all of them at various times in the past.
There is, therefore, no bar on circumstances changing and unfriendly
relationships developing. What safeguards can there be
against such changes? Those involved in the construction
are the only ones that truly know and understand what they have
built. For example, these days it would be quite easy to
build in control systems that can be disabled remotely."
Source: NPS~2018 Page 3
It was, therefore, with utter lack of
surprise to find that the latest Spat between Russia and our government
could have put us at risk.
Much was made of the low level of gas imports from Russia - just 0.3%
of our total gas usage comes from there - but that is to overlook a
couple of other points. Firstly, a lot of European
countries do actually rely on Russian-supplied gas to produce
electricity. We do import from Europe a fair bit of
electricity presumably produced by way of Russian gas.
Secondly, and perhaps more pertinently, what has happened to Russian
relations could very well happen with any of the other countries on
whom we will ultimately rely to produce electricity for us, albeit at
huge cost. (We will apparently be required to pay over £30
billion to France for the priviledge of hosting their Hinkley
experiment. We could, allegedly build the reactor ourselves for
considerably less and without the risks inherent in the involvement of
foreign companies.)
22/3/18
Departure from Euratom Would Mean a Return to Dickensian Standards - Apparently
According to the Guardian:
"For the
nuclear industry, rapid departure from Euratom without a clear
replacement spells disaster. Scientists have warned that British
power stations may not be able to source nuclear fuel if it cannot be
legally transported across borders. The shipment of medical
isotopes used in scans and cancer treatment is also said to be
jeopardised. European workers on shared research projects, such
as experimental fusion reactors, face an equally uncertain future
without Euratom’s separate guarantees of freedom of movement.
Some critics have
that abrupt exit means that by 2025 “you could be doing your
writing by candlelight on a typewriter” as the future of
Britain’s nuclear industry hangs in the balance."
Source: https://www.theguardian.com/politics/2017/jul/10/what-is-euratom-and-why-does-it-matter
Don't you just love the Dickensian illusion - it is a bit more original and illustrative than "when the lights go out", surely?
Still, the House of Lords has now over-ruled ministers over the
government's plans for nuclear co-operation after we leave the
EU. On 22/3/18, the lords voted to insist the UK should not
withdraw from Euratom, until a replacement deal is in
place. They also backed a plan requiring the UK to report
to Parliament regularly on its future arrangements with Euratom.
Getting a bit panicky, MPs are said to be likely to try and overturn
the changes to the Nuclear Safeguards Bill when it returns to the
Commons.
Euratom covers issues such as the transport of radioactive materials,
including those used in medical treatments, or in nuclear power
stations. It has existed since the 1950s.
Some Tory MPs have urged ministers to seek associate membership of
Euratom amid concerns that patients' cancer therapies could be delayed
if isotopes can't be brought in to the UK without a replacement
agreement.
Source: http://www.bbc.co.uk/news/uk-politics-43476337
1/3/18
Submission to the Business, Energy and Industrial Strategy Department
The last few weeks have been spent formulating a response to the
consultation on the National Policy Statement for new nuclear above 1GW
post 2025: siting criteria and process. We have resurrected two
of the original NuGen responses rather than cut and paste the relevant
sections. Nonetheless, the current document has taken a lot of
work. How many others can spare the time or have the inclination
to waste so much of their lives? A copy of the latest document
can be found here:
NPS~2018
10/2/18
It Is Not a (Raw) Turkey!
Private
Eye’s Old Sparky writing in issue 1463 (February, 2018) again
points to the way that the country was stampeded into accepting Électricité
de France's
terms for Hinkley, thereby awarding business to a company who would
struggle to meet due diligence requirements, being over £30
billion in debt and with massive liabilities coming to fruition in the
near future. (Old Sparky notes that the company is "technically
bankrupt". Something we suggested many years ago.)
In a scurrilous attack (ahem) the article attacks the methods used by Électricité
de France
to frighten and manipulate government officials into agreeing to pay
four times the original proposed cost of any electricity produced at
the plant. Initially said by Électricité
de France
to cost around £24/MWh, this has now escalated to nearly
£100/MWh. Although he fails to mention the Électricité
de France
staff seconded to DECC to assist (!) by offering advice and expertise,
he does suggest that hiring the then Prime Minister’s brother as
chief lobbyist was “canny”. What can he mean?
Scary
phrases such as “the lights going out” were all designed to
frighten people into thinking that nuclear was, in some urgent way, the
only way to rescue us. Like knights in lead suits, perhaps?
One might assume that the integrity of the rest of the campaign
is just as solidly based. Past performance demonstrates that the
company's forecasts for costs and schedules are not to be relied on.
However, no-one cooked their 2017 Christmas turkey with
electricity generated by Hinkley, neither did anyone have to put
up with real candles instead of electric ones. Despite
periods of very cold weather, the National Grid has managed to keep
everyone supplied and looks set to continue to do so.
Should this continue, Électricité
de France might need to re-launch its crusade before people latch on to the fallacy.
Not content with Hinkley’s monstrous white elephant / turkey (is there a difference?), Électricité
de France
now want to press ahead with Sizewell. Naturally this will
be 20% cheaper than Hinkley. Probably it will provide
electricity at prices too cheap to meter, too!
Will the vested interests and civil stooges fall for the same ploys again? How many Électricité
de France
employees are still seconded to give “advice and guidance”
to those already very well paid to possess such knowledge? Who
is really making the decisions? Leastways, there will always be
a lucrative job for these people in the power supply industry . . .
Anyone know yet what will happen to all the waste? Actually, we
have problems understanding how construction can commence for a design
that hasn't yet even been finalised, but that just goes to show.
Still, the good news is that the other energy providers have been able
to increase their prices to consumers (using the trick of the internal
market) and are making handsome profits. The only loser is the
poor customer.
28/1/18
Sky High News
Over
the ten years of our existence, we have repeatedly drawn attention to
the vulnerability of any computer system, especially, but not
exclusively, those connected to the internet. Perhaps someone
has read our views and decided that there may be something in what we
say. According to Sky News, 28/1/18, (which has the impressive
recent view of Sellafield, without the cooling towers which most other
publishers lazily use without realising:
"Organisations
involved in critical industry and essential services have been warned
by the Government that they face £17m fines if their
cybersecurity preparations are not up to standard.
Energy,
transport, water, health and digital infrastructure firms could be
fined if they fail to develop robust safeguards protecting themselves
from cyberattacks."
Ref.: https://news.sky.com/story/government-warns-critical-industry-firms-to-prepare-for-cyberattacks-11226555
So, once again, we were right in our advice and opinion. We can
still think of a number of ways in which establishments like Sellafield
can be attacked; all one has to do is consider the
vulnerabilities and the concepts that suggest "this cannot happen to us".
Whatever it is you come up with is possible. The outcome
. . .
27/1/18
Purposeful Consultation?
With
yet another consultation in connection with the seemingly
ever-expanding nuclear aims of the industry, we have to ask
(particularly apropos NuGen's
proposals): with so little detail so far available, what is the
point of further consultations? Does anyone yet know where the
main gate is planned to be? Or what changes will be made to our
transport systems, amenity or environment? What the consequences of mining,
nuclear power plant and nuclear dump potentially all being constructed
at the same time are going to be?
As we note below, although they have been happy to blight resident's
lives, what steps have they taken to ensure adequate compensation has
been available? They don't even know which properties their
property support scheme applies to. Nice firms, nice people.
27/1/18
Mountains into Molehills and Copeland's Emmental Aims
In what can only be assumed to be a tongue-in-cheek article, The Times on 26th
January ("£42 million offer to areas that take nuclear waste"),
suggests that the government will give £42 million to any
community that volunteers to consider hosting the nuclear waste
dump. This is, allegedly, without strings. All
one has to do is to 'express an interest'.
Should one wish to discontinue the process at any stage the £42
million is still to be paid. (Some cynic at Cumbria County
Council is reported to be sceptical of the right of withdrawal; a
view which we wholeheartedly support, but then we have a jaundiced view
of those with vested interests and politicians - not always the same thing - alike.)
The
article specifically targets the Copeland area near Sellafield.
Superficially, of course, it is the logical place to make the hole and
bury the toxic garbage in but, with more thought, perhaps not the best
solution for the long-term. Currently, plans are being drawn up
to limit the number of residents and groups who are likely to
object. The last time they weren't clever enough to exclude the
detractors, which resulted in vastly over-whelming numbers voting
against the dump. Primarily, the aim is to fudge the whole
thing,
limiting the powers of those who have already expressed antagonism to
the dump, including almost all the parish councils and Cumbria
County Council. The way things are going, our light-hearted
suggestion of a couple of years back - that the only views that will be
accepted are those gleaned from Sellafield's canteen - will become a
reality.
Experience
of the biased and cleverly-constructed consultation questions preclude
any faith in the fairness of any proposed scheme to ask those directly
involved. The pro-nuclear Copeland council (headline aim:
"We are encouraging residents
to take pride in our borough and work towards making Copeland a better
place to live, work and visit."
- by permitting these toxic industries to take precedent over tourism
and amenity?) will have a very heavy influence on all the proceedings,
despite the obvious conflicts of interest.
Looking
at the "£42 million" bribe produces some amusing explanations,
as, unsurprisingly, things are not as straightforward as the headline
might suggest: for the first five years the community would be
paid £1 million, eventually rising to £2.5 million for ten
to fifteen years while the boreholes are drilled to ascertain whether
the geology is suitable for such a site. The propaganda
says that the money can be spent on "schemes that benefit the local economy, enhance the environment or improve community well-being". Is that vague enough?
Maybe they should just give all Copeland residents a fair share, but that would only work out at £595 a head1. Would you honestly sell your environment and put your progeny at grave risk of radiation-related illnesses for £595?
For that you are also expected to live on a building site for 15
years, even before they get round to doing the truly risky stuff of
moving nuclear waste. Maybe Allerdale will want a cut, too, for
their support of Sellafield, so we have to share with another 94,300,
which reduces the amount per head to just £254.
We are assured, of course, that the method
proposed for dealing with the waste is perfectly safe - after all, the
scientists tell us so. Despite the fact that nothing man-made
has ever lasted intact for 100,000 years. Promising the
nefarious and meaningless "up to"
figure of 2,000 jobs during construction (so, any figure you like
between 0 and 2,000) is rather unsettling as there are only 8802people
in Copeland, 5,355 in the whole of Cumbria - presumably due to seasonal
fluctuations, currently out of work. The shortfall of "up to"
14,645 means we get back to
the problem of "incomers" bringing their virii and causing leukemia and
other strange afflictions normally associated with exposure to
radioactive materials. To us uneducated people, it remains a
puzzle why other major infra-structure projects don't have the same
problem, but that is another story.
Do You Really Want to Sell the County for Under 58 Pence per Person per Week?
If you want more fun, break down the promised amount into its
components. Assuming that the project is completed within 20
years, allowing for the usual "over-runs", then each person would gain
£30 per year, or 58 pence per week for all the inconvenience and
risk. Assuming that inflation will probably continue running at
around 3% per annum, at the end of the 20 year period, the effective
price of disposing of Copeland will be even less.. When
politicians can charge £6,000 per day
to pseudo-Chinese companies, using the contacts and influence they have
gained over their years of (self-) service this might seem like small
beer.
(Except it would only buy a pint per month.)
Attack From the North
It
seems that the entire area is under threat. St. Bees Head
is to become a coalmining hub, with all produce being shipped out by
rail. Along the current railway system with its 150 year
old method of working and vulnerability to landslides?
Really? The coastal line isn't nick-named "avalanche alley"
by railway men for no reason.
It does provoke the thought: who sold West Cumbria's sea bed to
these people? Can anyone just come along to drill and excavate?
Then
NuGen are still making grunting sounds as they try to persuade some
gullible organisation or state (anyone!) to give them £billions
to build a great white elephant along the lines of Hinkley. NuGen, of course, having
blighted the entire Beckermet area have no apparent interest in making
good the losses people will encounter should they try to sell their
property. Whether the project goes ahead or not, property
prices in the immediate area of Moorside will suffer
dramatically. Recent information suggests that NuGen have
so little interest in compensating people that, even though a meeting
specifically to discuss that problem was held, they hadn't even
bothered to look at their own plans to see who and what was
affected or what compensation would be offered to those affected. No doubt they were too busy talking to the clever
people in London to worry about the little people directly affected.
. . . and From Below
Not
only are the terrestial and marine environments - with all their
amenity - under threat, but so, too, is the subterranean.
Despite the many findings, particularly the Nirex Enquiry of the 1990s,
which concluded that the scientific knowledge was insufficient to
prove that disposal was safe for any site. We have seen
nothing to contradict that view. Of course, the figures
produced for the safety case were suitably fudged to the benefit of
those pushing for the dump. Back then, of course, the thin
end of the wedge to the dump was referred to as a "rock
characterisation facility". Nowadays the much less
intrusive term relates to boreholes. The pretence being
that this is a much neater and less obvious and destructive method of
drilling into the ground. Just a step up from a molehill,
then? Given that each square metre of any patch of land is
unique, and the number of studies already carried out proving that the
Sellafield area is geologically unsuitable for the dump, why do these
allegedly brainy people persist in the belief that because they wish it
to be suitable it will eventually be demonstrated to be so?
Maybe they have forgotten the earthquakes caused by fracking just over
the border in Lancashire and Yorkshire.
Just to remind younger readers, we quote from the frontispiece of a report entitled "Radioactive
waste disposal at Sellafield, U.K.: Site Selection, Geological
and Engineering Problems. Edited by Dr. R. Stuart Haszledine &
Professor David K. Smythe", published in 1996 :
"We
are concerned that the scientists may be set, or may be setting
themselves, unrealistic targets in time ... Much of the scientific work
extends beyond the familiar frontiers of science, and needs at each
stage to be subjected to review by peer groups of scientists."
"We were forcibly struck by the extent to which some scientific reports of Nirex are protected from wider scrutiny."
From Disposal of Radioactive Wastes in Deep Repositories - a report of the Royal Society Study Group, November, 1994.
A secondary quotation was also included:
"Members
of the public could be forgiven if they came to the conclusion that,
somehow and somewhere, a decision had already been made to construct a
deep repository for radioactive waste at Sellafield."
Sir John Knill - Quarterly Journal of Engineering Geology, Vol. 29, 1996.
Ref.: http://carbcap.geos.ed.ac.uk/sellafield/Section0.pdf
As an Électricité
de France
man might say, plus ça change, plus c'est la même chose,
but revisiting the Nirex fiasco makes one wonder whether, given the
reports into geological conditions around Sellafield, the NuGen site is
in any way following the same path. Do the geological conditions
on the site promote its use for a nuclear establishment? Does
anyone know a tame expert geologist?
Anyone
who believes that the area would benefit in any way from the bribe for
hosting the dump should consider the state of an area that has already
benefited (if that is the correct term!) from hosting the nuclear
industry for over 70 years already. Over £77
billion is the current estimate for Sellafield's clean-up.
How much of that actually goes into the local economy? The
sad state of many areas in Copeland gives lie to the propaganda.
1 Based on 70,603 residents of Copeland as per the National Census, 2011.
2 Official figures from Copeland JobCentre.
27/1/18
Due Diligence Applies Sometimes - Apparently
Following
the collapse of Carillion with debts of around £1.3 billion,
things may have been tightened up a bit at the BIES. Perhaps it
is just that the connection between Carillion's interim chief
executive, who was in charge until the company went into voluntary
liquidation last week and a fracking company called Third Energy, where
he is a non-executive chairman, but Third Energy will not be able to
start work until such time as they have furnished accounts to business
secretary, Greg Clark.
According to reports, Third Energy had satisfied the requirements for
safety and environmental concerns, but the accounts, which were due
last September (try that at home!) were needed to show that there was a
level of financial resilience. This would require proof that it
had enough money to cover liabilities, including funding
decommissioning costs.
As we note below, these checks seem to have been overlooked by those
supporting applications by Électricité
de France and Toshiba. Both of these
companies have debts and liabilities exceeding those of Carillion, and
Toshiba at least, has a history of financial manipulation which
resulted in grossly distorted profit recording. How can they
still be in the running for government contracts?
16/1/18
Failure of Government to Exercise Due Diligence
The
collapse of Carillion illustrates prefectly our point about the
apparent carelessness by government in respect of the legal requirement
for due diligence checks to be carried out. We, naturally, wrote
our letter to The Times, but, equally naturally, they didn't print it.
A shame really, as we were very pleased with our quotation of
the old Japanese adage,: you never find just one cockroach.
Perhaps we can use it again soon?
Despite most of the business world knowing some time ago that the
company was "a dead man walking", as it was described in The Times, the
government carried on issuing multi-million pound contracts to it.
Questions are now being asked about the role of the Chief
Finance Officer and the various high payments to managers and
ex-managers, but it is too late now to help some of the smaller firms
tucked under Carillion's wings. The amount of debt (so far as we
can tell, including the Pension Fund deficit) is a mere £1.4
billion.
The conundrum is this: if the company was being awarded contracts
despite the due diligence checks that, had they been performed, would
have highlighted the risk, how did it come about that Électricité
de France,
with its debts of over £30 billion and liabilities in terms of
nuclear reactor maintenance which are believed to amount to over
£250 billion in the next few years; the fact that the Chief
Finance Officer quit saying the Hinkley project was likely to bring
about the demise of the company; and all the other indicators
that should have sounded warnings to government ministers, still get
the contract to build Hinkley? Just as puzzling is that
Toshiba's problems had been known for several years before they came to
their inevitable conclusion, was still permitted to go along the road
of proposing to build "Moorside". We believe that due diligence
checks would have revealed the risks well before anything was given the
go-ahead.
So where, one may ask, was the failure? The losses and risks at
Toshiba were known long before the application was considered, did
anyone in government perform the due diligence checks? Did they
find the risks? How were the results presented and to whom, by
whom? We prefer to think that this was not a case of government
officials getting too close to the company they were supposedly
checking. There is, of course, a lot of money at stake and it is
nice to give your friends benefits when they have helped you.
16/1/18
Enquiries Afoot
We
have recently submitted FOI requests to the ONR following our discovery
of brake failures on DRS railway rolling stock transporting nuclear
materials and to the Marine Climate Change Impacts Partnership.about
the impact of using the Irish Sea as a heat sink.
A few weeks later we received the response that, actually there had
been no brake failures (interestingly different from the report, which
distinctly said "Direct Rail Services rolling stock suffered brake failures as a result of maintenance issues.")
but that the inspector had noticed that the brake shoes were worn on a
wagon. Further inspection revealed that more than one vehicle
was involved. Direct Rail Services did not know how this had
come about and would be looking into it. That's alright then.
The response concludes, "At all times ONR has been satisfied that nuclear safety has not or could not be compromised by this discovery." No animals have been hurt and there was never any danger, seems to be the mantra.
An interesting and
amusing letter in response to an article in The Times re. zip wire
rides in the county. Our light-hearted look can be found here: Dorking Man Letter - a Response
1/1/18
Left Hand Doesn't Know There is a Right Hand
To
start the New Year off well, we are advised by The Times that
consultancy firms working for the U.K. government on the Hinkley Point
project were advising the Chinese investor and its French builder at
the same time. How cosy is that? Apparently
KPMG received £4.4 million for their financial advice to the
Energy and Business Departments (originally DECC). This is
despite the company telling officials that they were already working
for the China General Nuclear Power Corporation, one of those involved
in Hinkley's construction.
We
note below (30/12/17) "Yet Another Year - a Progress Report?" an
earlier report of potential conflict of interest with Jacobs, a U.S.
engineering company, and a subsidiary, Leigh Fisher. The
former company's U.K. branch is working for Électricité
de France at Hinkley, while Leigh Fisher were supplying government
officials with advice about the project.
KPMG
claims to have "mature policies and procedures . . . to identify and
manage potential conflicts of interest", including "properly
segregated resources . . . to handle projects." Presumably
the company would have noticed the potential conflict of interest and
advised the government officials about it. Why then was the
information apparently ignored? We are informed that a
Freedom of Information request produced documents that were
substantially redacted by the department. Would we be
correct in interpreting this as an admission that those people knew
what they had allowed to happen was wrong? Of course,
commercial confidentiality is a beautiful cover-up for hiding material
that officials don't want others to know about. Happily for
us, one team of Lazard, who produced the tender document, worked out of
the Paris office, where it has "a relationship" with
Électricité de France, whilst the other worked from
London, thus providing high-quality independent advice.
Source: https://www.thetimes.co.uk/article/advisers-on-hinkley-point-c-nuclear-power-station-had-cosy-ties-to-both-sides-xftxcl9sz (Original article by Alex Ralph.)
Nearly
£4½ million to KPMG, £2.6 million to Lazard,
£1.2 million to Leigh Fisher, every incentive there to keep
people honest. After all, this is a project that could
yield index-linked profits in excess of £50 billion over the next
few decades.
Nothing to see here, kindly move on.
For
an insight into the background of the latest nuclear change of heart
see our entry of the 22/12/17 below and The Guardian article:
https://www.theguardian.com/news/2017/dec/21/hinkley-point-c-dreadful-deal-behind-worlds-most-expensive-power-plant
31/12/17
Following One's Nose
Einstein once observed that scientists can go
wrong
in one of two ways: the Devil can lead him by the nose with a
false hypothethis, or the scientist's thinking is sloppy. Einstein
seems to have overlooked the third possibility: the corruption of science
by large multi-national companies who pursue money with scant
regard to moral issues, the financial goal prevailing over accurate
science. We can think of one prime example. In our view,
it also seems to have spread to government officials. We note
below the Heathrow challenge that is based on the alleged bias of
government officials influencing the outcome of consultations.
We reckon that we can find at least as many examples of bias and
illogical decisions in nuclear history - from public account committee
and select committees all the way to high court findings. Things
may get interesting.
Please feel free to take part in
the latest consultation (how many more?), the snappily-named NATIONAL POLICY STATEMENT FOR
NEW NUCLEAR ABOVE 1GW POST 2025 SITING CRITERIA AND PROCESS. Details can be found at:
Quite the poorest document we have seen from the government, it seems
to have been cobbled together from disparate sources and even the
formatting is different from section to section. It is almost as
if it were done in haste to get it published in the run up to the
festive season in the hope that it might be overlooked. A good
job we aren't cynical. Strange how the majority of these
consultations always avail themselves of public holiday periods, too.
30/12/17
Yet Another Year - a Progress Report?
Back
in 2007, yes a whole decade ago, the Chief Executive of Électricité de France
forecast with confidence that by 2017 the nation would be using electricity
from Hinkley Point to cook their turkeys. He also confirmed that the
lights would go out, too.
So it was that, after many delays the project was eventually approved by the
Prime Minister, Theresa May, and work commenced. Somewhat sheepishly, little
while later, Électricité de France
announced that some of the concrete already laid as trunking for service pipes
and cables was of the wrong specification and cracking, so it would have to be
dug up and redone. The matter of falsified safety inspections of reactor
grade steel by Creuset hardly helped to inspire confidence.
The
Group’s net financial debt was €36.2 billion as reported by them on 30th
June, 2016, compared to €37.4 billion on 31st December, 2015.
Source:
https://www.edf-group/dedicated-sections/finance/investors-analysts/credits/net-financial-debt-and-cash-flow
Needless
to say, the classic method of putting a positive spin on bad news – that of
ignoring the main problem and concentrating on any comparatively good news -
made it sound that a reduction of €1.2 was A Very Good Thing. (Our apologies to A. A. Milne.) Alright, so they still owed €35 billion,
but, hey, it is coming down! However, the total was not really due to
any change in their practices but, in the main, was down to favourable exchange
rates. It seems likely that these fluctuations will stabilise in the
short-term future, which does not augur well for Électricité de France's
finances. The French government has already had to bail out the company
and may well have to take further measures.
In the interim, government officials are still trying to convince the world
that promising to buy electricity at £9250 per Megawatt, was a sensible option,
even though solar power and wind farms can produce it for around half the
price. It was such a good idea to install Électricité de France
employees in the seat of government. Given the attitude of the French
government to the negotiations for the U.K.'s leaving the European Community
I'm afraid I would be tempted to tell them to take their hole and equipment
home.
Oop norf, NuGen seem to have fared just as badly. Toshiba’s problems,
which lead to that company’s withdrawal from all nuclear development, continue
to affect the proposals to build at "Moorside", which are looking
increasingly unlikely to go ahead. Their chief executive seems to have
lost his tongue of late, muttering - without much conviction - about his
certainty that the project will go ahead with anywhere between 110% and 120%
conviction. Attempts to persuade South Korea to stump up some money and
invest in the project, along with the ubiquitous Chinese money, seems to have
turned into a power struggle as KEPCO apparently wishes to install its own
reactors and not the Westinghouse version on which the NuGen scheme was based.
Presumably this will mean a further delay as the regulators assess the new
designs. That process is likely to take four years. Of course,
that leaves Cumbrians in limbo, and the government apparently sees no reason to
interfere to assist residents blighted by the proposals; a situation that will continue whether the
scheme goes ahead or not.
Government's attitude to nuclear seems to have a clear bias. For
example, just twelve months ago The Times reported that the Office for Nuclear
Regulation suggested that the number of safety issues had remained stable for
decade. Except that between 2010 and 2012 the rate of faults recorded
has doubled and was running at the rate of one a day. Conveniently, the
ONR gave 973 "anomalies" a score of zero on the International Nuclear
Event Scale, thereby indicating that they were of little or no consequence.
Their opinion on most of these events seems rather dubious. The
amusing part of these (as we see them) fudges, is that those incidents rated at
zero have been more serious than those actually logged as safety problems.
These reports led to suggestions that the ONR is too close to the
industry it is supposed to be regulating.
Source: The Times, 27/12/17
and 28/12/17. Dozens of Nuclear Blunders Ignored and Nuclear Watchdog
Under Review, respectively.
January saw hundreds of protesters joining forces to protest against pylons
planned for the Lake District. It still puzzles us how people can ignore
the somewhat larger elephant that is "Moorside". Without
"Moorside" there is no need for the pylons. Why not join
forces and scotch the lot? West Cumbria has done its bit in putting up
with nuclear for half a century; surely it is now time for someone else to
share the load?
More bad news for Hinkley came in the New Year. The Times reported that
taxpayers are now likely to be facing a £2 billion bill for the plant in the
form of cheap loans. Despite denials from the likes of Greg Clark, the
business secretary, ministers were told in a written answer that the loan
remains on the books in case Électricité de France get into difficulties
finding funding. Anyone like to place bets?
By February, the rumblings about Toshiba's likely withdrawal from NuGen were
getting much louder and people became much more aware of the dishonesty at the
heart of the company. As we have already suggested, it might seem that
due diligence has been in short supply. There are, allegedly, government
rules which prohibit companies with inadequate financial resources from gaining
official contracts. For some reason, Électricité de France and Toshiba
seem to have got away with it. How?
In March we learned of a bungle (euphemism!) that cost the taxpayer £100
million as the Nuclear Decommissioning Authority had to agree to pay out settlements
to EnergySolutions and Bechtel, after contract awarding had been
"manipulated" and "fudged". Intriguingly, no-one
appears to have been disciplined over this apparently deliberate manipulation.
No investigation into how, where, when and why. It seems that the
nuclear industry is immune to prosecution. Why? Our incredulity
goes back to our first experience when, having asked the ACC for Cumbria,
Michelle Skeer, what investigation had been undertaken following the findings
of the Redfern Committee into tissue retention and other illegal practices
carried out by a wide variety of people in Cumbria. There was no
investigation came the reply. Seven years on, what was the point of the
Redfern Committee? To the best of our knowledge, the only action taken
was the closure of the local mortuary.
Also in March, Toshiba filed for bankruptcy protection in the American courts.
The company announced projected losses of £7.3 billion for 2017.
Aptly, on 1st April, Alistair Osborne wrote in The Times pointing
out that Toshiba had been obliged to pay out $139 million to take full control
of the "Moorside" project which it doesn't want to be involved with
anymore. Toshiba's woes had been compounded by the French company and
partner in the project, Engie, exercising their right to withdraw.
In the same month, Électricité de France, who wished to delay the closure of
the Fessenheim plant, contrary to the wishes of the French government, were
said to be in need of €50 billion to renovate 58 reactors around France.
Further bail-outs by the French government may appear to be necessary.
The end of April saw Whitehall officials being rebuked for "egregious" and “unjustifiable delays” in revealing
details of government contracts for Hinkley and allegations of a conflict of
interest. Surely not! Leigh Fisher, owned by Jacobs Engineering,
an American group, was paid £1.2 million for its advice on the Hinkley project,
while Jacobs Engineering - whose advice helped to justify the government agreeing
to the 35 year term with Électricité de France - was working for . . .
Électricité de France.
By May, Toshiba had announced that it was "mothballing" the
"Moorside" project.
Further troubles appeared as the government suddenly realised that exiting the
European Community would also mean leaving Euratom, the nuclear safety and
research watchdog. Bearing in mind the state of the U.K.'s own nuclear
inspectors, as per the report by Mike Weightman back in 2011, which forecast
staff shortages which might result in the industry inspecting and reporting on
itself, withdrawal from Euratom would produce serious problems. Various
media sources carried a bit of the idea, for example:
https://www.theguardian.com/politics/2017/jul/10/what-is-euratom-and-why-does-it-matter
A
second-rate system was proposed in the Queen's speech late in June, but that
has yet to appear.
The concept of small, modular, nuclear reactors closer to the point of
electricity usage arrived at last with the government in the middle of May.
A report on the idea was to appear "in due course". By then it was already nearly a year
late.
Towards the end of May we were getting stories about the potential for Chinese
investment at "Moorside". It seems that the Chinese are using
robust tactics to get their way over various nuclear developments.
They have assisted with Hinkley and want to build at Bradwell, Essex.
In the latter case it seems that they want to use their own reactors,
presumably as a foothold in the world-wide scheme of things. A
successful completion at Bradwell with Chinese reactors would produce
considerable sales world-wide.
Despite all the history, America's Donald Trump decided to dust off the Yucca
Mountain project. (See archived files for details.) $15 billion
had already been invested in the site before it was written off.
However, no other similar sites have been found and the stockpile of nuclear
waste is growing . . .
At the end of May, there was more movement in Europe as, conveniently for
Électricité de France, European competition regulators cleared their takeover
of Areva's nuclear business. Areva is, like Électricité de France,
French state supported and was responsible for the Olkiluoto 3 nuclear reactor,
which is ten years late and seriously over-budget. It was also announced
that the Finnish owners of Olkiluoto site are to drop legal action against
Areva.
June saw South Korea announce that it was ending atomic energy. Their
president, Moon Jae-in, said that safety was the biggest reason for the change
of heart. He added that the country's 25 nuclear reactors would be taken
off-line as they reach the end of their working lives and that new construction
will be suspended. Sadly, the South Koreans seem to have no qualms about
supplying this presumably dangerous system to the likes of "Moorside"
ably encouraged by those in our own government with their vested interests and
skewed advice.
More bad news for the nuclear industry followed later that month when the
National Audit Committee determined what we all already knew: that the
government had "locked consumers
into a risky and expensive project". The report found
that those responsible for the deal had not done a proper analysis, only
considering the impact on bills up to 2030, when the terms have committed us to
paying them until 2060. Who says that the whole process is misguided? Actually, we think it is misguided and
corrupt.
It was an ill-wind that blew the announcement that wind power could produce
electricity 25% cheaper than Hinkley's into the media. The costs
for wind and solar power have been falling as their adoption increases - the
exact opposite of nuclear. Let us not forget that, once a wind farm or
solar farm have fulfilled their useful life they can just be dismantled;
a quick and easy process with no remaining detriment to the sites.
The sorry state of industrial relations at Sellafield came to the fore in July,
and was repeated in subsequent months, with several different factions opting
for strike action following failed pay negotiations.
Also in July, our forecast from first involvement that the answer to short-term
electricity needs could be met if storage of any unused surplus electricity
generated by wind and solar sources from when demand is low could be mastered.
Step forward Elon Musk, who produced such a system in Australia.
It is capable of storing 129 megawatt hours (reportedly enough for 30,000 homes)
and was built in 100 days.
Yet another Select Committee reported, this time at the end of July, concluding
that the government's energy policy is a mess. They suggested that
decarbonisation had been pursued at the expense of affordability. For
some reason, they also suggested that the nuclear plant at Hinkley is "an expensive disaster". They
added that, "[the deal] had locked
consumers into a risky and expensive project and did not consider sufficiently
the risks and costs to consumers." Haven't we said this about
each and every nuclear development? Will anyone ever listen to us?
A reminder of the continuance of Fukushima's problems came in August.
After many failed attempts, those endeavouring to find the molten core of the
reactors managed to build a robot that withstood - at least for a short while -
the intense radiation present at the site.
Every previous attempt failed due to the electronics being overcome by
the intense radiation. Already forecast to be likely to cost over £142
billion, this clean-up knocks Sellafield's own house-keeping into second place.
In
the same month two American utility companies decided they were flogging a dead
horse and abandoned their "uneconomical"
projects. Unlike the U.K., the companies felt they couldn't ask the
customers to foot the bill. How refreshing.
September
saw an analysis of the electricity supply market and the unfortunate side
effect of wind-farms on wildlife, which included birds being decapitated when
they flew into the blades. Actually, most reports seem to suggest that
the death of birds flying near to wind turbine blades is more usually due to
the sudden drop in pressure on the down-side of the blades, rather than by the
birds flying into the blades per se,
but what the heck? The analyst, Alistair Osborne, writing in The Times
on September 1st, concluded that the government's continued nuclear
policy was illogical, and, "As
policies go, it's as headless as a poor kamikaze kittiwake".
A subsidy-free solar farm was opened on 26th September. A
combination of falling costs for solar panels, a convenient topography and the
ability to store surplus electricity in giant batteries will enable the plant
to run without a direct subsidy.
In a forlorn attempt to justify the Hinkley deal, officials responsible for it
said that it was the best they dare risk, as otherwise the entire project might
have failed. The influence of vested interests seems to have prevailed
in the end though. We have constantly drawn attention to the flaws in
seconding Électricité de France employees to DECC. The public’s perception
that the government has been distorting facts because of a dishonest influence
is a natural consequence thereof.
October saw the taxpayer getting a bill for £122 million after the National
Audit Office issued yet another damning report of the nuclear industry.
It said that the decommissioning authority's commercial strategy for dealing
with nuclear waste was "wholly inappropriate and needs to be
redrawn". Good to know that those who are supposed to be experts in
the nuclear field can be so wrong, eh? The chief executive who oversaw
the manipulated contracting process announced his retirement and toddled off
with no disciplinary consequences of the debacle. The Audit Committee
also found that the authority had "a poor understanding of what was
happening on its estate" and might have paid a previous contractor for
work it had not done. Forgive us, but who failed to check? Did the
previous contractor not know that it had been paid for work it had not
completed? Did anyone follow the money thereafter? Can anyone be bothered to try to retrieve
the money if it has been incorrectly paid?
Later in the month, army bomb disposal experts were called to attend to
canisters of potentially explosive solvents dating back to the 1990s.
The event was mitigated by the fact that the solvents weren't radioactive, but
then an unnamed expert pointed out that they were actually stored near far more
dangerous materials in a laboratory.
Source: "Sellafield Chemicals Scare Defused by
Army", Robin Henry, The Times, 22nd October, 2017.
Still,
no animals were harmed and there was no danger to . . . etc.
Hinkley Point's poor value for the consumer was again highlighted by Alistair
Osborne on the 1st November, following yet another report by a
public accounts committee. The conclusion seems to have been that we
could have built four nuclear power plants of our own for the same price the
Hinkley deal will cost us. Or become nuclear free for far, far less.
In November and December, there were a couple articles in The Times that seemed
to have been inspired by nuclear supporters. One determined that living
in London was as bad for people's health as a nuclear leak. (Oliver
Moody, 23/11/17, "Nuclear Fallout no Worse Than Living in London".)
Based on an article which appeared in a publication of the Institution
of Chemical Engineers, the scenario envisaged bore (in our opinion) little
semblance to a real-life event - especially not the Sellafield and
"Moorside" domino potential. The second article was almost
laughable and was by Rod Liddle. Perhaps he was just trying to be
provocative when he said that only 30 people had been killed by the Chernobyl
disaster. Our complaint was met with the response that the editor had
checked the "facts" by reference to the BBC and Forbes magazine.
When we countered with the World Health Report of 2005, which was the
result of collaboration by over 100 scientists. This had concluded that
"About 4,000 cases of thyroid cancer,
mainly in children and adolescents have resulted from the accident's
contamination and at least nine children have died of thyroid cancer'
however, the survival rate amongst such cancer victims, judging from
experience in Belarus, has been almost 99%"
Source: http://www.who.int/mediacentre/news/releases/2005/pr38/en/
Although
they may not have died, the majority of victims have certainly suffered.
We also listed a few of the very many (reported) major accidents around the
world. Answer came there none.
By December even the mini reactors were being cast into shadow as ministers
determined that the cost would be even greater than Hinkley. Rolls-Royce
and Nuscale were hoping for government support for their reactor designs,
which, it was hoped would be built by 2020. Having sat on a report by
Atkins for over a year, the government eventually published it on 7/12/17.
The conclusions were that the cost would be almost 10% more expensive even
than Hinkley's £92.50 per megawatt hour.
Sensing some real concern, by the middle of December, 100 MPs called on the
government to maintain close links with Euratom. Failing to maintain the
ties will be expensive and difficult, especially when staff shortages and lack
of experienced English-speaking inspectors pile on the pressure.
More flaws were detected in a reactor of the same design as that planned for
Hinkley. Welding faults were found in the construction of the plant,
Taishan 1, which is being built near Macau in China for the China General
Nuclear Power Corporation. This is the second deferment. Other
Électricité de France sites are, true to tradition, running very late.
By now, of course, as we said at the beginning of this article, the Hinkley
plant should have been up and running and we should all have cooked our
Christmas turkeys using its electricity. Good job we didn't rely on
them. Perhaps it is time that someone
cooked Électricité de France’s goose?
To close the year, we learn that Colchester Borough Council have refused to
accept new nuclear developments in their bailiwick. Perhaps more
relevant to our own cause is the suggestion that consultation plans for the
third runway at Heathrow would be illegal due to bias by ministers towards the
expansion. Sounds like this could be a very interesting development from
a legal standpoint. It is difficult to imagine any subject more biased
than nuclear development. Again we would only have to draw attention to
the secondment of Électricité de France staff to the decision-making body and
the various reports advising against nuclear. Anyone know a good lawyer?
Best wishes for the New Year.
22/12/17
Stop Hinkley
An excellent
article can be found in The Guardian of 21/12/17. Thanks to
Stop Hinkley for sending us the latest newsletter with a series of
relevant links, including a particularly good synopsis of the reasons
behind the sudden reversal of the fortunes of the nuclear industry.
The article, entitled "Hinkley Point C Dreadful Deal Behind
World's Most Expensive Power Plant", is by Holly Watt and demonstrates
many of the points we have covered over the years, but still misses one
which we believe was crucial: that of the meeting held at
Sellafield as related in the book by Harold Bolter, "Inside
Sellafield".
According to Bolter, who was a BNFL director at Sellafield, present were Geoffrey Tucker, a PR "fixer" (obituary: http://www.telegraph.co.uk/news/obituaries/1418978/Geoffrey-Tucker.html) with many political contacts; Con Allday, CEO, (later Sir) Christopher Harding, (obituary: http://www.independent.co.uk/arts-entertainment/obituary-sir-christopher-harding-1132693.html)
a chairman of British Nuclear Fuels and later chairman of SONE -
Supporters of Nuclear Energy, and Harold Bolter. The relevant
report of the meeting says, "We made the greenhouse effect the talking
point of a series of dinners which Geoffrey had organised and, whether
they were effective or not, it is a fact that shortly after, Bernard
Ingham, Mrs. Thatcher's Chief Press Secretary, had attended one of the
dinners, the Prime Minister began to show more interest in the issue."
Ingham then became a consultant to BNFL. (After the
Hillsborough disaster Ingham followed the police misinformation
supplied and blamed drunken yobs. This stance he apparently
maintained even after the 2016 verdict and refused to apologise for
being wrong.)
To our minds, the scariest bit then comes, ". . . we also talked about education and [Bolter's] belief that we must also capture the minds, if not the hearts, of young children . . ."
The problem for us mere mortals - no matter that we speak the truth -
is that we do not have the money or resources to buy the ear of those
making the decisions. A good dinner and the offer of a job buys
a lot of good will, it appears.
To read the original article: https://www.theguardian.com/news/2017/dec/21/hinkley-point-c-dreadful-deal-behind-worlds-most-expensive-power-plant
29/12/17
Reasons not to go ahead with new nuclear in Cumbria.
While the government appears to be fixated on the perceived CO2 levels
of the various methods of electricity generation, we believe that other
environmental factors – the direct and indirect heat discharges,
chemical discharges, and impact on the amenity – should also be
considered in the balance.
Evidence given to the House of Commons, Energy and Climate Change
Committee, printed on 17th March, 2010, included the following
points:
- Contradictions to the
department’s assertions that nuclear electricity generation
is carbon free/climate friendly, safe for the environment, safe
for human health, economic, sustainable, and home grown.
- CO2 emissions
from Fellside, Sellafield’s power station, in a three year period
amounted to over 3 million tonnes with gas consumption of more than
£30 million in the single year.
- Sellafield
quadrupled its emissions of
hydrofluorocarbons, which are hundreds
and can be thousands of times more
powerful than carbon dioxide. In 2008 alone Sellafield
produced more than 400 kgs.
- Nitrous dioxide arises from the production of nitric acid, which Sellafield uses in very large quantities. N2O is not only 310 times more potent than CO2, but it lasts over 100 years in the troposphere.
The constant discharges associated with nuclear electricity generating
plants seem to be deliberately overlooked and, as with the NuGen
consultation, results deliberately distorted by PR specialists to give
a positive bias to them, whilst difficult questions to which answers
should be available, for example, the effect of discharging 2½
billion gallons of water per day heated to 14°
above ambient temperature will have
on the Irish Sea, together with
the impact of dissipating over 7
Gigawatts of thermal energy to the atmosphere.
We have continually noted out concerns about the poor quality of the railway serving Sellafield.
Many events have received no publicity, but we note from http://www.onr.org.uk/intervention-records/1718/sellafield-17-042.htm, a series of reports on inspections of sections of Sellafield operations. One seems particularly concerning:
LC28 – Examination, Inspection, Maintenance and Testing
I consider SL needs to
demonstrate that it is adequately undertaking an intelligent customer
role with respect to the delegation of rail vehicle maintenance to its
supplier (Direct Rail Services (DRS)), which includes items
relied on to deliver nuclear
safety; safety mechanisms (SM’s)
– i.e. braking systems. A
number of recent incidents regarding brake failures
underpin this rating.
So, not only do we have a rickety rail system working with 150 year-old
practices, but we also have rolling stock whose maintenance seems to be
suspect. What a great system!
21/8/17
Smugness and Contentment
It
is always nice to discover that things you have brought up as good
arguments are found to be correct by those who feel they know better.
In this case, the mention we made about the potential for
foreign powers to install "backdoors" into technical equipment used by
major installations, thus giving the foreign power control over the
infrastructure. Commonly called cyber-attacks, these events are
happening with increasing regularity and are now not just the preserve
of those with access to huge resources. From nuclear
establishments to the NHS the attacks have wreaked havoc and cost
millions of pounds to detect and rectify. In some cases, data
has been encoded and ransoms demanded - usually without recovery even
after payment of the ransom demanded.
The complacency which still abound over the matters is indicative of
the ignorance of those responsible for protecting the nation's welfare.
It is trendy to regard the attacks as stemming from established
hackers like Russia, China, and North Korea, but in reality anyone can
discover the weaknesses and embed malware. The effects can be
made to appear instantly or lie dormant until triggered by the hacker.
The malware can be designed to alter the performance of the
circuit, disrupting dependent processes - extremely dangerous in the
nuclear industry - or merely to spy on operations, for the economic or
intelligence-gathering benefit of the hackers.
Over seven years ago we made this point. We were correct, as,
according to The Times, 17/8/17, China may have planted a "snooper's
backdoor in software used by scores of big businesses, including the
National Grid". (Ref. Chinese spies build backdoor in Britain's
business software, Mark Bridge.)
In our original assessment we pointed out that the major producers of
integrated circuits, or "chips", the building blocks of modern devices,
are now in China, Japan, and, to a lesser extent Russis. Some of
the chips contain coding for basic operations but can be electronically
altered to perform specific tasks more precisely and efficiently.
These are known as EEPROMs (electronically erasable programmable
read only memory). The tailoring of the actions of these chips
requires production of thousands of lines of computer code which is
then added to the basic codes already embedded in the chip. The
supplied chips already contain thousands of lines of code already along
with the semiconductors and associated electronic components which
ultimately perform the control operations. Because the basic
functions of the chip are already accepted, any spurious code remains
unspotted. The only way to ensure device integrity is to analyse
every line of code to examine its purpose and relevance to the required
control function. This, of course, is time-consuming and
expensive. It is far easier to accept that the chip performs its
functions without going to all that effort. Inevitably, that is
what happens. However, this acceptance of integrity is the
weakness of the system. Even if a manufacturer specified his own
codes for the basic chip, there is nothing to stop the manufacturer
changing or adding to it. This inherent weakness is what enabled
the Stuxnet and related virii to control centrifuges used in production
of nuclear fuel.
The attacks on the NHS were well publicised, but were down to a
weakness incorporated in the operating system. Obviously it is
easier to spot weaknesses when a specific area of the coding is
breached. However, it is not so easy to dismantle a circuit to
examine its compnonents and ensure that they are doing what they were
designed to do - and nothing more.
Those engaged in the supply of modems we mentioned in the earlier
article would find it very easy to insert malware with a low chance of
being detected. At present the current focus is on server
software, where the Chinese are alleged to have incorporated malicious
code, which allowed hackers to access data and tamper with their
systems. When software has been verified as being malware free,
it is presented to the user with a digital signature, indicating that
it is safe to use. Current virii can now include such
signatures, making it all the more difficult to detect the presence of
malware.
The Times article points out that a variety of American, French and
Russian companies have already been attacked. Of course,
those affected make out that they are fully prepared for such attacks.
However, we shall see.
8/8/17
More on Due Diligence
Defined as the measure of prudence, responsibility, and diligence that
is expected from, and ordinarily exercised by, a reasonable and prudent
person under the circumstances, due diligence is one of the basic tenets of business and a failure to
carry out due diligence checks can be used in a court to illustrate
management failures. The term is constant, regardless of
the size of business - from the smallest to the
multi-nationals. One might reasonably expect that the
government would carry out the basic checks before entering into huge
contracts, such as those with Électricité de
France and Toshiba. Yet, and despite many warnings,
those in DECC and DBEIS are hell-bent on forcing through the
projects, seemingly without pursuing due diligence requirements.
Many years ago we attended a meeting in Keswick where a French attendee
pointed out that some would view Électricité de
France as bankrupt. It was a
nice thought - those in charge of the scheme would be thwarted by due
diligence checks carried out on behalf of the government.
All would be revealed, we thought. Yet it wasn't. After a
few stalls, the Prime Minister elected to continue to build this
massive white elephant. This in face of a wide variety of
expert opinions, including a government National Audit committee
finding of conflicts of interests, budget over-runs and delays.
It was, therefore, refreshing to read in issue 1448 (July, 2017) of Private Eye an
article by Old Sparky, which said exactly what the Keswick attendee had
said so long ago.
Électricité de
France is committed to start decommissioning the vast number of nuclear
plants it runs. Starting from a debt position of £37
billion, the estimates are that it will require around £75
billion for the decommissioning and £74 billion is required for
safety upgrades. Then there is the need for a nuclear dump,
which is expected to cost at least £20 billion.
Warnings were given in early 2016 by the company’s chief finance
officer, Thomas Piquemal, who then left the company, saying that he
feared for the financial viability of Électricité de
France if they continued with
Hinkley. By considerably under-estimating the costs of these measures, the company can appear to be financially sound.
What responsible government would even entertain for one minute
allowing such an apparently unstable company, with no ability to
indemnify failures - other than the good will of the French government -
to take on one of the largest nuclear developments in the world?
Then there is Toshiba's financial fiasco, which has caused it to drop
out of the Moorside project. Back in July, 2015, Hisao
Tanaka, Toshiba's Chief Executive Officer, announced his resignation in
the face of an accounting scandal tied to about $1.2 billion in
overstated operating profits. Interestingly for the
conspiracy theorists, on his way back from Japan a short while earlier,
George Osborne, then Chancellor of the Exchequer, called in to see
South Korean policitians to try to tempt them to contribute to nuclear
development in the U.K. This might prove interesting, as
South Korea's president, Moon Jae-in, has said he would lead his
country towards a ‘nuclear-free era’ following fears of a
Fukushima-style meltdown.
Ref.: https://www.theguardian.com/world/2017/jun/19/new-south-korean-president-vows-to-end-use-of-nuclear-power
However, did Osborne know way back then about Toshiba's
forthcoming problems?
Even so, how does this reflect on the integrity of
the company. Given the high levels of responsiblility required
to run a nuclear plant, do they meet the requisite standards for "due
diligence"?
Matt Ridley’s appraisal of the nuclear industry in The Times
(“Britain’s Energy Policy Keeps Picking Losers”,
Comment, 31/7/17), concluded that"the future of nuclear – if it
has one - may better lie in smaller nuclear power station".
So why not move the proposed locations away from Hinkley, Bradwell,
Wylfa, Moorside, et al, to nearer where the electricity is required -
to, say, London?
The nuclear industry has long survived on broken promises and failed experiments.
For some considerable time we have asked whether the secondment of Électricité de
France
staff to government departments, such as DECC, unduly influenced the
deal? Certainly the Audit Committee seem to think so. Why
has it not changed anything?
As Ridley said in the article referred to above, "Nuclear is an obsolete industry". With the emphasis
now on trying to clean up the mess produced over the few decades of
generation - using a highly costly process that involves finding a
remote spot and burying the waste in a hole, in the hope that it
doesn’t leak out.
Sellafield ceased production of electricity over 14 years ago but still costs £1½
billion a year to effect a clean-up. Projected overall
costs being over £70 billion and rising. What then
was the true cost of the power generated? Certainly it
would be dear enough to meter.
Professor Andy Blowers, in his book, "The Legacy of Nuclear Power"
(ISBN 978-0-415-86999-7, Routledge), seems to arrive at the same
conclusion, pointing out that the emphasis now is on phasing out
new-build power stations and concentrating on finding a way to disperse
the waste, both legacy and current.
In America, some have seen the future folly. Scana
Corporation subsidiary South Carolina Electric & Gas (SCG&E)
has announced its decision to cease construction of two AP1000
reactors at VC Summer. The announcement followed co-owner
Santee Cooper's decision to suspend construction because of projected
completion delays and cost overruns. Scana is to file for
regulatory permission to abandon the project.
Near Augusta, in Georgia, Georgia Power estimates that the net
additional required to complete the two AP1000s under construction at
their Vogtle plant will be $1.0-1.7 billion. It
expects to make its recommendations on whether or not to proceed with
the project to the Georgia Public Service Commission (PSC) later this
month.
Ref.: http://world-nuclear-news.org/NN-US-nuclear-construction-project-to-be-abandoned-0108177.html
Waste is a major problem everywhere nuclear power has been
pursued. In France, the idea is to dig a hole in a remote
area, Bure, and shove everything in there. Very similar to
what everyone else is doing around the world, with scant regard to the
future generations who will have to live with the consequences and
escalating risks of leakage and difficulty in retrieval should a safer
method of disposal be discovered.
Why is it necessary to involve foreign powers to produce one of
the most important resources for the country? The future
may well be electric, but who will control its supply?
Meanwhile, Fukushima continues to rumble on: a one metre hole has
been found in the floor of the container verssel for one reactor, amid
some of the highest levels of radiation recorded at the site.
Ref.: https://www.theguardian.com/environment/2017/feb/03/fukushima-daiichi-radiation-levels-highest-since-2011-meltdown
8/8/17
In Limbo in The Moorside
The fate of the Moorside in
Cumbria lies in abeyance. Despite Toshiba's troubles and the
financial and logical uncertainty around the place, those whose
properties were threatened by the new development remain unrecompensed
and unable to move away as, let's face it, who would want to buy a
house that was going to be compulsorily purchased, or whose outlook
would be the massive barbed wire fences that inevitably surround
nuclear sites, or whose home is in a road continually patrolled by
highly armed nuclear policemen? From the initial announcement of
RWE's plans and
the subsequent statements about the National Infrastructure Policy,
properties around the
Calder Bridge, Beckermet, and Braystones communitites have been
subjected
to what is politely termed "planning blight".
In October, last year the UK Government announced its support for
expansion at Heathrow as its preferred option for new airport capacity.
It further stated that it plans to extend its
property compensation scheme should an additional runway be built at
the airport. In May, the airport announced plans for 25% above
market value compensation for 750 homes that would be subject to
compulsory purchase.
Re.: http://your.heathrow.com/newpropertycompensation/
See also: http://assets.hs2.org.uk/sites/default/files/consulation_library/pdf/Safeguarding%20Guide%20to%20Statutory%20Blight.pdf
What moves have been made to compensate those afflicted by the blight
in Cumbria?
Whether the project goes ahead or not (and the latter
seemingly increasingly likely), there will remain the prospect of the
plant being resurrected at any point in the future, rendering these
unfortunate properties virtually unsaleable at any time on the normal market.. At present we have
managed to find only scant government document about planning blight.
The roads document is relevant only to those whose houses are in the way of
highway changes and the owner must have endeavoured to sell their
property before serving a notice on the Highways Department, but it is assumed that similar schemes pertains to National
Infrastructure proposals.
Source: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/499282/Your_property_and_our_road_blight_Digital__.pdf
Given the difficulties for lay persons to get to grips with such
esoteric schemes as these, is it expecting too much for a helping hand
from the politicians who created this mess? Should they not have
started the initiative immediately the affected areas were announced,
as part of their duty to support their constituency?
Toshiba may well be in a mess, but there is no reason why ordinary citizens of Cumbria should be required to suffer as a result.
15/2/17
Toshiba's Troubles Affect Moorside
Virtually every news service has
carried the news
that Toshiba has such problems with its finances that it is having to
sell major assets to cover the losses. Just a one year ago, the
company was in trouble after over-stating its profits by £780
million. Not exactly the sort of mistake that occurs
accidentally. Those problems were compounded by an unfortunate
venture involving the Westinghouse subsidiary in America and the
acquisition of a construction company are allegedly at the root of
their current problems. Toshiba are to defer publishing their
accounts for a
month, but the initial news articles put the losses at over £5
billion. However, in his resignation speech, the chairman has
hinted that the losses may even exceed
that.
Due Diligence?
Today Toshiba has announced that it will
sell its shares in NuGen - something it "always meant to do" (yeah,
right) - and will take no part in the construction of Moorside,
although it will happily supply the reactors and turbines. The
government are now in a total
mess, as this was to be one of their flagship projects. When
multi-national companies can find themselves in such accounting messes,
one has to wonder what due diligence processes have been undertaken and
how anyone can now be willing to take over Toshiba's role.
Local Glee
Wouldn't it be nice if the will of the local people were to be accepted
and the whole project consigned to the annals of history? All we
can say is YIPPEEE! Thanks for the reprieve.
On Time and Under Budget?
The financial arrangements to build Moorside were due to be completed
by 2018, and the plant running by 2025. Both deadlines now look
to be unachievable. Despite all the obvious reasons why nuclear
is stupid, our illustrious leaders say that they will "work closely to
see Moorside built". Like Hinkley, it seems the only way that
that will happen is if the U.K. taxpayer foots the bill, as it already
does with Sellafield and insurance matters for the industry.
Some risk!
Toshiba achieved contracts to build four reactors in the U.S.A.:
two at Vogtle, in Georgia, and two more at Virgil C Summer, in
South Carolina, but their contractor was a company called Shaw.
This company had taken over Stone and Webster, which apparently had the
necessary expertise to complete the project. Shaw was sold to
Chicago Bridge and Iron in 2012, after problems arose with delays, some
of which were the result of the regulators requiring changes to the
AP1000 design. (Sounds familiar!) Eventually, Toshiba
bought Stone and Webster from Chicago Bridge and Iron for £184
million after timetables slipped and costs escalated. By this
time, Toshiba itself would become liable for cost over-runs. The
idea was damage limitation, but it soon became clear that the costs and
liabilities of Stone and Webster were far higher than had been stated.
Then it started to get messy, with Toshiba and Chicago Bridge
and Iron becoming involved in a legal dispute. In the meantime,
labour and equipment costs escalated. Of course, that would not
happen in this country.
Chicago Bridge and Iron's view is that the AP1000 design is partly to
blame. As these are the same designs which were supposed to be
constructed at Moorside, this may not be good news. If the
designs still have flaws, which seem to be acknowledged by all
concerned, why have Toshiba started construction? It is akin to
Ford designing a sports car but not checking that it has suitable tyres
and brakes before it goes on sale. However, we have
concerns that, should the Moorside project still go ahead, the losses
sustained by Toshiba may be passed on to the U.K. consumer. With
Électricité de
France's prices already sky high, electricity will become almost unaffordable.
Still, this pattern of tardiness and cost over-runs seems to be endemic
in all nuclear builds - especially those projects backed by the
government.
Not So Smart
Électricité de
France's profits have dropped by 6.7% this year. This is despite
the "highest ever output" in 2016. The company also lost 80,000
customers compared to 2015. To add to its woes, it had to report
a £66 million "sritedown" (isn't corporate-speak a truly wondrous
thing?) in the U.K. due to "the reduction in the value of gas storage
assets." Even in its home market, the generation and supply
business reported a drop of 11.2%. Ain't that sad?
11/2/17
Explosion in the Powerhouse of the future
An amusing article from The Times, Friday, 10/2/17,
by Alistair Osborne, points out that the Électricité de
France fiasco that is Flamanville is now six years late and €7
billion over budget. The article goes on to report a
little-publicised blast that occurred in the turbine hall of an earlier
set of reactors, built on the same site in the 1980s.
Despite the seriousness of such incidents, it is always difficult to
suppress smirks when the time-honoured phrases are trotted out:
"There was no radiation leak and no-one was hurt." The
publicists must be so pleased at the mileage that classic little line
has acquired over the years. It has been announced at the
earliest opportunity after every nuclear event, except Hiroshima and
Nagasaki.
Osborne continues: "Yet
barely a month goes by without a fresh insight into
Électricité de France’s nuclear prowess: a safety
probe into its French reactors, resulting in shutdowns at some its
58-strong fleet; news that staff at Areva, the nuclear design outfit
partly rescued by Électricité de France, might have
doctored quality assurance records. And still to come? The French
nuclear watchdog’s ruling on whether the new Flamanville plant is
actually safe after carbon spots were found on the reactor’s
steel.
Anyway,
that’s the exciting tech Theresa May is bringing to Britain,
forcing consumers to pay twice the present wholesale electricity price
for 35 years. Totally mind-blowing."
Those carbon spots are weaknesses in the material
and have been detected in the main reactor body. They could
lead to sudden and catastrophic cracking of the vessel.
Amusingly, on the day that the tidal lagoon backers suggest that the
cost of electricity produced their way should be nearly four times that
currently produced and twice that proposed by the likes of Hinkley,
several of the large suppliers have announced price rises to the
consumer of around 10%. There is still some way to go
before any of the mooted, allegedly low-carbon methods of generation
can even seem to be viable. As we pointed out many years
ago, the only way to make nuclear power seem anything like viable is
for all energy prices to rise until such time as they match those
proposed by the new systems. Fuel poverty is running at
10.6% in the U.K. and domestic energy prices have risen by 260% in the
period between 2003 and 2014.
(Source: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/557400/Annual_Fuel_Poverty_Statistics_Report_2016_-_revised_30.09.2016.pdf)
Quite how anyone will be able to afford their product in the long-term is difficult to imagine.
The somewhat amusing fiasco of diesel-powered road
vehicles - where the government of the day decided (without any
lobbying from oil companies, naturally!) that diesel engines produced
far less pollution and were more economical than petrol
engines.
Unchanged by subsequent governments, the policy
continued until very recent times. Subsidies for diesel
cars offset the slightly greater cost of producing their engines, and
fuel was taxed at a lower level. Then someone pointed out
the damage done to the environment - including humans - by the very
fine particles discharged. So the official policy-makers
have done a volte face. Diesel fuel now costs more than
petrol, and taxes complete the economical persuasion. It is
now rumoured that to avoid further embarassment, a vehicle scrappage
allowance is being considered, whereby owners of diesel vehicles will
receive a bonus for scrapping it. Seems like a recipe for
abuse to us.
However, the push for electric vehicles is now
flavour of the month. Better performance, no charges for
diesel, gas, or petrol, no damage to the environment by pollutant
discharges, lower taxes, etc. What no-one seems to
have realised is that the electricity used to power these vehicles will
have to come from a power station somewhere. The current
trend for closing down power stations will exacerbate this promotion of
electricity usage. Someone has worked out that, if the
promotion works and Joe Public really latches on, there will be
insufficient capacity on the grid to recharge all these
vehicles. The scenario suggests that something like 20
nuclear power stations will be required to provide the
short-fall. What a brilliant job the nuclear industry has
done to put us in this position; where carbon dioxide is
conceived to be more important than the toxic materials they produce at
such great risk, with no means of disposing of the wastes safely,
despite it remaining toxic for thousands of years. What a
legacy to leave to our progeny! Isn't the basic idea of
life to do no harm and to leave the planet (at least) no worse off than
when you arrived?
The future of electrical supply is
intriguing. We have a vague uneasiness about the approval
this week of the cross-channel link between the U.K. national grid and
its French counterpart, RTE. Such are the problems of
France's nuclear power stations, that by the end of 2016, the U.K. was
a net exporter of electricity to France. Could the future
entail large numbers of nuclear power stations in the U.K., with all
the associated problems of risk and waste-disposal, while France and
the rest of Europe utilise the electricity we produce?
Effectively making the U.K. Europe's boilerhouse. How
convenient that would be for the countries averse to nuclear generation
on their own doorstep.
7/2/17
More Pieces for the Jigsaw & Chinese Puzzles
We are quite open
and honest about our disrespect for politicians, almost all of whom
seem far more concerned with their personal fortune, closely followed
by
party loyalty, than they do about working for their constituents or the
greater good of the nation. This is evidenced by the complete
disregard of local wishes when considering developments including
nuclear, power distribution cables, mining and gas extraction.
In the case of Moorside it is our understanding that the majority of
residents in the area and in in Cumbria are against any further
development.
Friends in High Places
We believe that the
arguments about nuclear expansion - if viewed from an unbiased
perspective - would cause the whole policy to be halted.
The history of MPs who have been involved in the Energy Department is
singularly unattractive, with dishonesty, lack of integrity, and use of
the so-called revolving door - where highly paid and attractive work is
found for those politicians and staff who have helped the industry at
an appropriate juncture - well to the fore.
On 4/2/17, The Times related the story of the
connection between Barry Gardiner, M.P. for Brent North, and a law
firm, Christine Lee and Co. The article states that the
company acts as a legal adviser to the Chinese embassy.
There is no suggestion of impropriety, it continues. Which
leads to the question, why then is it such a newsworthy
story? According to The Times, Mr. Gardiner, who has
declared receiving more than £180,000 and employs Ms. Lee's son
as a researcher, has generally taken a pro-Beijing stance and has
spoken in favour of Hinkley's development which, of course, will
necessitate Chinese investment. The Chinese also wish to
build power stations of their own designs at Bradwell.
Whatever the reasoning, the arrangement is surely open to criticism, or are we expecting too much?
Over many years now, we have been asked to believe
that the secondment of staff from major commercial concerns is entirely
innocent and the best possible arrangement for the public
benefit. Mike Weightman's report
on future difficulties in staffing the ONR was obviously
accurate. Even the Civil Nuclear emergency planning advisor
at DECC was an Électricité de France
secondee. In just two years 49 secondees were used by DECC,
many from the nuclear or nuclear-related construction
industry. Happily, we can be assured that every one of
these individuals was solely interested in giving impartial assistance
to DECC and would never have been tempted to report any information of
interest gained during their secondment to their main employer, nor
would they ever attempt to influence policy-making.
Another major contributor of secondees has been the
Carbon Trust, which promotes itself as "an independent, expert partner
of leading organisations around the world, helping them contribute to
and benefit from a more sustainable future through carbon reduction,
resource efficiency strategies and commercialising low carbon
technologies." How useful it could have been to have staff
making suggestions that would ultimately benefit the company directly
to those responsible for the policies that affect their business, and
how lucky we are that every individual’s integrity would prevent
such actions!
It does remain our opinion that the civil servants
in DECC should be, and appear to be, sufficiently competent to acquire
any necessary information and act on it, whilst keeping at arm's length
any actions which could lead to public perception of a lack of
integrity. Basically, to do their job.
The main claim of benefit for nuclear development is
that it is low carbon. We express our views on that claim
elsewhere on this website and have always asked whether the pollution
produced by nuclear sites is in any way better than CO2 production,
noting in the process that the carbon dioxide component of the
atmosphere at only 0.04% means that it is only a trace gas.
Many scientists believe that it is highly unlikely that slight changes
to this level will be responsible for global warming.
There is a prediction that sun-spot activity is set
to diminish over the next few years, from its current peak.
The last period when there was similar low activity coincided with a
period of global cooling. It will be interesting to see how
the "experts" cope with any extension to the current 17 year period of
cooling. We have no truck with Trump, but do believe that
it is well past time that climate change science be examined more
closely and with a view to the entire global history, which has seen
parts of the U.K. range from tropical to polar in times well beyond the
industrial age’s influence. There are some interesting and
illuminating views to be found in an article in The Times of the
6/2/17, in an article by Matt Ridley entitled, "Politics and science
are a toxic combination". http://www.thetimes.co.uk/article/politics-and-science-are-a-toxic-combination-706jm3hqv?shareToken=ddcc048eb318cd97939cf8dbd4049978
Several years ago, when dealing with RWE's bid to
demolish Braystones, we pointed out that one of the mainstays used,
viz. that of "keeping the lights on" was unfounded. We were
gratified when the head of the National Grid at the time agreed, saying
there was no reason whatsoever for the lights to go out.
This didn't put an end to the threat and it is still used
today. Despite attempts to perpetuate the myth by the likes
of the Guardian, Ofgen has once again categorically stated that the
lights will not go out, and that the spare capacity in the worst-case
scenario is 1.2%, with plans in place to increase that to 6.6% if
necessary.
On 28/1/17, The Sunday Times advises us that
"Toshiba meltdown puts nuclear project at risk". Toshiba
managers have already said that they wish to get out of building
nuclear plant building to concentrate on design and manufacture of
reactors, and will "review the future of nuclear businesses outside
Japan".
Meanwhile, in France, our old friends
Électricité de France are reported to have insufficient
cash to dismantle its domestic reactors. Over the next
three years, Électricité de France is planning on cutting
nearly 4,000 jobs. The company is also said to be facing a
choice between privatisation and bankruptcy.
With the two major companies each struggling already
to even contemplate building in the U.K. there is obviously no leeway
for problems at any stage, and, as the insurer is the U.K. taxpayer . .
.
Would you buy anything from a company that is
apparently so insecure – or rumoured to be so, or so close to
bankruptcy, when your commitment to, and reliance on, them will endure
for at least half a century?
Many moons ago we suggested that the Chinese are
happy to make appreciative and positive murmurings when approached for
finance for major projects. Where the Chinese state is
involved, however, there seems to be a requirement for employment,
equipment and materials to be Chinese, too. How will this
work at Hinkley or other sites where the Chinese are supposedly to be
involved?
Although the love affair between China and the U.K.
are said to be cooling, our Prime Minister is once again off to see
what she can do.
4/2/17
Euratom Departure
Some sources have expressed concern about the problems with regulation
of the nuclear industry once we have left the Euratom
partnership.
At the Moorside site, literally across the road from Sellafield in
Cumbria, the proposal is for a company reported as having “debts
greater than its assets”; whose previous chairman had to
resign following an accounting scandal to the tune of £782
million; which cannot afford to finance, let alone insure, the
project, to build three reactors of questionable design safety on a 500
acre green-field site adjacent to and clearly visible from a National
Park, on land designated as being a buffer zone for the most dangerous
chemical plant in the world, which was contaminated by the 1957
Sellafield fire, and is utterly without basic infra-structure
requirements.
The system proposed for Moorside has no secondary containment and will
need 2.5 billion gallons of Irish Sea water per day. The
area of the Irish Sea to be utilised for this is already heavily
contaminated with Sellafield's legacy discharges (deliberate and
accidental). The plan is to treat the water with biocides,
then return it to the environment after heating it to 14° above
intake temperature. The thermal equivalent of 6 Gigawatts
will be discharged into the sea (assuming an efficiency of
33%). The effects of this on the environment can only be
guessed at. NuGen do not know. Other proposed
plants elsewhere around the Irish Sea coast will exacerbate this.
U.K. government policy is that no new nuclear facility will be
permitted until such time as there is a clear method of treating the
waste and a site found for it. Neither requirement has been
met as yet.
We understand that the Euratom partnership was as much concerned with
assisting developers find funding as it was with regulation.
With regulators even considering this sort of development and a 2011
report by Dr. Weightman outlining, very clearly, the current and future
staffing difficulties (raising the spectre of the industry regulating
itself), will the loss of Euratom's regulation be of any import?
The Kinlen theory that population mixing causes the excess of leukemias
and other illnesses demonstrated in the local population, means that
the risks to west Cumbrians will increase dramatically as up to 15,000
in-comers* can be expected.
Presumably, if the radiation doesn't get us then the population mixing will.
Sadly, the regulators seem disinterested in the human side of their industry.
28/1/17
Editorial Up-date
Over
five years ago we obtained, under FOI rules, a copy of a report by Dr.
Mike Weightman, which assessed the vulnerability of the U.K.'s nuclear
establishments due to staff shortages and raised the spectre of the
industry assessing itself.
Following
Fukushima, Dr Weightman’s recommendations required a review of a
wide range of nuclear safety matters, including international and
national emergency response arrangements, public contingency planning,
communications and the review of flooding studies, site & plant
layouts, electricity & cooling supplies, multi reactor site
considerations, spent fuel strategies and dealing with prolonged
accidents. The interim report did not identify any
implications for the strategic siting assessment of new reactors.
A
subsequent publication of the report by the Department for Energy and
Climate Change, adds the comment from the industry's salesmen, the
I.A.E.A., that the U.K. has "a mature, transparent and independent
regulatory system, an advanced review process, and highly trained and
experienced nuclear inspectors". It also suggested that
Fukushima's problems could not be repeated in the U.K. as we do not
suffer from tsunami.
(https://www.gov.uk/government/news/dr-mike-weightmans-interim-report-japanese-earthquake-and-tsunami-implications-for-the-uk-nuclear-industry-written-ministerial-statement-by-the-rt-hon-chris-huhne-mp-18-may-2011)
There
were some obvious flaws in the basic premise that the scarcity of
natural phenomena meant the nuclear industry was safe. To
us, the main problem is a system failure occuring, regardless of the
cause. It matters not whether the failure is caused by a
very rare event or something unforseen. Any failure can
have disastrous consequences. Putting all (or at least a
large proportion of) the eggs in one basket, as is proposed by siting
the NuGen development within the safety zone of Sellafield, will merely
render those consequences more severe and difficult to deal with.
Unreported Errors
In an article on 27th
December, 2016, The Times reported that "Dozens of nuclear blunders"
had been ignored. 167 incidents were attributed to
Sellafield. It lists some of the blunders and points out
that the events should have been taken more seriously.
Weightman's report pointed out the staffing problems that were even
then developing, and were set to get worse very quickly. He
raised the spectre of the industry regulating itself. The
article suggested that this down-playing of the incidents' severity is
a result of the ONR's close ties to the industry, compromising the
latter's willingness to expose mistakes.
It has always been a concern of ours that Électricité
de France's
staff have been seconded to positions where they can influence
government policy, removing the impartiality that should exist within
government. The appointment of politicians, their relatives
and peers of the realm to various nuclear business boards further
endangers this impartiality. Only those with more than
adequate funds can approach the decision makers, it appears.
Last
July we wrote to HM the Queen, as owner of the coastal sea bed, asking
her to consider the impact of the proposed developments around
Sellafield. A reply advised that it had been passed to the
DBEIS for them to reply fully. It took nearly five months
for that to happen. When we received the response we noted
that it was full of errors, misleading statements and a recommendation
that we engage with NuGen. Having submitted, without
response, many tens of pages of consultation documents, we found this
suggestion somewhat aggravating. Our response to the writer
from the Ministerial Correspondence Unit included a critique of the
statements made in that letter, and a copy of the consultation document
relating to NuGen's proposals illustrating our concerns.
Shortly after, a reply was received from the head of the Correspondence
Unit telling us politely to go away. She added that no
further consideration would be given to anything we wrote and that
there was nothing that could be done to change ministerial
policy. Strange thing this democracy, isn't it?
Legitimate concerns can be fobbed off and only those able to offer
inducements to individuals allowed to change policies which are
obviously flawed and unsafe.
One
professor mentioned in The Times article is quoted as saying that the
ONR seems to take an approach to INS classification (the scale of
seriousness of nuclear-related incidents) that suits its interests.
In March, 2017, the industry is set to have an even greater influence in its own regulation. How many Électricité
de France
staff will be involved in this? Greenpeace say that their
legal challenge to nuclear development in papers lodged with the U.K.
government were passed to the Nuclear Industry Association.
Surely that is further evidence of an unhealthy relationship?
A Nuclear Cloud?
The
Times of 27/1/17 points out the low-key announcement that withdrawing
from the EU also entails withdrawing from the Euratom
organisation. Mainly a body concerned with promoting
nuclear expansion, its role also includes assisting developers to find
funding, and has a hand in nuclear regulation. The
withdrawal will have serious repercussions on the proposed expansion in
the U.K. It is seeming increasingly likely that the U.K.
taxpayer is going to have to pay for any development
themselves. Quite whether this can be considered sensible
or not is a moot point, but otherwise where does it leave Électricité
de France and Toshiba.
The
latter company has been reported as having liabilities greater than its
assets in various blogs, following shenanigans in America.
Since Électricité
de France
also have considerable debts (around €38 billion at the last
count) and is responsible for an aging and vulnerable array of nuclear
reactors around France, should the U.K. be involving either of the
companies in such a major undertaking? If a company has no
assets, how can it offer any kind of security or guarantee of its
workmanship? Safety and quality are often the first
casualties as corners are cut.
Neither
of these companies has a good record. In 2015, Toshiba had
to admit that it had been overstating its profits for years and had to
announce a loss of £4.7 billion. Recent events involving Électricité
de
France - another company with huge debts - have revealed falsification of safety records, which resulted in
a number of reactor vessels having to be examined for weaknesses.
Time to call it a day for nuclear expansion? We think so.
Switch Away From Using Électricité
de France
As part of the Stop Hinkley campaign, the Green Party on the Mendip
council have commenced action to persuade people to switch from
using Électricité
de France and pick up £40 for doing so. See http://switchÉlectricité de Franceoff.org.uk/
25/7/16
Response to NuGen's Consultation Process, Stage 2.
Not
one of the points we raised has been answered, nor has any attempt been
made to contradict anything we have said in our document.
We
may have been absent for a few weeks, but we haven't been idle.
We have spent all the time researching, typing, and proof-reading a
comprehensive document to rebut the assertions in NuGen's literature,
especially the bits that say residents are in favour of their
"Moorside" project.
How can anyone even
contemplate building an intrinsically dangerous factory in the buffer
zone of Sellafield - itself denounced as being an unacceptable risk? It
is tantamount to building a match factory alongside an oil refinery.
Despite the obvious link between the "Moorside" and Sellafield
sites, NuGen insist that they don't do anything like what Sellafield
does - except us radioactive materials, lots of natural resources,
pollute the environment, turn beautiful natural countryside into huge
industrial estates, destroying wildlife and people's amenity, etc.
Not the same thing at all . . . Or is it?
A buffer zone is
required round Sellafield in order to provide basic safety to residents
and the environment in
the event of an "incident" occurring, perhaps as a result of something
happening as a result of the "unacceptable risk" as identified by the
Select Committee. The buffer zone was not intended to be a
planning opportunity. Should the NDA have accepted £70
million for the land instead of preserving it for its proper function?
The NDA are prohibited from promoting nuclear development, but
is this not what they have done? Where is the buffer zone now?
How have Copeland Council covered the damage to Beckermet and,
in particular, the setting of the 11th century listed building St.
Bridget's Church?
The submission made in July, 2016, can be found here.
The Submission made in July, 2015, can be found here.
For those who can't be bothered to read so much, a two-page summary of some of the salient points can be found here.
(It is a copy of a letter sent to the Whitehaven News, and was published by them on 11/8/16)
A
very good analysis of the impact of borehole drilling around the
proposed NuGen site has been drawn to our attention. It can be
found on page 15 of this document:
http://www.copeland.gov.uk/sites/default/files/attachments/record_of_correspondence.pdf
Sadly, the authorities have no objection so far to this huge development in the "Safeguarding Zone" of Sellafield.
24/11/16
Steel a Cast Iron Case
According to a Times article today, the much-vaunted electricity supply for France under the auspices of our great friend, Électricité
de France, who are the world's greatest and most knowledgeable of
nuclear companies - leastways according to them and their hired
supporters, is under threat. Despite the U.K. being consistently
assured that nuclear generation is "tried and tested" and very safe,
with the highest possible safety standards, it now appears that those
standards may not have been applied during construction of some of
their designs. The detected faults at the Flamanville site have
now spread to other reactors of the same design. Put simply, the
composition of the steel for the reactor vessel has been compromised,
leading to the potential for patches of the vessel to become brittle
and crack. According to the Times article, "excessive carbon
concentration in the steel" has weakened it. Cracks of this
nature can appear very suddenly and, even more concerning, equally
rapidly give way, splitting the entire containment vessel and spilling
the contents.
One
of the many problems of nuclear construction is, of course, the
limited availability for specialist metals, with few sources available,
something which we noted long ago when objecting to RWE's designs for
Braystones. If the flaws are present in so many French reactors,
how can anyone be assured that the same design at Hinkley will be free
from defect? Yet this is a design that is allegedly much safer
and incorporates more fail-safe features than the AP1000 reactors
proposed by NuGen for Moorside. It is widely accepted that any
breach of the containment vessel (which of course cannot possibly
happen!) will result in widespread dispersal of highly-radioactive
materials to the atmosphere. If you have any views on this
please send them to New.Reactor-Build@onr.gov.uk The consultation ends on 30/11/16, apparently.
We
thank Radiation Free Lakeland for the link to this consultation which
seems not to exist elsewhere. We could find nothing on the ONR's
website, which currently states:

Elsewhere on their site the ONR profess openness and favours public engagement.
|
29/10/16
Signs of The Times
All establishment eyes remain firmly on Électricité
de France's venture at Hinkley, thus averting them from the Moorside
site in Cumbria. That the cost of nuclear - financially and
to the environment - far exceed any benefits, still seems not to be
apparent to the decision makers. Why?
One of the most over-looked points concerns the disposal of nuclear
waste. No method has yet been devised and no facility
constructed, yet those in favour of nuclear expansion happily ignore
the points. We point out elsewhere that the Met. Office's
forecasts for three or more days are rarely accurate, yet pro-nuclear
propaganda would have us believe that forecasts for half a century and
beyond can be accurate, thus enabling them to predict with certainty
that the necessary method and facilities will be available to deal with
the more concentrated wastes that the proposed reactors will
produce. This ability will also allow the government to
predict the cost of disposal - allegedly.
Looking at the escalating costs of "cleaning up" Sellafield (in reality
just moving it somewhere else - usually burying it - or attempting to
dilute it, or giving up on it and just storing on-site), demonstrates the fallacy. Sadly, once a course
has been decided on, loss of face prevents a change of course,
regardless of the wisdom and science. Moreover, why would
any company, such as Sellafield, Électricité de France,
NuGen, or any of the multi-national construction companies, wish to
kill the goose that lays the golden egg?
In past articles we have also asked how many of the peers and
politicians involved in these schemes will benefit in some way from the
plans they are judging. From our admittedly jaundiced
viewpoint, most of those influential figures are keen to enhance their
own personal fortunes, rather than properly consider and balance
arguments. Of course, this is not confined to nuclear
expansion.
The decision to go ahead with Heathrow's third runway has been at least
partially based on an independent enquiry chaired by Sir Howard
Davies. Having considered the evidence over three years
from 2012, he
finally advocated Heathrow as the only choice. In 2009, Sir
Howard became an advisor to the Investment Strategy Committee of GIC
Private Ltd., later he joined its International Advisory
Board. He resigned from those positions on his appointment
to the chair of the Airports Commission, as GIC Private is a part-owner
of Heathrow Airport. Investments are, of course, long-term
future commitments. On 27/10/16, The Times carried a front
page article about Heathrow expansion being over-valued by £86
billion, as "figures had been incorrect". One wonders how
anyone with financial expertise such as is properly required and no
less than we should expect for such judgements, could have over-looked
erroneous figures of this magnitude.
Private Eye, in issue 1429, illustrates how the level fields can be
tilted to achieve any desired outcome. In an article
entitled "Nuclear Clean-up" the composition of the ostensibly
independent body, Nuclear Liabilities Financing Assurance Board is
examined. As usual the big money advisors, in this case
KPMG, are apparent. The article points out that KPMG have a
vested interest in the outcome of any decision regarding Hinkley, as
Électricité de France are multi-million euro clients of
theirs. A lawyer from Allen and Overy - a company which has
just advised British Energy (also owned by Électricité de
France) on a £10 billion plant on Anglesey, together with a
director from Babcock Engineering, are also on the board.
Babcock was named preferred bidder to supply the pipework and support
structures at Hinkley, so they will patently be independent.
More on Babcock can be seen below: "Something Nasty Which Leaves
a Fishy Smell".
The
Times, despite several prompts, continues to ignore Cumbria's
plans. Its correspondent, Ben Webster, in an article on
14/10/16 entitled, "Solar panels work properly only on nine days a
year", managed to ignore the disadvantages of nuclear while also using
flawed reporting to attack solar power installations. He
went on to suggest that nuclear power stations could be accommodated on
a one acre site. If this were truly the case, why is NuGen
taking over 500 acres of greenfield site in Sellafield's buffer
zone? No mention is made in the article of the cost and
method of any waste disposal, nor the environmental or infra-structure
issues that pertain to nuclear development.
The
National Grid are offering yet another consultation on pylons and
associated infra-structure, having conceded that some of the cabling to
distribute power from the proposed Moorside development must go
underground. It's almost as if they are expecting a pat on
the head for being good. Rather that they answer the
question of why they are pressing ahead before any final commitment has
been made to go ahead with Moorside. As with the airports
and Hinkley, it seems that if infra-structure arguments can be overcome
by going ahead before decisions on the main event have become final,
those making the final decision will be swayed. After all,
nobody likes to lose face, least of all politicians. We still
find it somewhat amusing and simultaneously galling, to see BBC news
items featuring reporters interviewing local people around the Duddon
estuary who are upset about the proposed power-lines. Firstly,
they seem not to have twigged that one set of lines will not be
sufficient, and secondly, whilst objecting to a lesser feature of the
nuclear expansion plans, they do not see the elephant in the room.
Without the hideous Moorside development there would be no power
lines. Can they not object to both?
One wonders, too, about the effects of the electromagnetic fields which
surround such power lines. Their effect on health and the
environment is not mentioned anywhere in the literature we have seen.
We believe it should not be possible to build these lines close
to communities. It is known that high voltage power lines,
together with substations and ancillary equipment, can affect people
and the environment, in the same way that cell phone masts can.
Radiation-Free Lakeland are hoping to commission a report into the
design of the AP1000 reactors. If you would like to contribute
you can donate by going to: https://www.justgiving.com/crowdfunding/marianne-birkby If you prefer, you can just send her a message via her website: https://mariannewildart.wordpress.com
Radiation-Free Lakeland are also advocating that objectors to the
Moorside scheme write to the Chief Executive Officer of Engie, to
suggest she follows up on her own statement that the future of
electricity generation belongs with renewables. The address to
write to with your objections is: http://engie-globalenergy.com/contact
The statement was reported as under: "Lacking in Engie?"
The much vaunted, leastways by Électricité de France,
reliability of the French nuclear generators is somewhat undermined by
the fact that currently 19 of their reactors are off-line, while a
further 12 are to follow suit. 2016 figures show that Areva has debts of €5.8 billion, and Électricité de France €39 billion. Small wonder they want the business.
|
29/10/16
Lacking in Engie?
On 28/10/16, Engie Chief Executive Officer Isabelle Kocher told reporters that, "Nuclear is and will remain an important element of our strategy."
However, she went on to add that, "There
was less room now for nuclear power than there was 20 years ago as
other technologies had emerged and were increasingly competitive." Acknowledging the recent rapid improvements in storage technology, she said that, "In
some cases it is better to install renewables with batteries, but that
in some countries nuclear will probably remain necessary in the energy
mix".
Engie
has a 40 percent stake in the Toshiba-led NuGen consortium to build the
three Westinghouse AP 1000 nuclear reactors at the Moorside site.
Intriguingly, Kocher said Engie was far from taking investment decisions on its British and Turkish projects.
Presumably, if enough objections were raised then it may be
possible to dissuade the company from going ahead. Decisions
were expected
in 2018 for the proposed Moorside development, but "Could be
sooner if it becomes clear that the regulatory context and market
environment are not favourable," she said. The final, somewhat
negative-looking, statement is somewhat heartening for those who oppose
the proposals.
Source: https://uk.news.yahoo.com/nuclear-remain-part-engie-strategy-152034102.html |
"Even without the link to nuclear proliferation, nuclear power carries
dangers of a magnitude that we ought not to accept. There is
something profoundly stupid about continuing to multiply a series of
engineering marvels that contain fifteen billion curies of radiation.
We do not know enough about radiation and cannot be sure enough
of our technical prowess to allow this system to dominate our energy
supply. Moreover, the instinctive fear of radioactivity is not
irrational, as the nuclear advocates assert; it is also so
universal and so enduring that it is a political fact of life."
from "The Nuclear Barons" by Peter Pringle and James Spigelman
ISBN 0-7221-7029-7
|
7/9/16
Panoramic View
The
BBC screened a very interesting programme about safety at Sellafield on
Monday, 5/9/16. The Panorama programme investigated the site
and, it has to be said, came out with some very troubling information.
Needless to say, Sellafield's supporters could see nothing
wrong. More worrying is that John Clark, Chief Executive of the
NDA, seemed to dispute the evidence presented, not just by the
programme but in official government reports. The Health and
Safety manager was particularly lack-lustre, and could only counter the
evidence with repeated statements that the matters raised are being
attended to. He seemed to be unable to see that his job was not
just to deal with dangerous situations after
they had arisen, but to prevent them happening in the first place.
A good example of this being the storage, in plastic bottles, of
uranium and plutonium, which had been placed in a fume cupboard.
It seems they are now degrading and pose quite a danger. How
could so many bottles of such dangerous material have been stored like
this in the first place, and was it not the job of managers -
especially health and safety managers - to put a stop to the practise?
The overwhelming number of alarms was almost amusing. How long
before an alarm is merely reset when it is indicating a real and serious
danger? How many times can any alarm just be reset before more
intelligent action is taken? Wasn't there something similar in
the Three Mile Island event? (Of course, that couldn't happen in
Sellafield - until it does.)
An article in The Ecologist reports that the Chief Security Officer for the site has sent a memo round,
reminding people of the requirement for secrecy and complains that the
release to the press of photographs of the various areas of concern did
not comply with the official process for communicating with the press.
It almost seems as if worries about outside people being made
aware of the parlous state of the plant is of more concern than is the
dangerous state of the plant. It fits with the political
attitude in Cumbria: don't less the press or the anti-nuclear
people know anything detrimental about nuclear. Yes, it may be
cracking up and in danger of leaking, or catching fire; it may
create a radioactive plume which will cause mayhem across the north of
England and Western Europe, but do not tell anyone. Have they
never heard the phrase "prevention is better than cure"? Who
allowed these problems to even start, never mind develop to their
current level? Why are those people still around to deny things
are dangerous, and promising - yet again - that all is well and these
minor irritations are being dealt with? Just as importantly:
How can anyone be allowed to build nuclear reactors immediately alongside this plant?
Ref. http://www.theecologist.org/News/news_analysis/2611216/leaked_sellafield_photos_reveal_massive_radioactive_release_threat.html
|
9/9/16
Mushrooms and Ministers
We
are apolitical - our experiences and observations of politicians and
their "advisors" leave us particularly annoyed and amazed at the extent
to which self-interest and corruption can be tolerated in the allegedly
democratic system. Cameron arrived in office as Prime Minister
promising to deal with the massive influx of special advisors, pointing
out that they would be the next big scandal. Sadly, he did
nothing. The special advisors continue to peddle propaganda for
big industry and vested interests, most usually to the detriment of
truth and justice. Private Eye 1426 (2/9/16) contains six pages
of information about how Ministers, MPs and Civil Servants have taken
employment with companies with whom they have been dealing,
including making decisions on contracts, in the course of their
official rôle.
The
manner in which DECC and its ministers pushed for nuclear development
gave rise to considerable concern for us. When we started this
site the DECC minister was Chris. Huhne. We know now about his
honesty. Next up, (now Sir) Ed Davey, who left government to
work for a lobbying company, MHP Communications, who are the lobbying
firm for Électricité de France - a company who already has employees
seconded to the department! According to Private Eye, Davey was
responsible for "pushing a £20 billion (and rising) nuclear
contract whilst in office." There is, of course (!), no
suggestion of improper conduct, but neither is there any transparency.
By
a strange coincidence, linking to several other contemporary
stories, together with the Panorama programme we report elsewhere, Reuters report
that 'former Japanese Premier
Junichiro Koizumi has said that current Japanese Prime Minister Shinzo
Abe told a “lie” by downplaying the damage wrought by the
Fukushima nuclear accident, and claiming that the radioactivity
contaminating the site was “under control.”'
An additional report in The Times, 8/9/16, add that Mr. Koizumi
acknowledged that, as prime minister from 2001 to 2006, he supported
Japan's nuclear power programme but he said he now opposed it.
"I believed what the experts told me, that nuclear energy was safe", he
said.
The prime minister at the time of the disaster, Naoto Khan, attended
meetings in Anglesey last year to support those who were opposing the
Wylfa proposals. The company proposing to build were dismissive
of the opposition, saying that there was no chance of a tsunami
occuring on Anglesey - as if that were the sole cause of nuclear
accidents!
Ref.: http://www.itv.com/news/wales/story/2015-02-25/ex-leader-of-japan-calls-for-wylfa-nuclear-plant-plans-to-be-scrapped/
Fukushima has long-since passed out of U.K. news, even though it is
still continuing to pose serious problems for Japanese residents and the environment.
The abilities of the various nuclear factions to suppress
unwelcome news continues to amaze.
Of course, keeping things secret is one of the keys to nuclear
expansion and the habit started early, continuing to this day.
Many years ago, for example, Tony Benn, M.P., spoke in the House:
From Hansard: 5 Apr 2000 : Column 1000
"The
longer I served in Government – I was a Minister for 11 years
– the more I found that it was easy for people to confuse the
public interest with the convenience of Ministers. That is easy
to do; if it embarrasses Ministers, it cannot be in the public
interest – but in fact, it is not in the interest of Ministers.
The
real reason why I want to contribute to the debate is because of the
nuclear industry, for which I had responsibility for many years.
Recent events at Sellafield confirm what I learned by experience; even
as a Minister – let alone a Member of Parliament – I was
never told the truth by the nuclear industry. For example, I
found out about the fire at Windscale – now called Sellafield
– only when I visited Tokyo. My officials had never told
me about it. When I asked them why they had not done so, they
said, “It was before you were a Minister”.
When
the Americans discovered that there had been an explosion at Khysthm,
the major Soviet reprocessing plant, I was never told. I asked
the chairman of the Atomic Energy Authority, “Why didn’t
you tell me?” He replied, “We were told by the
Central Intelligence Agency not to tell British Ministers, because it
could create concern about the safety of nuclear power”.
It
was not until I left office that I discovered that, while I had been
making honest speeches about atoms for peace, all the plutonium from
our civil nuclear power stations was going to America to make the bomb.
The atoms for peace power stations were bomb factories for the
Pentagon. I felt affronted by that. Had people known the
facts at the time, the development of the debate on nuclear power and
the nuclear industry would have been much better informed. We
should not have had the problem at Sellafield, because the matter would
probably have been dealt with earlier."
From Hansard: Early Day Motion, 413
That
this House is deeply concerned by the hazards at Sellafield exposed by
the BBC's Panorama documentary, Sellafield's Nuclear Safety Failings;
notes that these failings include the storage of radioactive waste in
degrading plastic bottles and 97 incidents of staff shortages; further
notes with concern the potentially catastrophic damage that could be
caused by any leakage of nuclear waste; pays tribute to the work done
by the BBC and the whistleblowers at Sellafield; urges the Government
to establish an inquiry into improving security at Sellafield; further
urges the acceleration of the nuclear decommissioning program for
nuclear waste; and calls on the Government to avoid worsening the
situation with new nuclear developments at Moorside and Hinkley Point C.
The concerns expressed on the Panorama programme were obviously
notified to the Sellafield management in advance, so the usual
pro-nuclear support leap forward to its defence. (See the Facts page to see what was said by the various M.P.s)
The Minister for Climate Change and Industry (successor to DECC)
N. Hurd, M.P., issued a string of placating rhetoric, including the
best known, "everything at Sellafield is safe" - no doubt no animals
were hurt at any time, and there was no release of radioactive
materials, no danger to the public, etc. However, in one of the
most amusing paragraphs, he states that he has asked the regulators
whether Sellafield is safe. What does he expect them to say?
Can they possibly say no, but perhaps it is a little bit dangerous round the
edges, thereby acknowledging their failures? What of the reports
from Select Committees that were dismissed by the chief executive of
the NDA, Clark, who is obviously in a better position to see how safe
things are.
What is more concerning, however, is that Early Day Motion 413
only attracted seven signatures. Is this the result of apathy,
ignorance or idleness? Or do they not watch Panorama?
. . . and those photographs and videos, internal records, government
reports, etc.? Were they all faked? Were the American
company that was dismissed in April, merely spouting sour grapes?
Surely not! Despite the rebuttal of the programme's
logical findings, there was no rebuttal of individual components of the
evidence. Do we see yet more mushroom fodder for the
government?
Up-date
7/9/16
Elsewhere on this
site we question NuGen staff's assertion that there are identical
AP1000 reactors "safely and reliably up and running". It seems
that in Vogtle, Georgia, U.S.A. - a project which has so far taken
30 years and is still not complete - the costs are already above those
for Hinkley, standing at $900 million over the $14 billion budgeted for
the 2.2 GW development. It is also running 14 months late.
Pretty much on a par with all the other safe, reliable, reactors
from other manufacturers then?
http://www.theecologist.org/blogs_and_comments/commentators/2240101/toshibas_nuclear_project_cheaper_than_hinkley_c.html
1/9/16
Most things are continuing without too much ado. The Whitehaven
News continues its mainly pro-nuclear articles and "news" stories
provided by Sellafield, its supporters and the local and natrional
politicians. We find it very strange that Sellafield is still
credited with helping to support local causes and helping to build
educational facilities, provide equipment, etc. Yet Sellafield
does not earn a profit. On the contrary, it costs U.K. taxpayers
over £1,500,000,000 every year - increasing annually, of course
to enable the private companies involved to make hefty profits.
So, why does the press, particularly the Whitehaven News, which should
know better, persist in publishing these stories of Sellafield as a
great benefactor?
Elsewhere, the stories are of over 6 million visitors coming to the
Lake District. How many of them visited the coastal areas?
How much money could that tourism have contributed to the local
economy of Copeland and its associates?
The BBC managed to get stirred up enough to present a short article in
their North West Tonight programme about the objections of Millom
residents to having the pylons associated with "Moorside" striding
across their patch of land. It seems unlikely that they have yet
realised that one string of the pylons will be adequate to convey the
amount of power produced and include redundancy for faults. So a
miminum of two strings will be required, spaced a few miles apart.
Millom's answer is to bury the cables - without appearing to
consider the concept of not building "Moorside" at all.
Panorama, on Monday, 5th September, is to present an article
on the dangers of Sellafield's legacy wastes and the risks associated
therewith. Again, they seem to be missing the trick. How
can it possibly be safe to build three more highly risky reactors
literally just across the road from such a site as Sellafield.
As we said in our recent letter to the Whitehaven News - which they
published in full - the local councillors may be able to change the
Local Plans, but they can't make the situation safe or sensible by
doing so. Hopefully this view of the situation in Sellafield
will avoid the sanitised verson presented by Professor Jim al Khalili
the last time round.
Our letter to the Queen back at the beginning of July at last elicited
a response. We wrote suggesting that, as Her Majesty owned the
seabed around the U.K. coast, she could put a stop to the idea of power
companies digging ut up, tunneling under it, or bulding structures
thereon. As expected, the response says that Her Majesty cannot
get involved in state matters. Our letter was, however,
forwarded to various departments. Perhaps we should have sent
her the full response to the consultation document - maybe if it came
via H.M. Queen they would have bothered to read it? The copy we
sent to what used to be D.E.C.C. and is now D.B.E.I.S. merely elicited
the response that we were correct about NuGen's proposals to build in
Cumbria. However, as NuGen is a private consortium with private
financial means, it was nothing to do with D.B.E.I.S. Strange
when you think of the guarantees, etc., that are involved. We
believe that it is a lot to do with D.B.E.I.S.
The Times today has a very interesting article by Matt Ridley on the
truth behind climate change. He debunks a lot of the myths that
have annoyed us for so long, and points out that the earth has indeed
been much warmer than it presently is, and that the anomaly of a short
Ice Age - caused by volcanic debris blocking sunlight from the earth -
is the reason behind the apparent rapid increase. The atmosphere
is merely reverting to its long-term trend.
Ref.: Comment: "Ice Scares Aren't All They're Cracked Up To Be", Matt Ridley, The Times, 1/9/16.
Back to the D.B.E.I.S. news. They are currently considering
whether to appeal against the findings of the court over the awarding
of the contract to move radioactive material around the country, under
the guise of a "clean-up". See our article of 31/7/16,
"Something Nasty Which Leaves a Fishy Smell", below.
The political climate in France has deteriorated, with the result that
they are now hoping that Hinkley C is turned down in order that they
can have a real up-to-date reason for hating the British. On the
other side of the world the Chinese are still upsetting our other
hopeful nuclear provider, the Japanese, with their stance over the
South China Sea and some small islands that are now a bit bigger than
they used to be as a result of Chinese construction projects.
Presumably the true motive is the discovery of rare minerals under the
sea bed. However, Japan now wishes to dramatically increase its
budget for its armed forces, to supply them with modern equipment.
Would it be amusing to have both these companies building in the
U.K. at the same time, with the French as referee? Perhaps not.
We've mentioned earlier about the involvement of local and national
politicians. Their allegiance to the nuclear cause has paid
dividends in the past with various awards. The father of the
movement, Nuclear Jack Cunningham - Lord of the Realm - was recently
awarded a Japanese honour: The Rising Sun Gold and Silver Star.
Known for his love of all things nuclear, Lord Cunningham was
certainly influential in developing the dependency of west Cumbria on
nuclear development and this, at least, will have assisted Toshiba to
get its plans for "Moorside" on the table.
|
13/8/16
Chinese Taken Away
International politics are very strange and
difficult. You think you understand something, then all of a
sudden you don't know anything. Hinkley Point C has been on the
cards for years, each time it is almost due for an official start and
the copious and ostentatious signings of contracts is scheduled, along
comes another hiccup.
The nuclear industry works on the premise of not giving people time to
think about all the ramifications of a project. They have people
in high office (and local policitians, too), who are very willing to
support anything that expands or promotes nuclear development, no
matter what the cost to the community forced into hosting it.
(How many nuclear power stations are there in the Cotswolds?)
So Électricité de France, accompanied by China General Nuclear Power
tried to "bounce" the new Prime Minister into signing up for the
Hinkley project, despite widespread informed opinion that the whole
deal was impossibly expensive, too risky, and relied too much on
foreign powers. China General Nuclear Power is one of China's
state-owned company, under the direct control of the State Council,
comprised of members of the Communist Party of China.
For years now, a host of nations, including Russia, North Korea and
China have been accused of hacking into sensitive networks belonging to
Western powers. Not just individuals are being hacked, but all
the major companies and departments of state. The aim is to spy
on technical and commercial operations so that the hackers have a
distinct advantage.
The Five Eyes alliance is a secretive, global surveillance arrangement
of States comprised of the United States National Security Agency, the
United Kingdom’s Government Communications Headquarters,
Canada’s Communications Security Establishment Canada, the
Australian Signals Directorate, and New Zealand’s Government
Communications Security Bureau. The idea being that all those
countries share a bit of their intelligence for the greater good.
Australia has banned Chinese companies from being involved in sensitive
operations. It may well be for good reason: a Chinese man
who once worked for Westinghouse but is now a naturalised American, has
been charged with leading a conspiracy to steal American power
companies' secrets in order to speed up the development and production
of China's reactor technology. Because there is no proper
legislation available to support the accusation, the senior advisor to
China General Nuclear Power has been charged under legislation designed
to curtail proliferation of nuclear weapons. The timing is very
interesting, as the U.K. government will not be making the decision on
Hinkley until after the American courts have decided the case.
Meanwhile, in Japan, where 87% of the people are opposed to nuclear
development and the restarting of the reactors stopped following
Fukushima's disaster, there are moves to permit the government to
expand their military arsenal. Perhaps the fears over China's
claim to islands in the South China Sea are the real reason, but could
they have other things on their minds?
Amusingly, immediately after the decision not to decide was made, China
threatened to withdraw from other major projects if Hinkley (and
subsequently their own Bradwell development) did not go ahead.
Isn't that the type of behaviour that people in the U.K. are afraid of?
|
31/7/16
Something Nasty Which Leaves a Fishy Smell
We have long suggested that the actions of the nuclear industry are
ripe for the attention of investigative journalism. That
misleading statements are made, government and local positions
infiltrated by pro-nuclear activists or even nuclear company staff,
merely adds to our discomfort. Having seen what goes on in
Cumbria, it was of little surprise to learn that Électricité de France
staff had done the rounds in the Hinkley area to offer to place local
businesses on the approved list of suppliers and contractors.
Our view is that this is almost blackmail. The key question is
whether any company refusing to consider Électricité de France's
offer still make it onto the approved list? If the answer is
yes, then what is the point of the exercise? Or is the idea, as
we believe, to make suggestions that a business stands to gain - but
only if they support the Hinkley build?
That the Secretary of State for Business, Energy and Industrial
Strategy, Greg Clark, certainly caused a lot of fuss over the decision
to not decide about Hinkley until later in the year. It seems
that a government adviser has thoughts about nuclear and security (has
he been reading our site?) that don't fit with the requisite
pro-nuclear view. We are currently placing bets on their
longevity in the respective roles. Nasty news tends to attach
itself to those who don't agree with the nuclear industry.
People don't refer to the Sellafield mafia affectionately.
Radiation Free Lakeland has drawn our attention to the circumvention of
the rules in respect of nuclear waste dumping. Some controlled
releases into the environment will be permitted, as it apparently will
not affect other countries.
For us, though, the clincher was the High Court ruling that the Nuclear
Decommissioning Authority had cooked the books in relation to a
£7 billion contract to decommission a variety of nuclear sites.
The contract was awarded to a consortium of Babcock and Fluor,
known as the Cavendish Fluor Partnership, back in 2014. Babcock
Nuclear's website states, "We are strategic partners to Électricité de France Energy".
(Anyone recognise a pattern here?) The losing
company, Energy Solutions - which may be something of a misnomer, as
there is no solution to the problem of nuclear waste - sued the NDA, as
it considered that its tender was far better economically than the one
that Fluor had submitted. It seems they were right.
The judge, Mr. Justice Fraser, decided that the authority had "manipulated" the assessment and awarding of the contract. He went on, "It
sought to avoid the consequence of disqualification by fudging the
evaluation - to avoid reaching a situation where Cavendish Fluor would
be given a fail." He added that Cavendish Fluor should
have been disqualified, as Energy Solutions' was the most economically
advantageous tender, with a score 6% better than that of Cavendish
Fluor. To avoid any misunderstanding, the judge said, "By
the word 'fudging', I mean choosing and outcome and manipulating the
evaluation to reach that outcome. This was by choosing a score
high enough to avoid that undesirable outcome, rather than arriving at
a score by properly considering the content of the tender against the
scoring criteria." He also said, "There were manifest errors by the NDA in the evaluation of the tender".
The NDA are surely no strangers to evaluating contracts?
How could they make "mistakes" like this? It might almost seem
as if there is some mysterious and nefarious force at work.
However, Energy Solutions has launched a bid to reclaim the costs of
its bid and lost profits, so only the U.K. taxpayer will suffer the
loss. The claim is believed to be between £120 million and
£200 million. If it is successful, will there be a public
enquiry into the matter, or even - Heaven forefend! - a criminal
investigation. Will heads roll? Unlikely. Anyone
have a large tarpaulin to help the cover up?
In a
kindly effort to alleviate embarrassment to the NDA, the judge offered
that, "They may have been suffering from over-work". Given what
we
see going on around, we think he may be being just a little too kind.
By a huge coincidence, the Chief Executive, John Clarke, has
announced his retirement from the NDA. What will he do next, we
wonder.
Now the contract has been awarded, Cavendish Fluor have put up the
price by £1.6 billion. Nice work, but what is the point of
tendering for a contract if the bid price can be varied at will
immediately afterwards. Kindly note the euphemism, too, when
they refer to nuclear "clean up". Obviously there is no such
thing. All that happens is that the radioactive materials are
moved around, but the only thing that cleans up radioactivity is time.
Ref. http://www.the times.co.uk/imageserver/image/methode-times_prod_web_2
31/7/16
The National Audit Office's Verdict
It appears that whatever else happens to Hinkley, Électricité de France will
not be out of pocket. Should the British government decide to
come to its senses and put an end to the whole fiasco, it will still
cost the taxpayer £2.5 billion. Well done the experts at
DECC. In the event that it should go ahead, then we will be
committed to paying the French £30 billion in subsidies over 35
years. Of course, if at any time anything goes wrong . . .
Is it possible to force a foreign country to honour its
obligations and contracts? According to The Sunday Times, the
National Audit Office has done some sums and is due to report that :
Hinkley is "the world's largest and least appropriate private finance initiative deal."
Goodness only knows that successive governments have instigated some
scandalously poor private finance initiatives or PFIs as they are
known. The strange thing is that this agreement with Électricité de France
has been around for years and no-one has shown it for what it is.
Why would that be? Aren't DECC's civil servants supposed
to be smarter than this? Given the verdict in the above article
about the awarding of a contract to an less-worthy winner, is there not
something we should know? Who is too friendly with whom?
Who has shares in what? What rewards and awards are/were in the
offing on completion of the Électricité de France deal? Certainly a lot of Cumbrian people should be in line for awards for services to the nuclear industry.
Sadly their legacy will endure for centuries after they are gone.
Which prompts the thought: if the deal does fall through
and nuclear is properly judged for what it is, then will the likes of
Électricité de France, NuGen and Horizon be required to
reinstate the land they have damaged? Obliged to restore it to
its original state? It is a lovely idea - but will it happen?
Should it not happen?
31/7/16
Clean Up or Just Shove It Out of Sight? Burying Bad News
While other sources are concentrating on the cost of the mess that is
Hinkley, the cost of cleaning up nuclear sites is being overlooked.
The amount of the clean up is somewhere aroung £117
billion at the moment, but that is possibly just another fudged figure.
Again, we note the euphemism "clean up". What it means is
burying as much as they can get away with, then shipping the rest
elsewhere for longer term burial or storage. There is no true
clean-up at all. The means does not exist.
Happily, Braystones Beach afficinados can rest secure in the knowledge that the Environment Agency believes:
“The conclusion, based on the currently available information, is that the overall health risks to beach users are
very low and significantly lower than other risks that people accept when using the beaches.”
So,
nothing to worry about, except that the above statement does not say
that there are no risks from radioactive particles and other effluents
pertaining to using the beach. Why, then, are there no signs
warning the unwary of a potential danger? Around the coasts of
the U.K. there are signs advising on local conditions, such as strong
currents, rip tides, pollution, etc. Why is there nothing from
Seascale up to St. Bees and beyond? The authorities are aware
that particles are being found - it is they who are finding them, after
all. Is Dunster's experiment still continuing?
A cynic might believe that if the particles are out there, pose a
potential health and safety risk, however small, then something,
somewhere ought to be being done about it. Instead, akin to
poking a hornets' nest, NuGen are drilling holes in the area so it
resembles something akin to Swiss cheese. Amazingly, it would
appear that they have not found any radioactive materials. They
stated at the outset that if any were found then they would cease
operations. Operations have not been halted.
31/7/16
Dump Criteria
Looking at the Energy Solutions website, we can see that they have a
site at Clive, in Utah, U.S.A., where they store all the depleted
uranium from obsolete weapons. The specification for the site is
very interesting:
The Clive site lies on top of one of the most stable geological basins
in the United States. Layers of naturally occurring impermeable
clay, which are necessary to safely enclose the waste, are in natural
abundance. The area surrounding the Clive Facility is also
exceptionally arid with low precipitation and high evaporation.
The groundwater that does exist is twice as salty as ocean water,
and therefore cannot be used as a source of drinking water or
irrigation.
So, not a bit like Cumbria then? The average rainfall is 3
metres per year in Cumbria, in Utah they have 470 mm. See if you
can spot the other differences.
31/7/16
Political Buck-passing
.
We wrote to the Office for Nuclear Development to report our concerns
about the proposed intensification of rail use apropos
the transport of nuclear materials - it being their
responsibility. Despite what the law appears to say, we were
wrong, apparently. It is the Office of Road and Rail. The
ONR are only responsible for the flasks containing the nuclear
material. What they actually said was:
Regarding
the regulations relating to the movement of radioactive materials in
the UK - ONR is the Great Britain (GB) Competent Authority (CA) and
Enforcing Authority for the civil carriage of UN Class 7 (radioactive
material) goods. The civil transport of radioactive material in GB is
regulated under Part 3 of The Energy Act 2013 and The Carriage of
Dangerous Goods and Use of Transportable Pressure equipment Regulations
(CDG) 2009.
All
duty holders (consignors, carriers, consignees) have legal obligations
under the UNECE modal regs (ADR, RID and ADN) which are implemented in
GB through CDG
ONR
is the regulator and competent authority for the Flasks (Spent fuel
packages) you refer to in your letter. These are assessed against
International Requirements set by UNECE modal regs and we review
the operation and design of these packages on a periodic bases to
ensure they still meet these standards.
ONR
is not the regulatory for Network Rail, this is the responsibility of
the Office of Rail and Road and you will need to direct your concerns
about the condition of the track and infrastructure to them.
Previous experience with the ORR or Network Rail does not fill us with
deep respect or faith in their desire, or ability, to do the right
thing. We may give it a try shortly. Whatever else, the
changes that NuGen are proposing will not improve safety along the
line, nor will it improve the amenity for those who live close to it.
However, the final paragraphs say:
ONR’s
Safety Assessment Principles include the principle that “The
safety case should take account of any hazardous installations on or
off the site that might be affected by an incident at the nuclear
facility” (SAP ST.5). This means that NuGen need to
consider the potential impact of incidents at Moorside on safety at
Sellafield throughout the development of the Moorside safety case and
that Sellafield need to consider the potential impact of incidents at
Sellafield on safety at Moorside during routine reviews of the safety
case and the periodic reviews of safety that are required to be
undertaken under Site Licence Condition 15.
In addition, both site operators are required to identify hazards from,
evaluate risks of, and mitigate against, radiation accidents
(under the Radiation (Emergency Preparedness & Public Information)
Regulations) – and to review their assessments at least every
three years and following any material change that may impact on their
existing assessment. Therefore, any external hazard that
operations on one site present to the other shall be taken into account
so that each operator shall take all reasonably practicable steps to
prevent any identifiable radiation accident and limit the consequences
of any such accident which should occur.
We make this observation in our Stage 2
consultation response. It is sheer nonsense to even contemplate
building the proposed "Moorside" site in the buffer zone designed to
protect Sellafield's scandalously vulnerable site.
31/7/16 updated 13/8/16
DECC Moves in Mysterious Ways
We sent in a Freedom of Information request to DECC (as it waa back
then) on the 16th June, 2016. The subject was not directly
connected with NuGen's project, but closely related to it.
Automatic response was received, assuring us that our request would be
dealt with within 15 days, and thanking us for writing to them.
On the 22nd of July, having recieved nothing from DECC, we tried a
reminder. Another automated response, but then nothing.
We have now learned that the reason we received no answer was that the
window was too wide. We have now re-submitted the request with
(for now) a narrower focus. Answers by the 8th September, all
being well.
7/6/16
Why Stop Moorside?
A quick summary of the points on which we have based our objections. Most are expanded on in other articles.
1. Flawed design which has no secondary containment
i.
Potential for corrosion in reactor vessel - exacerbated by the
dampness and salty atmosphere from its position on the coast.
ii. Would not withstand a terrorist attack, even with a concrete outer shell.
iii. Untried and untested
design - despite what the NuGen staff told the public at the Braystones
consultation meeting, there are no AP 1000 reactors "up and running".
iv. Reactor widely condemned as unsafe; allegations that the design has cut corners to reduce costs.
2. Environmental impact
The only way
to dissipate the output of the thermal equivalent of 6 GigaWatts
(6,000,000,000 Watts - the equivalent of 2,000,000 three-bar electric
fires) is via direct discharge to the
atmosphere/environment. In essence, a tremendous amount of
heat needs to be got rid of, either by heating the air considerably, or
by warming the Irish Sea considerably; neither are likely to have
a beneficial effect. See the article on the FACTs page, entitled, "Further Thoughts on Cooling Towers", for more details.
NuGen have confirmed they do not know what
impact discharging that amount of heat into the Irish Sea would
have. Attendees at consultations have regularly been given
misleading, incomplete, conflicting or incorrect
information. e.g. The disparate statements from
two members of staff over the heating impact of the discharges were
confusing. Would it be 1 - 2° or 10 - 13°?
3. No published financial data
Are NuGen
going to gain from the Électricité de France (Électricité de France)
negotiations, which have been widely recognised as an extremely
expensive and long-term commitment?
Would they gain the same £92.50 per kW/h? This is 2½ times the current price of electricity.
The deal with Électricité de
France guaranteed this level of income, index linked, for 50
years. Have NuGen been promised the same?
What subsidies and guarantees have the U.K. government made to NuGen and are the EU authorities aware of them?
Where is the money coming from for the new-build and all the additional resources - NuGen or the British taxpayer?
Toshiba recently had to admit to overstating
their profits by $1,220,000,000 - a fact known about by top management
who were subsequently obliged to resign in disgrace. Are
they deserving of our trust to build and supply our power?
4. Lack of Planning
The proposed
site is immediately alongside "the most dangerous chemical works in
Europe". An event at either could have devastating and
exponential effect.
How would the alarm systems be made distinctive & recognisable?
Any changes to the topography and ground-water
flow may have an adverse effect on the SSSIs that are based on singular
hydrological phenomena.
It is not possible to foresee all consequences and mitigate against them.
NuGen propose mitigation for animals, but none is mentioned for residents.
5. The proposed sites are contaminated by radioactive material
Land
contamination at the adjacent Sellafield/Calder Hall/Windscale site
amounts to 13,000,000 cubic metres of soil. The
contamination is not likely to have been restricted to just those
sites, but would also have affected the Moorside site, with the
potential for affecting construction workers and local communities.
At least one aquifer near Sellafield is known
to be radioactively contaminated. Digging large holes in
its vicinity may change ground-water flow.
The two harbours proposed, together with the
cooling water pipelines, are in the area where the highest number of
finds of radioactive materials occurs. The disturbance of
these sediments, sands and soils would inevitably pose a risk of more
radiation-related illnesses amongst residents and workers.
Furthermore, the area is a designated marine conservation
zone. The immediate area affected is the only remaining
section of undeveloped beach and is admired by visitors and
holiday-makers from all over the country.
Details of the larger of the two harbours are
not made known clearly.
Enquiries produced the statement
that only the smaller one would be permanent - but the larger one may
in fact, also become permanent, according to yet another of
NuGen’s
expert consultants.
6. Unnecessary development of amenities
The alleged
“improvements” to the area are unnecessary and only of
benefit to NuGen and its potential employees. Existing
resources are mainly adequate for the current usage by locals and
visitors.
The development would kill off the tourist
industry, in the same way that visitors are already deterred by
Sellafield.
The current landscape is natural and cannot be "improved" by anything that NuGen designs.
The development would be a significant
encroachment on the seascape and an ugly intrusion, visible for long
distances, thus producing an even greater loss of visual amenity from
land and sea.
7. Outmoded concept
The
large-reactor template is now to be superseded by smaller reactors
which can be located nearer point of need, thus reducing transmission
line losses and costs, major and expensive changes to the National
Grid, while also providing more flexibility in the National Grid.
8. The consultation process is flawed
Braystones beach residents (and others) failed to receive NuGen communications in a timely fashion.
The data from the current borehole survey would not be available until the consultation process has closed.
That the consultation has failed is evidenced by the small number of respondents: 0.5% of Copeland’s population.
9. Infra-structure
Construction
traffic - goods and personnel - would be using roads totally unsuitable
for the traffic which would be generated and there are no means of
by-passing any accident or incident which blocks the road.
The current road situation cannot handle even
a single exodus of staff during shift changes, so, should there be an
"incident" – at either one or both sites, or if shift changes at
Sellafield and Moorside coincide, it will be impossible for emergency
vehicles to get through and departing staff and the public to escape
the area.
A detour could require a 90 mile trip.
In the event of, say, heavy lifting equipment
being required, or additional emergency services, it would take too
long for them to get to the site.
Braystones residents have long complained
about the state of the level crossing and railway infra-structure to no
avail. They have pointed out that the line still relies on
an infra-structure designed by Stephenson over 160 years ago. It
is single-tracked and remotely controlled. No attempt is
made to address the danger. None of the proposed railway
spurs around the main site are included in the make-believe pictures
provided by NuGen.
At Braystones, there have been 93
incidents between 5/1/10 and 3/4/15 (Network Rail data). Is
such a line suitable for nuclear transport?
Other incidents include
derailments, bridge collapse under a chemical train which resulted in
the destruction of two bungalows, and several landslips.
There are still a number of complaints about the state of the railway
line outstanding and unresolved. The proposed changes would
not improve that section of line.
Increased rail traffic will cause problems for those living alongside
the line: nuisance from greater and more frequent noise and
vibration, more frequent and longer waits to cross the line.
Will trains run during anti-social hours?
10. Ultimate Waste Disposal
There is no statement about the amount of waste that would be produced, nor its ultimate disposal.
It is likely that all high level waste would
need to be stored on the site for at least 50 years. This
means that there would be an even greater spread of highly toxic
materials with all that would attract a terrorist attack.
The sole means of disposal of highly
radioactive waste is a GDF (Geological disposal facility - or
underground dump.)
Where is this dump? None has been
built, its location remains undecided, and its long-term ability to
contain the high levels of radioactive materials is almost impossible
to predict. Even if one were built, the necessary treatment
of such waste needed to enable its dumping, is proving impossible to
achieve and of insufficient longevity.
Statements about half-lives
mislead. No human-built structure has ever lasted the many
tens of thousands of years over which some of the materials would
remain dangerous and need to be kept safe. For some of the
products, the passage of one half-life is insufficient to render them
safe, and some would need the expiration of several half-lives before
they can be handled. Ultimately, the
underground dump would leak. Is this a satisfactory
solution – just leave it to other generations?
NuGen's documentation (Consultation Document,
Stage 2, May, 2016, P. 47, Para 5) envisages encapsulation in buildings
which haven't yet been built and whose process is not adequate to make
the waste safe for the entire time that some of it would remain
dangerously active.
Encapsulation does not endure
indefinitely. Eventually, the capsules break down and the
radioactive materials enter the environment. The higher the
radioactivity contained in a capsule the shorter the lifespan of the
encapsulation.
How would the waste be removed and transported to the envisaged encapsulation process and, ultimately, the underground dump?
When the inevitable leak occurs, deep
underground and in a highly radioactive environment, how would it be
resolved and who would clean it up? By the time it was detected it would be too late anyway.
11. Intrusive Nature of the National Grid Connection
The plan
necessitates the construction of two chains of highly intrusive pylons
several miles long in an area only just outside the Lake District
National Park, and they, the Moorside site and the Sellafield complex
would all combine to produce the effect of a highly-industrialised area
in a totally inappropriate setting, and clearly detrimental to the Lake
District National Park which is only a short distance away.
The attractions of natural long-distance landscapes and seascapes will be adversely affected. Permanently.
12. Distortion of Political and Social Scene
Suggestions
have been published that the nuclear industry has been having an
excessive influence on the area - from commercial, educational, social,
and political standpoints.
When the need for construction workers abates,
the area would become further depressed and unemployment would further
exceed the national norm.
Housing stock proposed to be built would become redundant as workers move away, thus depressing house-prices.
More nuclear development means ever-greater dependency on it for the economy, to the detriment of other livelihoods.
13. Overuse of natural resources
The site would
demand copious quantities of water which would be drawn from a variety
of sources. Most of these contribute to the natural beauty
of the Lake District landscape. Water supply is already fully utilised.
14. Impinges on basic human rights
NuGen should
accept that their plans would have a devastating effect on residents
during the construction and commissioning phases of the project and,
effectively, for ever. Just the announcement of the plans
has blighted property prices and caused hardship, as well as feelings
of stress, insecurity and instability. It also seems likely that NuGen's plans would impinge on the human
rights of residents, who are entitled to a peaceful enjoyment of their
own homes
For the above reasons, we believe that the flaws in the consultation
process, together with the above concerns, are conducive to an
application for a judicial review. Some of the failures and
deliberate untruths must surely merit legal challenge, too.
When the nuclear plants have worn out, all
that will be left for local Cumbrians is the toxic waste and spoilt and
contaminated land.
The project at Moorside, if allowed to go ahead, is set to survive, in
one form or another, for hundreds of years. Its legacy
would endure far beyond that, probably for millennia. Is
that really the best that west Cumbria can think of - to leave this
dangerous, untreatable, toxic mess to perpetuity? Surely we are
better than that?
8/6/16
"There are three kinds of lies: lies, damned lies, and statistics.”
Benjamin Disraeli Crichton, 1965
Reading
through the NuGen sales brochure - it is not possible to consider it a
consultation document - may unintentionally give some a misleading
impression. We note elsewhere the questions posed, and express
our incredulity at, the published figure of 73% in agreeing in response
to "Do you agree with the need to develop a new nuclear power station
at the Moorside search area?" Then you consider the question:
Are respondents agreeing with the need for a new power station,
that it needs to be nuclear, or that it needs to be at Moorside? Or all three, or any combination of alternatives?
Then look at the published figure of 73% "in favour". This is 263 people out of a mere 375.
NuGen's own documentation says that 12,000 people a day can be
served in Sellafield's canteen, which is where NuGen
held one of their meetings.
Can the 73% figure allegedly in favour of one of the points in the question be extrapolated
to represent a proper indication of the wishes of the general
population? No. Yet that is how it is intended to be interpreted we believe. Utterly deceitful.
How many thousands will be affected by
the proposed development? According to official statistics, in
2011 (the latest we can find) there were 70,603 Copeland residents.
So far then, NuGen have received responses from 0.5% of the
residents and of them 263 people or 0.38% of the entire population of
Copeland agreed. Not quite as pro-nuclear as the NuGen version.
Some of the responses came from Allerdale residents who are
virtually unaffected, but we have not included those in the
calculations, to the benefit of NuGen's propaganda.
Then we have to question why the second most-pro-nuclear council in the land, Allerdale, has been included. Adding in the 90,000 Allerdale residents to the above calculations roughly halves the above results.
Looking at the maps and reading list of changes NuGen are going
to impose, if they have their way, it is difficult to see what impact,
if any, the proposed development would have on those residents.
From the maps, there is no way of telling what connection the respondent
has with the nuclear industry, or any obligation or benefit arising
therefrom.
Were the Allerdale respondents included to dilute the responses from those who object to the proposals? Surely not.
However,
such a low response to the consultation process does confirm our
suggestion that the consultation is flawed and/or just not working.
Properly done a reasonable consultation could be expected to
attract at least 30% of the population, engaging them sufficiently to
prompt them to respond. We believe that a proper census would
reveal that the vast majority of residents would be against nuclear
development, especially on such a large scale and of such longevity.
However, they have not been made fully aware of the impact of the
proposed Moorside development.
|
28/6/16
Toshiba's Plans Branded "Unrealistic"
Nuclear Fallout After Referendum
The plans
for Toshiba's nuclear development are "unrealistic", according to a
Senior Analyst at Moody's. The new CEO of Toshiba claims that
the aims were achievable, despite having only taken over the job last
week following the resignation of his predecessor after a $1.3 billion
accounting scandal. We wonder whether he really knows what is
going on and whether he fully considered the ramifications of the exit
of the U.K. from the European Union - including the fall of the pound
on international markets. This must surely mean that the cost of
building Moorside will rise, making it even less viable in the longer
term,
According to the article published by Reuters, "Given
strong anti-nuclear power sentiment after the Fukushima nuclear
accident in 2011 and delays in plant construction, we believe this
target is unrealistic."
Ref.: http://uk.reuters.com
We agree with Reuters as the U.K.'s nuclear authorities criticise the
progress made in rectifying the 51 faults in the Westinghouse AP1000
reactor. (Westinghouse is owned by Toshiba.) They are
also concerned about the quality and tardiness of the associated
paperwork. Still, we are supposed to believe that they are on
schedule. We shall see. How long before the first delays
are announced and how big will be the increases in construction costs.
In our article on the Facts page, "A Matter of Trust", we mention that "Sources
said previously that one of the investigators' theories was that top
executives, worried about the impact of the 2011 Fukushima disaster on
nuclear business, set unrealistic targets for new operations such as
smart meters and electronic toll booths."
Seems like they are never going to learn. Let us hope Toshiba
have stopped cooking the books and won't need to cut any more corners
on the AP1000 design. In any case, given the number of similar
reactors that Toshiba are hoping to build around the globe, won't there
be difficulties meeting the need for specialist steels, construction
materials, control circuitry, and skilled manpower?
Out of interest, Hitachi, who were planning on building a couple of
nuclear power stations, including Wylfa, have said that they will have
to "take stock and assess the situation".
Hitachi's official statement says: "A
potential departure from the EU creates uncertainty in terms of
economics, trade, skills and talent - particularly in manufacturing,
and would affect the stability that we need for continued investment
and long-term growth."
Ref.: http://www.hitachi.co.uk/about/press/pdfs/Hitachi%20EU%20statement.pdf
The referendum result caused losses of $2,000,000,000 for investors.
The worst single-day losses in history. Amazing that
Toshiba aren't affected. Britain's sovereign debt credit rating
was lowered by Standard and Poor's agency. Also downgrading the U.K.'s financial status are Fitch and Moody's.
So, no problems with
£multi-billion investments, eh? It is therefore difficult
to understand why some parts of that other really stupid idea, HS2, may
not be built. So 200 mph into a field somewhere in
Staffordshire, perhaps?
The other interesting thing is the reaction to the departure from the
EU on the part of our erstwhile firiends. Hopefully their
attitude will cause the politicians here to look at who our friends
really are - after all, we were going to share so much with them all -
and pay them for the pleasure!
|
28/5/16
Consultation?
Does
issuing reams of propaganda and sales literature, lining the walls
of the consultation venues with huge propaganda posters
and making statements that try to persuade people the matter of
building a nuclear reactor is already done and dusted and the public
can like
it or lump it, constitute a meaningful version of consultation?
We think not.
The engagement of a PR firm to
do their dirty
work for them does not
excuse NuGen from their obligations to properly consult. This is
about a development which is, after all, going to seriously impose on
Cumbria for at least 100 years and probably an awful lot more.
PR companies are glorified salesmen, interested only in pleasing their
client and obtaining their fees. They are not people in a
position to
explain the full impact of the proposals on the amenity, environment
and lifestyle, of thousands of residents.
There should be a moratorium on new nuclear building at least until the
industry can demonstrate (not just theorise) that they can deal with
the waste they produce and keep it safe from the environment and
terrorists.
Please take a look at https://nugenconsultation.com/wp-content/uploads/2016/05/Proposed-Scheme-Overview.pdf,
where NuGen have published "illustrative impressions" of the proposed
site. They are noteworthy for omitting the Sellafield site
in its entirety and, according to the illustration, the entire site
appears to be unfenced. Still, they say they will build a
(radioactive?) mud wall. According to our memory, there used to
be a railway line between the site and the sea - where on earth can
that have disappeared to? This is an electricity generating
plant, yet there doesn't seem to be any way of connecting to the
national grid on the pictures. So, why are the National Grid
people saying that they need 150' high pylons stretching across the
landscape? Surely this propaganda is not intending to mislead or
be dishonest in any way?
Also
minimised is the building of a power station, presumably to supply
emergency power. What fuel will this be using and will its
pollution include CO2? Does that CO2 get
counted in the list of nuclear pollutants, or does it, like so many
other parts of the cycle, get ignored in order to perpetuate the myth
that nuclear is in the slightest bit clean?
The
proposed works include the marine off-loading facility, which we would
call a harbour, and the circulating water system, which we would call
submarine radiators, which will provide cooling water from the Irish
Sea. They can only do that by exchanging the heat generated by
the reactors for cooler water - which means, of course, that the sea
will become a lot warmer, especially in localised areas and during
the summer months when there are relatively few storms to circulate the
waters. There is no mention of the impact that dissipating
twice the thermal output of the reactors into the confines of the Irish
Sea will have, either locally or globally. On the
same page as the illustration above, NuGen continues that it may be
necessary to regulate the use of the marine off-loading facility
(replete with inappropriate capitalisation to make it seem impressive)
and waters around it "in order to provide a safe marine management environment, so the DCO [Development Consent Order] Application is likely to include a request for powers to establish a Harbour Authority".
No mention is made of the proposed longevity of this proposed harbour,
nor any indication as to why marine management - safe or otherwise,
depending on viewpoint - might be necessary.
As well as the reactors themselves there will be "support buildings, a substation and a circulating water system (including a forebay) [whatever one of those might be!] using water from the Irish Sea." Happily, earthworks required to "accommodate
temporary laydown areas and bunds (to be re-profiled postconstruction)
for screening, noise reduction and landscaping" will protect
everyone from any unpleasantness. (Won't the soil be
contaminated from the 1957 Sellafield fire?) The blurb continues,
"Elsewhere on the identified
development site there will be replacement habitats, environmental
offsetting, common land replacement, flood plain compensation (if
required) and Public Rights of Way (“PROW”) diversions and
other amenity diversions." As well as the
capitalised marine off-loading facility, NuGen will build a bridge
across the River Ehen floodplain and (note the inappropriate capitals -
so, again, it must mean something grand) a Heavy Haul Road, and new
rail spurs and facilities. Several new roads in the area are also
planned. When it comes to drainage, everything will
magically disappear down a grid into the Irish Sea. Will it be
checked for radioactivity before being discharged? Fresh water
needs have yet to be achieved, but the River Ehen and a few local lakes
might become somewhat smaller in the future.
Having spent some considerable time reading the sale pitch supplied at
the Braystones meeting, and knowing how people we have spoken to are so
against the project, it was somewhat surprising to read the
overwhelmingly positive view expressed by so many people, to questions
like:
Do you agree with the need to develop a new nuclear power station at the Moorside search area? 73% in favour.
Do you agree with our transport strategy for the Moorside Project being
rail-focused to minimise road usage, particularly at peak
times? (88%)
The maps depicting the origin of the responses being analysed provided
no clues of course. Then we recalled reading an earlier
paragraph where a meeting had been held in Sellafield's canteen.
Now where else would you expect to find such supportive evidence?
NuGen say that up to 12,000 people use the canteen each day.
We also have to wonder why Allerdale council are being given
such a strong role, but then remember that Copeland and Allerdale were
the only councils in the whole of the U.K. that wanted to host the
nuclear dump. Allerdale are as pro-nuclear as Copeland.
You can supply your own reasons for that distortion.
At the end of May, in Keswick, 90% of the people spoken to by
representatives of Radiation Free Lakeland were opposed to new nuclear
build in Cumbria. As Ms. Birkby point out, this does not
tally with what NuGen are saying, which is that “Cumbria wants
new nuclear build.” She goes on, "A recent poll in
the Evening Mail indicated that 85% of those voting do not want new
nuclear build in Cumbria. Tourists said they would think
twice about coming to Cumbria if dangerous new nuclear reactors were
built here."
Ref.: https://mariannewildart.wordpress.com/
You
just have to love the marvellous lack of vocabulary that the presumably very
expensive, but not very knowledgeable, PR firm staff seem to
have. Apart from the unnecessary capitalisation mentioned,
they invent new words, for example, "signalised"
to describe changes to road junctions. Unknowledgeable?
Well, we haven't yet received any answers to any of the questions
posed. Either they don't know, or 'wait and see' seems to be the
response.
Amusingly,
the propaganda goes on to mention the various improvements that will
result to the environment as a result of becoming home to even greater
nuclear hazards than those already extant: completely
ignoring the fact that the area is naturally beautiful and wouldn't
need any of the enhancements that NuGen are proposing if it weren't for
NuGen. Should we really be grateful? The losses
will be far greater than the gains in our opinion. As we
have always said, improvements in road and rail links, health services,
education, sports facilities, leisure facilities, skills and training
are the job of government and local politicians to provide, not the
carrot at the end of the stick in a blackmail arrangement.
Even so, we are at a loss as to understand how and why they think they
can improve the visual amenity, or why there needs to be investment in
landscape and townscape to improve the visual appearance of the
area. Better than God then? How does the
imposition of their great ugly mess, complete with the destruction of a
huge swathe of rural lifestyle, compounded by its proximity to
Sellafield, actually fit into their propaganda?
 |
 |
What
a misleading picture is the one on the left above, scanned from NuGen's
propaganda - sorry
information sheet. An object lesson in how to mislead the public
without words. This was once a beautiful area, but then came
Sellafield's ugly and dangerous sprawl. Now they propose to add
this in the farmland to the upper left of the Sellafield picture.
So determined are NuGen to mislead the public, missing are
the two harbours (aka Marine Off-loading Facilities), the
railway line - with new spurs into the site, and not least for a power
generating site, no
indication of the hundreds of 150' high pylons that will have to be
built in order to take away the
produced electricity. Or is that little arrangement, which might
possibly be a pylon, in the bottom left truly indicative of the
impact? Isn't it at the incoming power end, rather than
the main National Grid connection end?
Where is the road access and "Heavy Haulage Road" mentioned elsewhere in the glaringly misleading guff?
One
wonders, too, where the fresh water supplies and site drainage
facilities are, but perhaps they are too unsightly to be shown.
It
is also difficult to reconcile this with other pictures offered in other
NuGen literature, which we must presume are solely the product of
a fevered artist's imagination.
The
cooling water pipes, we assume, are depicted at top right, but seem to
be inadequate for the purpose of cooling three reactors, surely?
We note what are possibly the cooling water ponds open to the atmosphere,
with all the
potential for leakage and environmental impact that that implies.
Not only that, but surely, if there are no unshown boundary works, there will be absolutely no protection
from either coastal erosion or the winter storms. Yet for the
last three years there have been huge storms over winter, and this
design is supposed to endure for over 120 years!
So much is
missing the whole thing is a travesty. Still, at least by doing
it from on high they have minimised the vertical intrusion - the
reactor vessel alone is 91' high.
Let's
issue a challenge to NuGen: get your artist off his waccy baccy, give
him/her the true plans -- with all the conveniently missing bits like
cooling towers and pylons.
Give instructions that the impression must show how it looks when added to Sellafield, and
let them be drawn from, say, Cold Fell.
Let's see how intrusive this
proposal really is.
|
Let's issue a challenge to NuGen: get your artist off his waccy
baccy, give him/her the true plans- with all the conveniently missing
bits like cooling towers and pylons, how it looks when added to
Sellafield, and let them be drawn from, say, Cold Fell. Let's
see how intrusive this proposal really is
We wonder, too, about Westinghouse's claim that it achieves "The highest levels of safety" when it relies "100% on natural forces for indefinite passive core cooling".
According to nuclear power expert, Arnie Gundersen (http://www.fairewinds.org/), if anything should cause the reactor vessel to be breached, natural convection currents will dissipate not only the heat,
but also the entire contents over a very wide area, as there is no further method of containment.
|
14/6/16
Sorry, In The Heat of The Moment We Missed Something:
Deceipt By Omission
2.24
Cooling water for the power station is proposed be drawn from the Irish
Sea via an intake structure (or structures) mounted on the sea bed. The
water would then be conveyed via a tunnel (or tunnels) under the sea
bed to the power station via a forebay structure (a large balancing
tank). A pumping station would be used to overcome the head difference.
2.25 Cooling water would be returned to the sea via a dedicated outfall
tunnel, located under the seabed. It is likely to be within 2 to 6 km
offshore, but sufficiently far from the intake(s) to prevent
recirculation of the returned cooling water. The Scoping Report states
that it is anticipated that cooling water demand will result in the
intake and discharge of approximately 45 cubic metres per second
(cumecs) of water per reactor. The three reactors will generate a total
demand of approximately 150 cumecs, which will be discharged into the
marine environment.
2.26 The Scoping Report states that a range of process effluents and
surface water drainage from the operational power station are also
likely to be discharged into the sea with the cooling water.
No
matter how much water they are pumping through the system, the fact
remains that they have to dissipate huge amounts of heat, either
directly into the atmosphere via the cooling towers, or into the Irish Sea via the under-sea heat exchangers (radiators in effect). CO2
is not the sole producer of global warming. Direct heat cuts out
the middleman, but it is surely just as effective as heat produced by CO2.
As with the developments listed in the foregoing article, there is no
sign of cooling towers in any of the literature. We consider
this to be dishonest and deliberately misleading. The usual
design of tower associated with nuclear power stations is known is a
hyperboloid cooling tower. They are generally between 330' and
660' high. So, very prominent then. Why are they missing
from the "indicative view of the Moorside site" supplied by NuGen?
It is certainly indicative of the misleading information on
offer to the public. How could a professional artist miss two
harbours and at least one, probably more, cooling tower from his
"impression" if it is intended to convey any idea to the general
public. The latter are in for a very nasty shock when they wake
up and find two harbours, two (at least) sets of extremely high pylons
striding across the countryside, conveniently just missing - but still
plainly intrusively visible from - the Lake District National Park, and
a couple of cooling towers rising to over 300'!
One might think cooling towers are innocuous things, merely using water to get rid of unwanted heat. However,
if seawater is used (convenient when near to the coast), the drift of
fine droplets emitted from the cooling towers contain nearly 6%
salt, which is deposited on the nearby land. According to
Wikepedia:
"This deposition of sodium salts on the nearby agriculture/vegetative
lands can convert them into sodic saline or sodic alkaline soils
depending on the nature of the soil and enhance the sodicity of ground
and surface water. The salt deposition problem from such cooling towers
aggravates where national pollution control standards are not imposed
or not implemented to minimize the drift emissions from wet cooling
towers using seawater make-up.
"Respirable suspended particulate
matter, of less than 10 micrometers (µm) in size, can be present
in the drift from cooling towers. Larger particles above 10
µm in size are generally filtered out in the nose and throat via
cilia and mucus but particulate matter smaller than 10 µm,
referred to as PM10, can settle in the bronchi and lungs and cause
health problems. Similarly, particles smaller than 2.5 µm,
(PM2.5), tend to penetrate into the gas exchange regions of the lung,
and very small particles (less than 100 nanometers) may pass through
the lungs to affect other organs. Though the total particulate
emissions from wet cooling towers with fresh water make-up is much
less, they contain more PM10 and PM2.5 than the total emissions from
wet cooling towers with sea water make-up. This is due to lesser
salt content in fresh water drift (below 2,000 ppm) compared to the
salt content of sea water drift (60,000 ppm)."
If that isn't worrying enough, the entry then continues:
"Being
very large structures, cooling towers are susceptible to wind damage,
and several spectacular failures have occurred in the past. At
Ferrybridge power station on 1 November 1965, the station was the site
of a major structural failure, when three of the cooling towers
collapsed owing to vibrations in 85 mph (137 km/h) winds.
Although the structures had been built to withstand higher wind speeds,
the shape of the cooling towers caused westerly winds to be funnelled
into the towers themselves, creating a vortex. Three out of the
original eight cooling towers were destroyed, and the remaining five
were severely damaged. The towers were later rebuilt and all
eight cooling towers were strengthened to tolerate adverse weather
conditions. Building codes were changed to include improved
structural support, and wind tunnel tests were introduced to check
tower structures and configuration."
Let's hope that there are no corners cut to save on costs at Moorside.
See the Facts page for more thoughts on the subject.
|
 |
 |
A
view of the Sellafield site from the north.
The farmland in the
foreground is where they are proposing to dig to install Moorside.
Note Black Combe and Corney Fell in the background; round to the left are the
lakeland fells and some of the highest mountains in England, including
Scafell Pike, Great Gable and Lingmell, with the Langdale Pikes also
visible. |
Did they miss a trick?
After all, if they really wanted to capture the hearts as well as the
minds of the children in the area, then this might have been a better
piece of propaganda. |
Even the 6,400 at peak employees will have to come from outside the
area, so the "virus" that has caused so much trouble with cancers and
leukaemia in the area will become even more prevalent. If it
isn't really a "virus", but down to the pollution from nuclear power
plants, how many more cancers and radiation-related illnesses can we
expect? How many cases before it becomes intolerable?
Radiation is known to cause cancers and leukaemia, so that is where our
beliefs lie. The disturbing of age-old discharges cannot be considered
sensible or safe under any circumstances.
Last
year there were only just over 4,000 unemployed people in the whole of
Cumbria. It seems likely that many of them would not have
the skills required to perform technical tasks to the level required in
this project.
NuGen will be helping "improve" the towns in the area, too, apparently. If
the buildings designed by the people working for Sellafield in the area
are anything to go by, then we can look forward to modern blocks which
will have no connection whatsoever with the characterful Georgian style of
Whitehaven and its hinterland. In yet another artist's impression, this time of the main entrance, there
seems to be a high fence between the car park and the main part
of the site. The fence seems to be higher than the
single-storey office block! Funny it doesn't appear on the other
pictures.
Funny how the old Pow Beck failed so spectacularly, yet is now
available for NuGen to build on. Almost as if it were
preordained. Same old lead planner, too.
Still,
we will have the benefit of cycling and walking connectivity, supply
chain opportunities, training, and everything else that even retired
people would regard as Utopia, but don't we already have sufficient for
our needs? Who will be the main beneficiaries? NuGen
staff, perhaps? So, no NuGen, no need . . . Why are they trying to con us this way?
The
cultivation and nurturing of local politicians is certainly paying off
handsomely. (Play your cards right and you could end up with an
MBE, or even better a well-paid job with, er, Nugen.) How many of these people are in some way
beholden to the nuclear industry? Anywhere else in the
country would be up in arms about the ideas that are being presented by
NuGen as a fait accompli. Here they are being
welcomed. Why? Even if there are no "incidents"
- a euphemism if ever there was one - the nuclear industry continually
produces, and in some cases discharges, considerable amounts of the
most toxic materials in the world. How can they be allowed
to do this?
|
8/6/16
Social Services?
We
have examined the sales brochures supplied by NuGen to sell the idea
that the scheme is a fait accompli and that the great majority of
people are in favour. We remain unconvinced.
Nothing
appears in the brochures to explain how many people will really be
coming into the area. We are told that the peak number of workers
will be 6,500. We know that the majority of these will be from
outside Cumbria. Presumably they will be bringing with them family
and, perhaps, friends. Let us assume that the national norm of a
partner and some children will be brought in with the breadwinner;
this means that there will be around 1300 adults. Families, according
to national statistics are comprised of two adults and an average of
1.8 children - further 5,200. In total then, 18200 new residents can
be expected to arrive. Rather more substantial than NuGen's figures.
The
next glaring omission is any suggestion as to how the requisite
increases in health and social services provision will be achieved.
Presumably there will be a need for sexual, physical and mental health
service to be greatly increased to meet the likely demand. How many
extra GPs will be required and from whence will they come? Similarly
with all the emergency services. More police, ambulance and fire
service personnel and equipment will be required.
Will the 5,200 additional children all manage to find places in schools, colleges, etc.?
All
this seems to indicate that those clever people in London, encouraged
by the blinkered NuGen personnel, have completely misunderstood how the
rural community is made up. This is a place where we currently have
four trains a day - not four every three minutes - on none at all on
Sundays and Bank Holidays. The roads do not permit emergency vehicles
to travel at great speeds, and blue lights and two-tone horms have
little benefit down our kind of road.
One of the basics of human
rights is the supply of clean pure water. NuGen are expecting United
Utilities to come up with an answer to their needs - presumably
following Sellafield's example of not paying for anything either. Yet
United Utilities do not magically produce water on demand. It has to
come from a stream, river, well, or spring. in a
treatable form. Because of the great reliance on water to
places like Moorside, the supply has to be guaranteed under all
circumstances. For this area it will mean pipelines being laid,
tapping into a canalised and covered River Ehen, even greater
quantities being extracted from the local lakes. (We note that NuGen
are suggesting they could tap into Sellafield's supply-line, which
would mean further vast drainage of Wastwater, recently voted the most
beautiful view in Great Britain.) Wherever it comes from or goes to
once used, the impact on the environment is not going to be good.
Such schemes may benefit those who live in towns and cities far away
who want electricity to waste, but, rest assured, Cumbria is not going
to be enhanced by any of these proposals.
NuGen documentation "does not include an assessment of the potential likely significant environmental effects of the Freshwater Water Supply". How convenient.
Ref.: Moorside Stage 2 Consultation Document. May, 2016, Item 5.9
We mention elsewhere the unsuitability of the transport network and
roads. There is considerable congestion at peak hours already,
even with only the Sellafield traffic. Nowadays, 40% of families
have second cars, so around another 9100 cars may be expected to add
themselves to the traffic jams. This is without construction
traffic and heavy loads.
|
Off The Rails
NuGen
have grandiose plans for railway "improvements", working with Network
Rail. Well, good luck to them on that venture. We have
been "working with Network Rail" for most of the last decade trying to
bring the Braystones level crossing up-to-date. Virtually
nothing of any consequence has changed, despite residents averting a
passenger train derailment observed by an inspector from the Office of
the Rail Regulator. Sadly, the latter individual didn't recall
hearing the train driver explain why he hadn't received the urgent
message from the Sellafield signaller: "We got a garbled message
over the radio, but couldn't understand it, so decided to continue on
to Sellafield to find out what the problem was. Radio signals
are always rubbish on this stretch". This, of course, meant that
to get to the signaller he would have passed over the very section that
was likely to cause the train to derail. On the FACTS page of
this site we have included a photograph of an accident caused by the
failure of a small girder bridge that had badly corroded. As a
result of the bridge's collapse a railway wagon and load - somewhere
around 70 tonnes - dropped off the embankment and completely demolished
two bungalows. By pure good chance they were both empty at the
time. A slightly different time would have resulted in several
fatalities.
Braystones Residents’ concerns include:
1) The antiquity of the signalling and train-control system. This is
160 years old and does not comply with modern safety standards. It puts
crossing users at risk and would be difficult to justify in the event
of an accident, especially when seen in the light of modern
technological advances. These advances include radar detection of the
presence of people, vehicles, and other obstructions. Such a modern
system would automatically inform all parties – users,
signallers, and train staff – of the status of the crossing, and
is available now.
2) Failure to provide lighting at the crossing after the passage of the
last scheduled train. Such a system would be automatic, cheap, and in
compliance with ORR safety literature.
3) The stability of the banking on the landward side of the track.
4) The integrity of the bridge to the north of Braystones. Not just
from the stream that washes its foundations, but the amount of water
that seeps through the block-work.
5) The physical requirements of the operation of the crossing gates and
the unreliability of the telephone communications system.
6) The state of the ballast due to poor drainage at Braystones station.
7) Failure to achieve any material safety changes at the crossing,
despite several years of lobbying by Braystones Beach residents,
individually and collectively.
8) A survey needs to be conducted to assess whether the angles of the
embankments is suitable for the level of stability required of them.
9) Assessments need to be conducted to assess the impact of the
corrosive salt atmosphere on an infra-structure now over 150 years old
and which has received scant attention in that time.
10) Network Rail should undertake a more positive rôle when it
comes to protecting its assets and ensuring the safety of residents and
crossing users.
Nugen's
plans do not resolve any of these. Even the onus for protecting
the proposed new nuclear site is on Network Rail. The idea being
that it will be Network Rail's responsibility to maintain the sea
defences in the event of storm damage. Only when Network Rail
give up will NuGen think about it.
Residents now have additional questions: how much extra traffic
are they supposed to endure; what mitigation can there be against
the noise and vibration of frequent heavy railway trains; will
the more frequent passage of trains mean that beach residents will have
to spend considerably longer each day awaiting permission to cross;
will there be trains during anti-social hours?
The Braystones level crossing has 65,312 vehicle crossings a year -
substantially more than the 23,180 suggested by a brief assessment by
Network Rail. (Figures from Network Rail. FOI request for Sellafield signaller's log.)
Between 5/1/10 and 3/4/15, there were 93 incidents at the
crossing. Increased traffic will surely mean increased
incidents. As we have said from the beginning, a single accident
involving a nuclear train will cost far more than bringing the line up
to current standards. We posed the question: if you were
building a line here today would you build it like this? There
was no answer.
Due to our concerns, we have written to the Office for Nuclear
Development for their opinion, as they are responsible for enforcing
the legal requirements for the transport of hazardous materials [e.g.
nuclear loads].
| | |